2022-12-02Tunnel upgrade Oslo E18 Sjølyst and Bygdøylokket (Statens vegvesen)
When the E18 was built, Hoffselva was led in a pipe under a road. The road has since had settlement damages above the pipe and the pipe's capacity is now insufficient. The pipe will therefore be dug up and replaced with a new culvert construction that crosses under Sjølystlokket.
Due to the geographical proximity, the establishment of a new culvert for Hoffselva and the renovation of Bygdøylokket and Sjølystloket will be carried out in a joint contract. The annual daily traffic count on this part of the …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2020-11-251000285 New Water Supply Fornebu — Storøya — Sandvika Vest Entreprise E1 — Excavation Contract (Bærum kommune)
The project will be carried out in order to increase the capacity and security of the water supply in Fornebu after a decision has now been made to increase the number of houses and workplaces in Fornebu significantly in relation to the development assumption at the start of the century. The Fornebu area will be given a two-sided water supply. The pipeline is dimensioned to have high pressure, 17 bar in Sandvika and Fornebu. A water pipeline will be established both on land and at sea in stages in …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2020-09-29Establishment of a Cycle Lane and Pavement in Tåsenveien (Oslo kommune v/Bymiljøetaten)
A decision has been made to upgrade Tåsenveien with a cycle lane and pavement.
Tåsenveien is an important connection between Ring 2 and Ring 3. The stretch that is to be upgraded goes from Stavangergata to Rolf Wickstrøms vei (Ring 3) at Tåsen centre. The total stretch is approx. 1.3 km. A cycle lane has previously been established from Stavangergata to Ring 2. The measure will increase accessibility and traffic safety on the stretch and there will be a continual cycle lane between the centre of Oslo and …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2016-02-17Main water pipeline — Lot S (Ullensaker kommune)
Ullensaker municipality shall construct a new water treatment facility at Hurdalsjøen so as to increase the security and capacity of the water supply. As a part of this, new transfer lines shall be constructed from the water treatment facility to the connection point just north of Rutholen. The transfer pipelines consist of 4.3 km of submarine pipeline and 11.4 km of land pipeline, divided between three lots. This tender documentation is for marine pipelines.
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2014-11-21TP10487/12372 Project New National Museum K203 Piling/Drilling (Statsbygg Hovedkontor)
Contract K203 is the second major ground contract for the project New National Museum at the Vestbane site in Oslo.
Contract K203 consists of the following:
— Installation of steel core piles mainly from rock and a concrete work platform lying on uncompacted matter.
— Installation of uplift anchorage (rod stays and lace stays
— Excavation of minor pits outside the construction pit for the installation of steel core piles.
— Excavation of minor pits within the construction pit for the installation of pile …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2012-07-17K-34 Gjettum station (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjnon AS (KTP), henceforth referred to as the Awarding Authority, wishes to enter into a contract with contractors who can execute the contract works K-34 Gjettum station. The works include construction of a new substructure for the parcel Gjettum station, new station facility in accordance with the metro standard and new technical buildings.
The contract also includes construction of pedestrian culvert below the track line and a countersunk track line below Levretoppen. Option …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2012-05-11K-33 Avløs station (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) would like with this notice to enter into a contract with a contractor that can carry out the contract works K-33 Avløs station. The works will consist of the construction of a new track route with a substructure, new underground station in accordance with the metro standard, new technical building, footbridge over the track route, as well as a new bridge over Avløsveien. In addition the works will include station electro, noise and insight screens and gardening …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2011-11-03E16 restoration of Nes tunnel. Demolition, securing (Statens vegvesen Region sør)
Nes tunnel on E16 in Hole Municipality shall be restored. This contract comprises demolition, clearing and protection works in connection with downsizing the arch, building and installations in tunnel.
The tunnel has a length of 1 265 m, cross section T9, and was opened in December 1988.
The work mainly comprises:
Demolition and removal of approx. 20 000 m2 of humidity and frost protection arches of PE foam protected with shotcrete, and two technical installations built of blocks of lightweight …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2011-10-05K-50 preliminary works Avløs base (Kollektivtransportproduksjon AS)
Through this publication Kollektivtransportproduksjon AS (KTP) wishes to enter into a contract with a supplier who can deliver the contract works K-50 preliminary works Avløs base. The works comprise demolition of existing buildings, mountain quarrying in connection with new access road to the base, removal of masses in connection with new track area and basement constructions for new buildings, new site accesses, and reservoir.
Planned contract signature: approx. 1.3.2012.
Planned start date: approx. …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2011-04-05Fv.98 Parcel 4, Laggosvingen - municipal boundary Gamvik/Tana (Statens vegvesen Region nord)
The scope of this contractual work will be from profile number 13 950 – 18 350 meter:
The scope of this contractual work will be from profile number 13 950 – 18 350 meters, except side terrain which starts by profile number 13 800 meters. Side outlet on the left side of the road starts approx. by profile 13 850 meters, see planned drawing.
The type of work will mainly be rock blasting and moving of blasted rock, as well as laying of base foundations, wearing course and adjustment of soil incline. The …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As