Nyeste anskaffelser av intercity jernbanearbeid i Norge
2023-09-19E03 Narvik Station (Bane NOR SF)
The project involves alterations to Narvik Station to accommodate increased train length and capacity for train traffic. A new track 5 will be constructed for LKAB, and the track arrangement will be adapted to accommodate 750 m long ore trains and freight trains. At the same time, repairs will be made to the substructure and track where major wear and tear has been detected and upgrading is needed.
Vis anskaffelsen »
2023-01-06Train parking Hove - turnkey contract for main works (Bane NOR SF)
The turnkey contract includes the construction of 8 depot tracks with places for 16 train sets of the type Flirt 74. The turnkey contract includes both railway construction and railway technical disciplines, and, among other things, the contact wire installations from Hove to Fåberg will be upgraded.
The stabling facility must facilitate easy maintenance of the train sets with functions such as interior washing, water filling and toilet emptying. A new technical building will be established.
Vis anskaffelsen »
2022-05-02SUN 01 - Train parking Drammen and renewal Sundland (Bane NOR SF)
SUN01 Train parking Drammen and renewal Sundland is a multi-disciplinary contract with substructure and railway engineering work at Sunderland. The contract consists of upgrades to railway engineering installations in order to implement ERTMS and capacity increasing measures in the area. In addition a new train parking site is to be established with 7 tracks south-west for Sundland repair yard.
Vis anskaffelsen » Nevnte leverandører:BaneService AS
2022-03-10Train parking facility Tønsberg (Bane NOR SF)
A new train parking facility with 14 spaces divided into 7 tracks, a technical building and a service building, substructure work for connection tracks and sections of a new double track.
Vis anskaffelsen »
2020-12-09KS-1 The Hestnes Tunnel (Bane NOR SF)
KS-1 The Hestnes tunnel. A turnkey contract that includes substructure works from Kleverud to Espa and construction of the Hestnes tunnel.
The works are divided in three lots, further described in Appendix A:
Day zone Kleverud (1.0 km)
The Hestnes tunnel (3.1 km)
Day zone at Espa (0.2 km) and Labbelva railway bridge (approx. 10 m)
The works are expected to start during Q4 2021. The works are planned to be completed during Q1 2026.
Vis anskaffelsen »
2020-10-05Cross Cut Skøyen, K2C (Oslo kommune v/Fornebubanen)
Fornebubanen [the Fornebu Line] is a new underground line between Majorstuen and Fornebu. The line will be approx. 8 km long and will in its entirety run through an underground tunnel. The line will be connected at Majorstuen Station and end in a new Fornebu Base and station. Six stations will be built along the stretch.
This contract, K2-C ‘Skøyen Cross Cut', deals with one of many cross cuts needed to drive the underground line tunnel. The cross cut at Skøyen will handle tunnel driving between Skøyen …
Vis anskaffelsen » Nevnte leverandører:NRC Anlegg AS
2020-05-28Turnkey Contract Nittedal Station and Passing Loop (Bane NOR SF)
The turnkey contract includes an expansion of the passing loop at Nittedal station and measures for the station area. The project includes the establishment of universally designed platforms, demolition and re-establishment of a transition bridge, facilitation for future development of ERTMS, building new contact line system adapted for AT system. 245 parking lots, 3 bus parking areas and an area for parking bicycles shall also be developed.
Vis anskaffelsen »
2020-05-25Tunnel and Foundation Works Lysaker - Fornebu - K2A (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new underground stretch in a connected tunnel system from Majorstuen in Oslo to Fornebu in Bærum. The railway will be approx. 8 km long with six stations; Fornebu, Flytårnet, Fornebuporten, Lysaker, Vækerø and Skøyen.
The contract works period is approx. 2.5 year The contract includes tunnel and foundation works from Lysaker to Fornebu and stretch from the contract border west of Lysaker station to the tunnel portal at Fornebu station.
Tunnel works shall be executed - …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2020-04-02New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo metro and Oslo tramway, as well as owning several operating subsidiaries. Sporveien will through the project — New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo metro network, including depots, the new line from Majorstuen to Fornebu ('Fornebubanen') and equipping and modifying the rolling stock.
