2022-11-23   SPOT 01: SPOT [Train for replacing railway superstructure] and train that refreshes the ballast - the Main line and... (Bane NOR SF)
SPOT [Train for replacing railway superstructure] and train that refreshes the ballast for the Main line and the Gjøvik line 2023 Vis anskaffelsen »
2022-11-01   SPOT 01: SPOT [Train for replacing railway superstructure] and train that refreshes the ballast - the Main line and... (Bane NOR Eiendom AS)
SPOT [Train for replacing railway superstructure] and train that refreshes the ballast for the Main line and the Gjøvik line 2023 Vis anskaffelsen »
2020-04-02   New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo metro and Oslo tramway, as well as owning several operating subsidiaries. Sporveien will through the project — New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo metro network, including depots, the new line from Majorstuen to Fornebu ('Fornebubanen') and equipping and modifying the rolling stock. The main objective … Vis anskaffelsen »
Nevnte leverandører: Siemens Mobility AS Siemens Mobility GmbH
2019-11-26   New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo Metro and Oslo Tramway, as well as owning several operating subsidiaries. Sporveien will through the project New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo Metro network, including depots, the new line from Majorstuen to Fornebu (‘Fornebubanen’) and equipping and modifying the rolling stock. The main objective … Vis anskaffelsen »
2019-09-11   Signal/Tele, Operational and Maintenance Services (Bybanen AS)
The contract will cover fault corrections as well as ongoing change and maintenance work on the infrastructure that Bybanen AS is responsible for, on infrastructure for the light rail and trolley buses, within signal, tele, IT, and electro disciplines. Vis anskaffelsen »
2018-10-31   Turnkey Contract, Kvam Passing Loop (Bane NOR SF)
Turnkey contract, Kvam passing loop. The contract includes the engineering design and the construction for: — an extension of the current passing loop, — the completion the remaining substructure works from a previous contract, — a new contact wire installation, — conduits, — upgraded low voltage system with a new network station, — ground frost works, — the reconstruction of a level crossing, — the upgrading of the current NSI-63 contact wire installation with adaptations for all interchanges for the … Vis anskaffelsen »
Nevnte leverandører: BaneService AS
2017-12-28   Framework agreement for technical consultancy services, modifications and repairs (Norske TOG AS)
The objective of the procurement is to combine Norske Tog’s purchase of technical consultancy services and modifications and repair assignments in several disciplines. The framework agreements shall ensure Norske Tog quick access to capacity and specialised competence in technical consultancy and performance of modifications and repairs of the entire train stock. The agreements shall facilitate long-term and develop collaboration between Norske Tog and the service providers. Vis anskaffelsen »
2017-12-04   Procurement of ISA, AsBo and NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project “ERTMS National Imolementation“ with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with one supplier on the following; — Independent safety assessor (ISA), — Assessment body CSM-RA (AsBo), — Notified body TSI CCS (NoBo). The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver. Vis anskaffelsen »
Nevnte leverandører: Certifer Sintef
2017-03-20   ISA, AsBo og NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project 'ERTMS National Imolementation' with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with 1 suppler on the following: — Independent safety assessor (ISA); — Assessment body CSM-RA (AsBo); — Notified body TSI CCS (NoBo). The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver. Vis anskaffelsen »
2016-09-27   Parallel framework agreement for security guards — the Follo Railway (Jernbaneverket [The Norwegian National Rail Administration])
The delivery includes: — Main security guards; — Local security guards; — Manager for electricity safety and 2 persons for disconnection. Vis anskaffelsen »
Nevnte leverandører: BaneService AS JPL Rail AS
2016-03-14   EPC Railway Systems Oslo S (Jernbaneverket [The Norwegian National Rail Administration])
The work includes the completion of engineering design services, mainly work drawings and the execution of railway engineering work for the Østfold railway and the Follo railway from the two altered tunnels at Oslo S, through a new tunnel in Klypen towards the portal in Ekebergåsen. The track for the incoming Østfold railway continues through the tunnel constructed by EPC D&B until the South Portal at the Bekkelag tunnels. The outgoing Østfold railway track comes from the tunnel in Klypen and will be … Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2016-02-09   Hell-Værnes, E11 — Alteration of the existing NSI-63 relay system (Jernbaneverket [The Norwegian National Rail Administration])
