Nyeste anskaffelser der leverandøren NRC Anlegg AS nevnes
2020-10-05Cross Cut Skøyen, K2C (Oslo kommune v/Fornebubanen)
Fornebubanen [the Fornebu Line] is a new underground line between Majorstuen and Fornebu. The line will be approx. 8 km long and will in its entirety run through an underground tunnel. The line will be connected at Majorstuen Station and end in a new Fornebu Base and station. Six stations will be built along the stretch.
This contract, K2-C ‘Skøyen Cross Cut', deals with one of many cross cuts needed to drive the underground line tunnel. The cross cut at Skøyen will handle tunnel driving between Skøyen …
Vis anskaffelsen » Nevnte leverandører:NRC Anlegg AS
2019-03-19Container Wharf North [Containerkai Nord] (Borg Havn IKS)
Construction of a wharf in Janbukta that is located between the RoRo ramp/Kai 70 upstream and the Container Wharf downstream at Øra Industrial area in Fredrikstad. The development will add approx. 4 000 m extra terminal area and remove a logistical bottle-neck in the terminal area. The competition includes the construction of a pile-wharf, reinforcement of back area and construction of sheet-pile curtain toward the RoRo ramp, and the necessary wharf equipment.
Vis anskaffelsen » Nevnte leverandører:NRC Anlegg AS