The main objective …
Vis anskaffelsen » Nevnte leverandører:Siemens Mobility ASSiemens Mobility GmbH
2019-11-26New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo Metro and Oslo Tramway, as well as owning several operating subsidiaries. Sporveien will through the project New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo Metro network, including depots, the new line from Majorstuen to Fornebu (‘Fornebubanen’) and equipping and modifying the rolling stock.
The main objective …
Vis anskaffelsen »
2019-09-11Signal/Tele, Operational and Maintenance Services (Bybanen AS)
The contract will cover fault corrections as well as ongoing change and maintenance work on the infrastructure that Bybanen AS is responsible for, on infrastructure for the light rail and trolley buses, within signal, tele, IT, and electro disciplines.
Vis anskaffelsen »
2019-02-27D51 Tracks (Bybanen Utbygging)
Contract D51 covers the track work and superstructure for the main line for BT4 (from Bergen City Centre to Fyllingsdalen), the Løvstakken depot, the deviation tracks and the direct connection at Kronstad and the Kronstad and Kristianborg tail tracks. Furthermore, it covers the track work for for the new Kaigaten tram stop and the reconstruction of three sections of main line track from building stage 1 at Kaigaten, near Bystasjonen and at Inndalsveien in Kronstad, where connections to BT4 have to be made.
Vis anskaffelsen » Nevnte leverandører:Steconfer, SA
2018-10-31Turnkey Contract, Kvam Passing Loop (Bane NOR SF)
Turnkey contract, Kvam passing loop. The contract includes the engineering design and the construction for:
— an extension of the current passing loop,
— the completion the remaining substructure works from a previous contract,
— a new contact wire installation,
— conduits,
— upgraded low voltage system with a new network station,
— ground frost works,
— the reconstruction of a level crossing,
— the upgrading of the current NSI-63 contact wire installation with adaptations for all interchanges for the …
Vis anskaffelsen » Nevnte leverandører:BaneService AS
2018-09-11Public transport measures Bispegata with Oslo torg (Oslo kommune v/ Bymiljøetaten)
The Agency for Urban Environment would like to procure a Contractor for building and construction work for the project.
Public transport measures Bispegata with Oslo torg. The project is a part of “Samla Plan”. The Agency for the Environment and Transport has asked Sporveien AS and the Agency for Urban Environment to prepare a total plan for upgrading the tram infrastructure, including other upgrade measures in streets and urban areas that are serviced by trams. The project is a collaboration between the …
Vis anskaffelsen »
2018-08-31Street and Tram Renovation in Thorvald Meyers gate (Oslo kommune v/ Bymiljøetaten)
The Agency for Urban Environment would like to procure a contractor for building and construction work for the Street and Tram Renovation in Thorvald Meyers project. The project is a part of “Samla Plan”. The Agency for the Environment and Transport has asked Sporveien AS and the Agency for Urban Environment to prepare a total plan for upgrading the tram infrastructure, including other upgrade measures in streets and urban areas that are serviced by trams. The project is a cooperation between the Agency …
Vis anskaffelsen »
2018-06-19Street and tram renovation in Storgata (Oslo kommune v/ Bymiljøetaten)
The Agency for Urban Environment would like to procure a contractor for building and construction work for the street and tram renovation in Storgata project. There is a need to upgrade Storgata as a public transport route and for pedestrians. The upgrades to the public transport route /upgrades to the infrastructure will be carried out in connection with the planned procurement of new trams in Oslo under the management of the tram programme. The project is a cooperation between the Agency for Urban …
Vis anskaffelsen »
2018-03-14Upgrade of Grefsenveien Øvre - Road, tramline and laying new pipelines for water supply (Sporveien AS)
Grefsenveien Øvre is a cooperation project between Sporveien, the Agency for Urban Environment and the Agency for Water and Sewage in Oslo municipality. The project is included in the investment portfolio 'Total plan for upgrading the tram infrastructure', which shall prepare the city for new trams. The project is for a complete road and tramline upgrade from Storo to Disen, approx. 500 m. The aim is to increase accessibility for trams and to facilitate cyclists. In addition, the water and sewage network …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2017-12-28Framework agreement for technical consultancy services, modifications and repairs (Norske TOG AS)
The objective of the procurement is to combine Norske Tog’s purchase of technical consultancy services and modifications and repair assignments in several disciplines. The framework agreements shall ensure Norske Tog quick access to capacity and specialised competence in technical consultancy and performance of modifications and repairs of the entire train stock. The agreements shall facilitate long-term and develop collaboration between Norske Tog and the service providers.
