2016-04-18Risk and vulnerability analysis of electronic communication systems (Jernbaneverket)
Jernbaneverket wants to carry out an risk and vulnerability analysis of its electronic communication system. The electronic communication system produces services used for railway specific purposes. The system consist of transport network/transmission services, GSM-R based access network, various signalling systems (older locally based systems, class B Thales system, class A ERTMS system), condition monitoring/predictive maintenance system, traffic control systems and system specific IT including …
Vis anskaffelsen » Nevnte leverandører:Safetec Nordic As
2016-02-19UAS Services (Jernbaneverket)
The services will consist of observation of landslides, avalanches and other natural events, both by preventive investigations and participation during actual accidents, along the infrastructure of the Norwegian Rail Administration (Jernbaneverket).
Furthermore, in addition to minor tasks (observation and documentation of the progress of projects), Jernbaneverket will also consider the development of surveillance along parts of the lines working ‘beyond line of sight’ (this project depends on approval …
Vis anskaffelsen » Nevnte leverandører:Iris Group Nordic ASNordic Unmanned ASTotal Trafikkhjelp AS
2015-06-26Framework agreement for Technical Consultants to the Norwegian ERTMS National Implementation project (Jernbaneverket)
The Norwegian ERTMS National Implementation project (hereafter called ERTMS NI) is planning to establish framework agreements for hiring technical consultants in order to secure necessary capacity and expertise within several fields of ERTMS. There is a need for resources with relevant experience from other ERTMS and significant signaling projects. These resources are scarce in Norway, and consequently the project is looking towards Europe.
The Contract Works include delivery of senior technical experts, …
Vis anskaffelsen »
2015-05-12Sun shading for the post office (Jernbaneverket)
The Norwegian National Rail Administration requests tenders on sun shading on the 21st floor at the Post office in Oslo. Option for delivery to further three (3) floors in the Post office in Oslo. All floors have identical design in relation to number of windows, sizes, etc.
Vis anskaffelsen » Nevnte leverandører:Notto Tekstil AS
2015-05-07Engineering Design — Djupvik passing loop (Jernbaneverket)
Norsk jernbaneplan (NJP) (The Norwegian Railway Plan] which is managed by the Norwegian Parliament gives limits for the further development of the railway network. Increasing the railway capacity on the Ofot line (Ofotbanen) is prioritised and, and as part of this the construction of an entirely new passing loop at Djupvik station, along the line from Narvik — Bjørnfjell (Border to Sweden) is assumed.
This project comprises engineering design with preparation of detail plan, construction plan and tender …
Vis anskaffelsen »
2015-04-28Hell-Værnes, T2 Technical control body (TSI) and assessor (Jernbaneverket)
1. Technical control body:
The interconnection regulations (regulations from 16 June 2010 no. 820 on the interconnection ability in the railway system) have requirements regarding the preparation of an EF-declaration on conformity and suitability for use and the EF-certificate for part systems on the national railway network. The requirements are set in the technical specifications for the interconnection ability (TSI).
Jernbaneverket would like tenders for EF-verification for requirements in TSI …
Vis anskaffelsen » Nevnte leverandører:VANAHEIM AB
2015-04-10Procurement of Terminal Operation System (TOS) (Jernbaneverket)
The Norwegian National Rail Administration has taken over operational responsibility for a number of the Railway goods terminals in Norway, and in this regard, we are in the process of procuring a terminal operation system (TOS). TOS is planned to be introduced and used on approximately 10-11 goods terminals in Norway, but with the possibility for expansion. We are planning the first implementations at two terminals in the first quarter of 2016. The Norwegian National Rail Administration wants to use TOS …
Vis anskaffelsen »
2015-03-26Construction Manager resources for various projects along Ofotbanen (Ofoten Railway Line) (Jernbaneverket)
The Project entity, Område Nord [Area North], needs to increase access to construction managers in order to to ensure the follow-up of construction activity in various projects along the Ofoten Railway Line. This primarily concerns the following projects:
1) Renewal project along the Ofoten Railway Line, as well as terminative works Bjørnfjell Passing Loop (approx. 50 % employment);
2) Preliminary works Djupvik Passing Loop (approx. 50 % employment);
3) Renovation, facade, local workshop/demolition, …
Vis anskaffelsen »
2015-03-09Map solution showing trains in traffic (Jernbaneverket)
Jernbaneverket intends to establish an internet based customer information service visualizing the train traffic in Norway on a map. The movement of the trains must be as close to realtime as possible, based on the timetable — and updated realtime information available from Jernbaneverkets SIRI service.
