Nyeste anskaffelser av Oslo kommune v/Fornebubanen
2020-10-05Cross Cut Skøyen, K2C (Oslo kommune v/Fornebubanen)
Fornebubanen [the Fornebu Line] is a new underground line between Majorstuen and Fornebu. The line will be approx. 8 km long and will in its entirety run through an underground tunnel. The line will be connected at Majorstuen Station and end in a new Fornebu Base and station. Six stations will be built along the stretch.
This contract, K2-C ‘Skøyen Cross Cut', deals with one of many cross cuts needed to drive the underground line tunnel. The cross cut at Skøyen will handle tunnel driving between Skøyen …
Vis anskaffelsen » Nevnte leverandører:NRC Anlegg AS
2020-05-25Tunnel and Foundation Works Lysaker - Fornebu - K2A (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new underground stretch in a connected tunnel system from Majorstuen in Oslo to Fornebu in Bærum. The railway will be approx. 8 km long with six stations; Fornebu, Flytårnet, Fornebuporten, Lysaker, Vækerø and Skøyen.
The contract works period is approx. 2.5 year The contract includes tunnel and foundation works from Lysaker to Fornebu and stretch from the contract border west of Lysaker station to the tunnel portal at Fornebu station.
Tunnel works shall be executed - …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2020-01-21Ground Work for Fornebu Station and Base (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new underground stretch in a connected tunnel system from Majorstuen in Oslo to Fornebu in Bærum. The railway will be approx. 8 km long with 6 stations: Fornebu, Flytårnet, Fornebuporten, Lysaker, Vækerø and Skøyen.
Most of the work under this contract will be:
— demolishing the existing buildings at Fornebu south, a total of approx. 75 000 m buildings,
— clearing the building matter, loading, transport and disposal at a certified site,
— excavating and blasting a …
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2019-12-20Independent Inspections (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new 8 km long underground railway that will go from Majorstuen to Fornebu 6 new stations are to be established as part of the new route, as well a new workshop and a base at Fornebu. The entire railway will go in a tunnel, which means there will be comprehensive ground work in both rock and sensitive uncompacted matter.
The project would like to engage a tenderer who can carry out the statutory independent inspection for the entire project, both in the engineering design …
Vis anskaffelsen »
2019-11-12Building Inspections, Subsidence, Noise, Vibration and Dust Measurements (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new 8 km long underground railway that will go from Majorstuen to Fornebu. Six new stations are to be established as part of the new route, as well a new workshop and a base at Fornebu. The entire line will be in a tunnel and entails comprehensive ground works in both rock and sensitive uncompacted materials with subsequent impact on the external environment through vibration impacts on the surrounding neighbouring buildings, and subsidence, noise and dust impact. The …
Vis anskaffelsen » Nevnte leverandører:Bergcon AS
2019-10-24Building Inspections, Subsidence Levelling, Noise, Dust and Vibration Measurements (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new 8 km long underground railway that will go from Majorstuen to Fornebu 6 new stations are to be established as part of the new route, as well a new workshop and a base at Fornebu. The entire line will be in a tunnel and entails comprehensive ground works in both rock and sensitive uncompacted materials with subsequent impact on the external environment through vibration impacts on the surrounding neighbouring buildings, and subsidence, noise and dust impact. The buildings …
Vis anskaffelsen »
2018-11-28Procurement of project management for the Fornebu Railway (Oslo kommune v/Fornebubanen)
The aim of the procurement is to enter into a framework agreement for consultancy services for the Fornebu Railway within project management, engineering design management, contract advice, progress planning and finance and document control.
The contracts are divided into the following sub-contracts and tenderers can submit tenders for one or several sub-contracts.
— Sub-contract 1: Project management, engineering design management and contract advice.
— Sub-contract 2: Progress planner, finance …
Vis anskaffelsen »