Vis anskaffelsen »
2017-12-04Procurement of ISA, AsBo and NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project “ERTMS National Imolementation“ with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with one supplier on the following;
— Independent safety assessor (ISA),
— Assessment body CSM-RA (AsBo),
— Notified body TSI CCS (NoBo).
The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver.
Vis anskaffelsen » Nevnte leverandører:CertiferSintef
2017-03-20ISA, AsBo og NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project 'ERTMS National Imolementation' with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with 1 suppler on the following:
— Independent safety assessor (ISA);
— Assessment body CSM-RA (AsBo);
— Notified body TSI CCS (NoBo).
The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver.
Vis anskaffelsen »
2016-06-24Preparatory work for tracks Sandbukta — Moss — Såstad (SMS 5) (Jernbaneverket (The Norwegian National Rail Administration))
Contract SMS 5 Preparatory work for tracks is a preparatory contract for the project IC Moss Sandbukta — Moss — Såstad. This contract involves altering tracks south of Moss station in order to be able to build a completely new station in the centre of Moss. This is so that we can have normal train traffic and the existing station in operation for the entire construction period for the new Moss station. This is a multi-disciplinary contract that includes both building and construction work, as well as all …
Vis anskaffelsen »
2016-03-14EPC Railway Systems Oslo S (Jernbaneverket [The Norwegian National Rail Administration])
The work includes the completion of engineering design services, mainly
work drawings and the execution of railway engineering work for the Østfold railway and
the Follo railway from the two altered tunnels at Oslo S, through a new tunnel in Klypen
towards the portal in Ekebergåsen. The track for the incoming Østfold railway continues
through the tunnel constructed by EPC D&B until the South Portal at
the Bekkelag tunnels. The outgoing Østfold railway track comes from the tunnel in Klypen
and will be …
Vis anskaffelsen » Nevnte leverandører:Infranord Norge As
2016-02-09Hell-Værnes, E11 — Alteration of the existing NSI-63 relay system (Jernbaneverket [The Norwegian National Rail Administration])
In connection with the project Hell-Værnes High Speed Increase and Capacity, and as as result of a new bridge over the Stjørdal river, alterations shall be made to the existing signal installations at Hell station. Hell station has a relay system of type NSI-63.
The signal work includes:
1. The establishment (and removal) of temporary signal installations in 3 directions at Hell station;
2. The demolition of the existing external signal installations on the station's B side;
3. The construction of new …
Vis anskaffelsen » Nevnte leverandører:Veidekke Entreprenør As
2014-05-01E01 – Preliminary works (Jernbaneverket)
Rombak station is the middle of 5 stations on the Ofot railway between Narvik and the Swedish border. The station is 20.8 km measured from the Fagernes terminal in Narvik and approx. 21.1 km from the Swedish border. Contract E01 is for parts of the ground work/substructure for an extension to Rombak passing loop on the stretch 20.460 km - 22.200 km. This includes an expansion of the rock cuttings along the western part of the station area including transport the mass. The contract includes using the mass …
Vis anskaffelsen »
2014-04-28Two way tram in Prinsens gate (Oslo kommune Bymiljøetaten)
The aim of the assignment is to establish a 2 way tram in Prinsens gate as well as give the street an aesthetic lift from the junction Fred Olsens gate to Nedre Vollgate (over Wessels plass). In addition Tollbugata is to be established as a 2 way bus street.
The quarter is characterised by heavy traffic and a street network that is overloaded. Prinsensgate and Tollbugata are currently 1 way streets that have buses and trams. These streets take most the public transport through the centre. The streets are …
Vis anskaffelsen » Nevnte leverandører:Torpol Norge
2014-03-24EPC Oslo S (Jernbaneverket)
The contract covers construction work for the new Follo Line and the Østfold Line between Oslo Central and Eker Bergsåsen, as well as works up to the tunnel entrance at Ekebergåsen. The work extends over a distance of 1,7 km. The work includes both the sub-structure and signal systems. The turnkey contract for Oslo Central also includes the completion of the sub-structure building and signalling installation for the incoming Østfold line between the tunnel entrance at Eker Bergsåsen and Sydhavna, over a …
Vis anskaffelsen »
2014-03-22UHN 18 Railway engineering works - Interdisciplinary works (Jernbaneverket)
In connection with the development of a new double track Holm-Nykirke, a major job that covers almost all professions shall be carried out in addition to the major contracts for each profession.