The Service shall be made available to the public as a web-service that is optimized for mobile devices (smartphones and tablets).
The solution shall provide Norwegian text to the users.
Vis anskaffelsen » Nevnte leverandører:Geodata
2015-03-02Framework agreement for the hire of technical consultants for the ERTMS national implementation project (Jernbaneverket)
The ERTMS national implementation project (ERTMS NI) would like to enter into parallel framework agreements for the hire of technical specialists.
The contract is for the use of technical specialists, in all phases and areas of the project. The framework agreements will be signed with several service providers, within their respective competence areas:
— ERTMS system integration;
— TMS;
— ERTMS Trackside signal system;
— ERTMS On board equipment;
— Signalling engineers within DesignBuildMaintain-projects.
Vis anskaffelsen »
2015-03-02Tender contest for working clothes/protective clothes. The framework agreement period is 2 years with option for 1... (Jernbaneverket)
The tender contest for working clothes/protective clothes to Jernbaneverket involves 2 stages. I.e. a negotiated tender contest where the suppliers first are to be qualified for participation in the tender contest. This is the qualification stage, and all qualified suppliers will receive the tender documents.
The objective of the tender contest is to establish a framework agreement for the delivery of working clothes/protective clothes to Jernbaneverket. See also the tender documents that will be …
Vis anskaffelsen » Nevnte leverandører:Albert E. Olsen As
2015-02-23Competition for office supplies (Jernbaneverket)
This competition is for office supplies for the Norwegian Rail Administration Authority. The framework agreement is for 2 (two) years with a unilater option for the contracting authority to extend the contract for 1 (one) year + 1 (one) year.
Vis anskaffelsen » Nevnte leverandører:Lyreco Norge AS
2015-02-05Application for external collaboration (Jernbaneverket)
The Norwegian National Rail Administration has a need, in many of its projects, for an application for external collaboration with its contract parties. Up until now the Norwegian National Rail Administration has used a project hotel. This framework agreement is about to expire and there is a need to enter into a contract that sees to such external collaboration in the future. The amount of projects is increasing, both in number and size. The procurement of an application for external collaboration is …
Vis anskaffelsen »
2015-02-05The hire of 1-2 construction managers, railway engineering, contact line (Jernbaneverket)
The contract includes the hire of 1-2 construction managers contact line (railway engineering) to the Jernbaneverket's project Farriseidet-Porsgrunn.
— The assignments are geographically situated in Larvik.
— The assignment is to be initiated ASAP. The contract period is 2 years with option for prolongation of 1+1 year.
— Place of work: On the section Larvik-Porsgrunn, in accordance with agreement.
— Estimated work load: 100 % per position.
— Main tasks/work tasks:
— Primary responsibility for following …
Vis anskaffelsen »
2015-02-04Hell — Værnes — R7 Hire of an engineering design manager and assistant construction manager for signal (Jernbaneverket)
The project wishes to hire an engineering design manager signal and assistant construction manager signal. It is requested that both functions can be carried out by the same person. However, this is not a requirement. The engineering design manager signal and the assistant construction manager signal is responsible for the general signal delivery, until and including the production stage. Some of the responsibilities and tasks are:
— Contribute to the signal deliveries in the project are delivered with …
Vis anskaffelsen »
2015-01-07Procurement of Mobility infrastructure (Jernbaneverket)
The procurement includes a complete system for Mobile Device Management (MDM), as well as forming the architectural foundation for Mobile Application Management (MAM) and Mobile Content Management (MCM)/Mobile Information Management (MIM).
Vis anskaffelsen »
2014-12-29Handheld GSM-R terminals including accessories (Jernbaneverket)
Jernbaneverket intends to establish a framework agreement for the delivery of GSM-R handheld terminals (OPH, and optional GPH) in order to cover the needs within Jernbaneverket for such terminals. We expect that there will be a need to replace a certain amount of terminals currently in use. The terminals must fulfil the requirements as set forth in the EIRENE specifications and by ETSI. Repair and return shall also be covered by the framework agreement.