In connection with the project Hell-Værnes High Speed Increase and Capacity, and as as result of a new bridge over the Stjørdal river, alterations shall be made to the existing signal installations at Hell station. Hell station has a relay system of type NSI-63. The signal work includes: 1. The establishment (and removal) of temporary signal installations in 3 directions at Hell station; 2. The demolition of the existing external signal installations on the station's B side; 3. The construction of new … Vis anskaffelsen »
Nevnte leverandører: Veidekke Entreprenør As
2014-03-22   UHN 18 Railway engineering works - Interdisciplinary works (Jernbaneverket)
In connection with the development of a new double track Holm-Nykirke, a major job that covers almost all professions shall be carried out in addition to the major contracts for each profession. Contract UHN18 Interdisciplinary works Holm-Nykirke consists of track, contact line, low voltage, tele, signal and accompanying works. The works will be carried out in the interface between the existing and new installations in the open air zones and works with earthing in the tunnel. In addition contract UHN18 … Vis anskaffelsen »
2013-12-19   Two railway contracts: E06 Railway engineering and E07 Construction of snow protective building (Jernbaneverket (the Norwegian government's agency for railway services))
Ofotbanen is a 43-kilometer stretch of track from Narvik Harbor to the Swedish border at Bjørnfjell. The railway track is linked to the Swedish national railway network. Ofotbanen has passenger traffic, ordinary freight trains and above all heavy traffic of heavy and long ore trains . A strong growing demand has made it it necessary to increase the capacity on the railway. Bjørnfjell station is the easternmost of the five stations on Ofotbanen between Narvik and the Swedish border. The station is located … Vis anskaffelsen »
2012-10-19   Security personnel, Ski station and more (Jernbaneverket)
The Norwegian National Rail Administrations Development Division (U) issues an invitation for the procurement of security personnel mainly for the depositing tracks located in and around Ski station. In addition the contract will include parts of the route located on the Follo Line; Ski Station and the Langhus – Ski stretch. However, during the contract period a separate invitation request for the procurement of security personnel for the Follo Line will be issued. In connection with the work that is … Vis anskaffelsen »
2012-04-04   Pre-project - future underground signal and signalling plant (Kollektivtransportproduksjon AS)
KTP’s, henceforth referred to as the Awarding Authority; underground network comprises of approx. 155 km double tracks of varying age and condition. The signal and signalling plant is a combination of old and new, of which major parts of the plant has reached its operational period. The Awarding Authority has therefore initiated works for how the future signal and signalling plant should be. It has previously been implemented two studies where potential alternatives to the existing systems are described … Vis anskaffelsen »
2012-03-16   Hire of track and signal installers (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS has a need to hire signal and track installers. The signal installers will be used in the signal and tele/automation department. The track installers will be used in the track department (underground and tram). Tenders can be given for lots. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=251452. Vis anskaffelsen »
2011-10-13   Adaptation of the signalling system for altered track geometry at Trondheim Central station (Jernbaneverket)
The contract is a part of project 960135 Northern relief road measures at Brattøra. In connection with construction of Northern relief road across Brattøra in Trondheim, the track geometry for several train/ freight train tracks have been altered. This contract includes adaptation of NSI-63 railway signalling plant at Trondheim Central Station to the new track geometry. The contract also includes internal and external couplings in the signalling plant for adaptation to marshalling yard control office and … Vis anskaffelsen »
Nevnte leverandører: BaneService AS
2011-02-07   Contract railway engineering; ski station - depositing track (Jernbaneverket)
Start of works is approx. 15.9.2011. All works are expected to be concluded within 2.2.2013, these include clearance works and transportation of equipment. The main objective of Contract JBT-91 and JBT-92 is to establish a depositing track for train operators at Ski Station. The works include railway engineering works for the project "establishment of depositing track" and includes works from stage 00.40 to the main stage 20. Contract JBT-91superstructure, contact line, electric power, and … Vis anskaffelsen »