Contract UHN18 Interdisciplinary works Holm-Nykirke consists of track, contact line, low voltage, tele, signal and accompanying works. The works will be carried out in the interface between the existing and new installations in the open air zones and works with earthing in the tunnel.
In addition contract UHN18 …
Vis anskaffelsen »
2014-01-09Replacement of tram tracks Sandakerveien (Sporveien Oslo AS)
The project is a collaboration between Oslo municipality / Water and Sewerage Authority (VAV),: Agency for Urban Environment (Bymiljøetaten) and Sporveien Oslo AS, where Sporveien has the responsibility of General Contractor. Scheduled completion of the work is in 2014.
The acquisition includes full replacement of approx. 470 meters double tram tracks in Sandakerveien, between Åsengata and Hans Nilsens Hauges street. Work includes over and under building of storm water facilities..
Water and drains on …
Vis anskaffelsen »
2013-12-09Rehabilitation of Hasle rectifier station and the Rommen/Ammerud rectifier station (Sporveien Oslo AS)
The acquisition applies to the rehabilitation of the Hasle rectifier station and the Rommen/Ammerud rectifier station.
The rectifier stations have been in operation over the expected lifetime and it is therefore a need for rehabilitation (of the electrical equipment). There shall also be a need for some structural updates and adaptations for the new equipment that shall be installed.
The following works/deliveries are covered by the acquisition: 12 kV switchgear systems, rectifier transformers, station …
Vis anskaffelsen »
2013-11-12Lørenbanen - O1 – Superstructure (Sporveien Oslo AS)
The Lørenbanen project includes a 1.6 km long double track metro stretch of tunnel between Sinsen on Centrumsbanen (metro ring) and Økern on the Grorudbanen, with an underground station on Løren of which approximately 1,100 m rock tunnel and approximately 500 m outdoor rail track (including a concrete tunnel). In addition, there shall be established a new substructure and superstructure of approximately 500 m stretch on Grorudbanen between Hasle station and the culvert towards Økern. The scheduled …
Vis anskaffelsen »
2013-10-03Track and substructure work on the stretch Bråten to Ljabru — the Ekeberg railway (Sporveien Oslo AS)
Sporveien Oslo AS (Sporveien) invite companies to a negotiated procedure with prequalified applicants in accordance with the utilities regulations for the procurement of track and substructure work on the stretch Bråten to Ljabru — the Ekeberg railway.
The aim is to cover Sporveien's need for track and substructure work on the stretch Bråten to Ljabru — the Ekeberg railway.
The contract work will include track work and substructure work on the stretch Bråten to Ljabru, a new stop at Sæter, a new Sæter …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2013-09-25201306189 - UHN11 - Tracks/contact line (Jernbaneverket)
TRACKS:
A total of 14,3 kilometers of new double tracks shall be built on the stretch Holm - Nykirke, of which 12 km are in the tunnel.
New Holmestrand Station is situated in the middle of the new tunnel and has 4 tracks, of which 2 are platform tracks. There are a total of 9 switches on the route, (4 switches 1:15 R760, 4 switches 1:18,4 R1200 and 1 switch R2500 1:26,1). All switches shall be provided with movable crosses.
Concrete sleepers (JBV60) with Pandrol Fastclip FE attachment shall be …
Vis anskaffelsen »
2013-04-17UHN 11 - Railway engineering (Jernbaneverket)
This qualification is for a contract for railway engineering professions in the project Holm - Nykirke (UHN). The Holm - Nykirke lot is 14,2km of which 12,3km consists of a tunnel. Holmestrand station is in this tunnel in a rock hall and 11 escape tunnels will also be constructed. There is a lot of activity in and outside the tunnels and tenderers must reckon on extensive cooperation with other actors in the project.
The estimated construction start is February 2014. A contract will be signed until …
Vis anskaffelsen »
2013-03-22K-51 Relief base building and substructure contract (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) would like to enter into a contract with a contractor that can carry out the contract works K-51 Avløs base building and substructure contract.
