2018-01-22   Track renewal, the Solør railway 2018 (Bane NOR SF)
Bane NOR SF invites tenders to participate in a competition for changing the tracks on the Solør railway in 2018, + an option for 2019 + 2020. Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2016-03-14   EPC Railway Systems Oslo S (Jernbaneverket [The Norwegian National Rail Administration])
The work includes the completion of engineering design services, mainly work drawings and the execution of railway engineering work for the Østfold railway and the Follo railway from the two altered tunnels at Oslo S, through a new tunnel in Klypen towards the portal in Ekebergåsen. The track for the incoming Østfold railway continues through the tunnel constructed by EPC D&B until the South Portal at the Bekkelag tunnels. The outgoing Østfold railway track comes from the tunnel in Klypen and will be … Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2014-09-18   UFP-11 — Bed and contact wire (Jernbaneverket)
Contractors shall be procured for the construction of the bed and contact wire installations for the development project Farriseidet-Porsgrunn. The contract is for 20.76 km double track and 1.75 km single track. Crushed gravel, sleepers and rails shall be laid, as well as the establishment of the accompanying contact wire installations, including auto transformers. Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2012-09-27   Track and contact line work for a new double track for the railway Langset - Kleverud (Jernbaneverket Utbygging)
As a part of the Joint Project New E6 and Dovre Railway a new double track shall be constructed for a railway between Langset and Kleverud. The new track is 17km long and runs along the east side of Mjøsa north of Minnesund. This contract is for all track and contact line work for the new double track. The work shall be carried out in the period from spring 2013 to autumn 2015. The work will be carried out in three main phases for the phasing in of the new tracks. Parallel with the track and contact line … Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2011-11-14   New double track Oslo - ski, contract JBT-91, ski st. side tracks (Jernbaneverket)
See the tender documents for further information. Start of works approx. January 2013. All the work is expected to be completed by 17.8.2014. This includes clearing up and removing equipment. The main aim of contract JBT-91 is to establish side tracks for train operators at ski station. The works involve technical railway works for the initiative "Establishment of side tracks" and consist of works from phase 00.40 to main phase 20. Contract JBT-91 Superstructure, contact line, electricity installations, … Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As