Vis anskaffelsen » Nevnte leverandører:FUNKWERK AG
2014-12-18Purchase of surveying services and services from a mark-out engineer/surveyor to the project New double track Arna-Bergen (Jernbaneverket)
It is required surveying services/services from a mark-out engineer/surveyor in connection with the development of the new double track Arna-Bergen The projects paramount objective is to prepare for increased capacity for train conveying at the section Arna-Bergen and this includes upgrading of Arna Station and a new tunnel through Ulriken. The length of the tunnel is 7,8 km with transverse passages, technical rooms and crossing tracks. The main works will be executed at the facility in …
Vis anskaffelsen » Nevnte leverandører:974679442
2014-11-26UFP-12 Electric power (Jernbaneverket)
The project comprises building of 22.7 km of new railway track between Larvik and Porsgrunn. The terrain is very hilly, which leads to a large number of bridges and tunnels. Completion is planned for September 2018. A Contractor will now be acquired to build a complete electric supply system for the project with high and low voltage. Some own designing will be included in the delivery. The electric power contract is comprised of 21 technical rooms, with 24 kV switching stations, transformers for 22/0.69 …
Vis anskaffelsen » Nevnte leverandører:Caverion Norge AS
2014-10-17E03 Renewal transmission line Ofotbanen (Jernbaneverket)
The Norwegian National Rail Administration will carry out a project during the next 2 years that involves the construction and renovation of 2 power lines in the Narvik area. The project Renewal Transmission Line Ofotbanen (FFO) consists of one contract.
This contract is for the replacement of steel masts between Narvik and Bjørnfell 16 kV (16 2/3 Hz) approx. 35 km, as well as the construction of a new 22kV-line (50 Hz) between Rombak and Bjørnfjell (approx. 15 km). The line shall to in a joint mast …
Vis anskaffelsen » Nevnte leverandører:Eltel Networks As
2014-10-02Hand held GSM-R terminals with accessories (Jernbaneverket)
The Norwegian National Rail Administration would like to enter into a framework agreement for the procurement of hand held GSM-R terminals (OPH, GPH and OPS) in order to cover the Norwegian National Rail Administration's need for such terminals We expect that there will be a need to replace a reasonable amount of the terminals that are currently in use under the new contract. The terminals must be in accordance with the requirements for GSM-R terminals given in the EIRENE and specifications. The …
Vis anskaffelsen »
2014-09-30Procurement of product design and architect services (Jernbaneverket)
The framework agreement is mainly for product design and architect services for the Norwegian National Rail Administration's design programme.
The design programme comprises both visual profiling, sign programme for stations and buildings, static and dynamic customer information and the development of station elements such as furniture, shelters and information points.
Vis anskaffelsen » Nevnte leverandører:Grid Design As
2014-09-18UFP-11 — Bed and contact wire (Jernbaneverket)
Contractors shall be procured for the construction of the bed and contact wire installations for the development project Farriseidet-Porsgrunn. The contract is for 20.76 km double track and 1.75 km single track.
Crushed gravel, sleepers and rails shall be laid, as well as the establishment of the accompanying contact wire installations, including auto transformers.
Vis anskaffelsen » Nevnte leverandører:Infranord Norge As
2014-08-31Transport and forwarding services (Jernbaneverket)
Transport and forwarding services, including:
— All transport of general cargo within the Norwegian National Rail Administration's infrastructure.
— Special cargo.
— Packet cargo (0 – 40 kg).
— Part cargo.
— Fast freight domestic.
— Fast freight abroad.
— Freight to/from abroad, including customs clearance.
— Crossdocking (option)
— Project storage (option)
Vis anskaffelsen » Nevnte leverandører:Posten Norge As
2014-07-31Hell-Værns, E4/E5 Substructure and superstructure bridge (Jernbaneverket)
The delivery includes a substructure and superstructure for a new bridge.
Substructure new bridge includes foundations for a new double track railway bridge over Stjørdalselva. Other parts of the bridge will be constructed in another contract, E3, Sheet piling, piling and uncompacted matter works new bridge.
A total of 5 pillars and 2 land abutments shall be constructed. Both the pillars and land abutments are to be constructed from concrete constructions cast on site. There is approx. 260 m between the …
Vis anskaffelsen » Nevnte leverandører:Implenia As
2014-06-20Procurement of energy measurement units (energy meters) in trains (Jernbaneverket)
Infrastructure operators Banedanmark (Denmark), Trafikverket (Sweden) and Jernbaneverket (Norway) will request energy meters in trains. The request will include an option for a data collection system. The request will be sent out in August 2014. The energy meters will mainly be procured for replacement of old meters. It is important that the signals from the existing voltage transformers and relevant transducers can be used for the new energy meters.
The railway infrastructure managers Banedanmark …
Vis anskaffelsen »
2014-06-20960249 Hell-Værnes - Sub project manager bridge (Jernbaneverket)
Hire of a sub project manager bridge for the project "960249 Hell - Værnes speed increase and capacity".
The service shall be provided in the period October 2014 until 30.6.2017 with an option for a one year extension.