The contract is for the construction of a new operational base at Avløs where a new building shall be constructed including HVAC and sanitary installations and electrical installations. The contract also includes a substructure for the track area and outdoor works.
Expected start of works: 1.10.2013.
Expected completion of …
Vis anskaffelsen »
2012-12-27K-36 Track works Avløs - Kolsås (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS would like to enter into a contract with a contractor that can provide contract works K-36 Track works on the stretch Avløs - Kolsås (12,7 - 16,4 km) on the Kolsås railway. Total approx. 7 400 m individual track with the accompanying conductor rail, including 13 points.
Expected start of works: 1.6.2013.
Expected completion of works: 1.12.2014.
The awarding authority will provide the sleepers, prime movers, points as well as the conductor rails with possibly assembly. The …
Vis anskaffelsen »
2012-11-06Lørenbanen - O1 – Superstructure Grorudbanen (Kollektivtransportproduksjon AS)
The Lørenbanen project comprises a 1.6 km long double track underground tunnel between Sinsen at Centrumsbanen (underground railway) and Økern on the Grorudbanen, with an underground station at Løren, of which approx. 1100 meters is in mountain tunnel, and approx. 500 metres in day area (includes concrete tunnel). In addition to establishing a new substructure and superstructure of approx. 500 m stretch of Grorudbanen between Hasle stasjon and culvert at Økern. Planned completion of the project is during …
Vis anskaffelsen »
2012-11-05K-35 Hauger og Kolsås stations (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) wishes to enter into a contract with a contractor that can supply construction work for K-35 Hauger and Kolsås stations.
The contract K-35 Hauger and Kolsås stations includes the following works:
Establishing a new substructure for section Hauger - Kolsås on the Kolsåsbanen, new station facility at both the Hauger station and the Kolsås station according to the quality standards set on subway routes and stations in Oslo, called ‘metrostandard’, new rectifier station …
Vis anskaffelsen »
2012-10-19Security personnel, Ski station and more (Jernbaneverket)
The Norwegian National Rail Administrations Development Division (U) issues an invitation for the procurement of security personnel mainly for the depositing tracks located in and around Ski station.
In addition the contract will include parts of the route located on the Follo Line; Ski Station and the Langhus – Ski stretch. However, during the contract period a separate invitation request for the procurement of security personnel for the Follo Line will be issued.
In connection with the work that is …
Vis anskaffelsen »
2012-10-05General contract substructure and railway engineering for Lillestrøm Hensetting (Jernbaneverket)
Jernbaneverket shall expand the capacity for stationing trains in the area by Lillestrøm service area. The capacity shall be increased from the current 6 passenger trains to 13 trains with a length of 110 metres. The service area shall be adapted for daily and periodic service and maintenance assignments. In addition Banedivisjonen's area (the operational base) shall be renovated and new tracks established. The contract involves substructure (mass replacement with reinforcement and lower ballast layer, …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2012-07-17Contract works, Lamberseter railway, stages 3 and 4 (Brattlikollen - Bergkrystallen) (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS, henceforth referred to as the Awarding Authority, invites to a tender competition with negotiations with prequalified tenderers. The tender competition is in accordance with the Supplies Regulations. The contract involves contract works for the Lambertseter railway stages 3 and 4 (Brattlikollen - Bergkrystallen).
The following works shall be executed (overview, only):
— Complete upgrading to Metro standard for the stations Brattlikollen, Karlsrud, Lambertseter and …
Vis anskaffelsen »
2012-07-17K-34 Gjettum station (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjnon AS (KTP), henceforth referred to as the Awarding Authority, wishes to enter into a contract with contractors who can execute the contract works K-34 Gjettum station. The works include construction of a new substructure for the parcel Gjettum station, new station facility in accordance with the metro standard and new technical buildings.
The contract also includes construction of pedestrian culvert below the track line and a countersunk track line below Levretoppen. Option …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2012-05-11K-33 Avløs station (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) would like with this notice to enter into a contract with a contractor that can carry out the contract works K-33 Avløs station. The works will consist of the construction of a new track route with a substructure, new underground station in accordance with the metro standard, new technical building, footbridge over the track route, as well as a new bridge over Avløsveien. In addition the works will include station electro, noise and insight screens and gardening …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As