The assignment is geographically located in Stjørdal, but with a split office site between Marienborg and Hell.
The assignment share is 60 % on average. The service will be paid in accordance with the number of hours worked.
Vis anskaffelsen » Nevnte leverandører:HR Prosjekt AS
2014-06-18UFP-14 Emergency lighting (Jernbaneverket)
The Norwegian Railway Administration is constructing a new double track railway on the stretch Farriseidet - Porsgrunn. The stretch is 22.7 km and consists of approx. 2/3 tunnel. Emergency lighting shall be assembled in the tunnels in/on handrails as well as lit information signs with fittings. The emergency lighting and information signs shall be assembled in the main tunnel and escape tunnels. The contract is for the delivery of this material.
Vis anskaffelsen » Nevnte leverandører:Swarco Norge
2014-06-06Stores and logistics system (Jernbaneverket)
The Norwegian Rail Administration Authority invites suppliers to participate in a negotiated procedure for the procurement of stores and logistics system. This notice regulates the prequalification of suppliers for later receipt of the complete tender documents. The aim of the contract is to implement a new joint stores and logistics system across the organisation. The system shall suport new processes, reduce manual work and increase efficiency. The system must cover the predefined processes, in which …
Vis anskaffelsen »
2014-05-14Cleaning premises (Jernbaneverket)
The contract is for cleaning office premises is:
— Tønsberg;
— Larvik;
— Holmestrand.
The contract is for cleaning approx. 2500 - 3000 m².
A contract shall be signed for 2 + 1 + 1 years.
Vis anskaffelsen »
2014-05-09Prequalification – System for following up legal competence in projects and a notification channel for financial fraud (Jernbaneverket)
Several comprehensive fraud cases have been uncovered in recent years in the building and construction branch. the Development Division in the Norwegian Rail Administration Authority (US) has carried out an analysis to map the risk of fraud in development projects. The contract includes the establishment and administration of a system for reviewing the legal competence of all employees and hired staff in US. The contract also includes the establishment and administration of a notification channel for …
Vis anskaffelsen »
2014-05-01E01 – Preliminary works (Jernbaneverket)
Rombak station is the middle of 5 stations on the Ofot railway between Narvik and the Swedish border. The station is 20.8 km measured from the Fagernes terminal in Narvik and approx. 21.1 km from the Swedish border. Contract E01 is for parts of the ground work/substructure for an extension to Rombak passing loop on the stretch 20.460 km - 22.200 km. This includes an expansion of the rock cuttings along the western part of the station area including transport the mass. The contract includes using the mass …
Vis anskaffelsen »
2014-04-15Management, operation and maintenance of maximo (Jernbaneverket)
BaneData with Maximo is the Norwegian National Rail Administration's central infrastructure database and is currently used for all maintenance management and follow up.
In addition it is the Norwegian National Rail Administration's master data for all the infrastructure.
Bane Transport uses Maximo for the follow up and maintenance of all rolling stock in the Norwegian National Rail Administration.
The contract shall establish a support apparatus for user support and operational support for all modules at …
Vis anskaffelsen »
2014-04-02960249 - Hell-Værnes, E1 Preparatory sub-structure works (Jernbaneverket)
Preliminary work on the "Hell-Værnes, velocity-increase and capacity" project.
Establishment of construction roads and rigging areas. Relocate access roads. Laying out part of the future substructure for new railways. Relocate waste-water pump pipeline Ø250 mm above Stjørdals River.
Vis anskaffelsen »
2014-03-26Contract F-ATC block stretch Lillestrøm - Fetsund (Jernbaneverket)
Jernbaneverket Utbygging is carrying out measures in the period 2011–2014 to alter Eidsvoll and Lillestrøm stations in order to meet the alterations needed for the introduction of new trains, minor offer improvements and a new basic route model.
The alteration needs require the implementation of F-ATC on the block stretch.
— Lillestrøm – Fetsund, Norway:
From the approach to Lillestrøm station to between approach A and points 1 at Fetsund station.
The contract comprises of the development of F-ATC on the …
Vis anskaffelsen »
2014-03-24EPC Oslo S (Jernbaneverket)
The contract covers construction work for the new Follo Line and the Østfold Line between Oslo Central and Eker Bergsåsen, as well as works up to the tunnel entrance at Ekebergåsen. The work extends over a distance of 1,7 km. The work includes both the sub-structure and signal systems. The turnkey contract for Oslo Central also includes the completion of the sub-structure building and signalling installation for the incoming Østfold line between the tunnel entrance at Eker Bergsåsen and Sydhavna, over a …
Vis anskaffelsen »