2022-04-07Contract E5, Guided rock drilling (IVAR IKS)
IVAR IKS shall establish a new water main from Langevatn water treatment plant in Gjesdal to Tjensvoll control basin in Stavanger. This will secure the water supply in the area, and cover the need for anticipated future population growth.
The pipeline has a total length of approx. 34 km, and will traverse the municipalities of Gjesdal, Time, Klepp, Sandnes, Sola and Stavanger.
This tender documentation applies to contract E5, large-hole drilling through Bærheimsfjellet, Kjerrberget and from the tunnel to …
Vis anskaffelsen »
2020-10-05Cross Cut Skøyen, K2C (Oslo kommune v/Fornebubanen)
Fornebubanen [the Fornebu Line] is a new underground line between Majorstuen and Fornebu. The line will be approx. 8 km long and will in its entirety run through an underground tunnel. The line will be connected at Majorstuen Station and end in a new Fornebu Base and station. Six stations will be built along the stretch.
This contract, K2-C ‘Skøyen Cross Cut', deals with one of many cross cuts needed to drive the underground line tunnel. The cross cut at Skøyen will handle tunnel driving between Skøyen …
Vis anskaffelsen » Nevnte leverandører:NRC Anlegg AS
2020-06-05Upgrade of County road 848 Ibestad Tunnel (Troms og Finnmark Fylkeskommune)
Troms og Finnmark County would like tenders from contractors with the professional, technical and financial basis required to fulfil the contract.
The contract is for the renovation of Ibestad tunnel in accordance with the Tunnel Safety Regulations for county roads.
See the attached tender documentation and specifications for further information.
Vis anskaffelsen » Nevnte leverandører:BMO Tunnelsikring AS
2020-05-25Tunnel and Foundation Works Lysaker - Fornebu - K2A (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new underground stretch in a connected tunnel system from Majorstuen in Oslo to Fornebu in Bærum. The railway will be approx. 8 km long with six stations; Fornebu, Flytårnet, Fornebuporten, Lysaker, Vækerø and Skøyen.
The contract works period is approx. 2.5 year The contract includes tunnel and foundation works from Lysaker to Fornebu and stretch from the contract border west of Lysaker station to the tunnel portal at Fornebu station.
Tunnel works shall be executed - …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2018-11-06County Road 6312 Berfjorden — Avalance/Landslide Measures (Statens vegvesen)
A new county road, 6312 along Berfjorden in Roan Municipality in Trøndelag County is to be constructed. New county road 6312 is an avalanche/landslide measure that comprises the construction of 2 tunnels, Måvik tunnel and Berfjord tunnel, of 920 m and 670 m respectively, in addition to road in the open air for approx. 1,1 km.
Vis anskaffelsen » Nevnte leverandører:Implenia As
2018-06-08SMS 2A Turnkey contract, substructure (Bane NOR SF)
The project New Double Track Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and one of the lots in the link to Halden (the Østfold railway's western line). A new double track shall be constructed on the stretch, which partly lies in tunnels and partly in the open air, as well as a new railway station at Moss. The new station will be in the open air, approx. 200 m south of the current station. 4 tracks are planned, as well as a branch to the harbour track for Moss harbour.
The …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2018-02-05Turnkey contract substructure SMS 2A (Bane NOR SF)
The project new double Track Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and one of the lots in the link to Halden (the Østfold railway's western line). A new double track shall be constructed on the stretch, which partly lies in tunnels and partly in the open air, as well as a new railway station at Moss. The new station shall be built in the open air, approx. 200 m south of the current station. 4 tracks are planned, as well as a branch to the harbour track for Moss harbour.
The …
Vis anskaffelsen »
2018-01-23County road 659 Nordøyvegen, K5 Skjeltene-Harøya (Statens vegvesen)
County road 659 Nordøyvegen, is a mainland connection that shall connect the Nordøy islands in Sunnmøre to the mainland, via undersea tunnels and bridges. Nordøyvegen will give a ferry free road connection to Lepsøya, Haramsøya, Skuløya/Flemsøya and Fjørtofta in Haram municipality and Harøya in Sandøy municipality in Møre og Romsdal.
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2017-10-06Turnkey contract for Åsland Shooting range (Oslo kommune v/ Kultur- og idrettsbygg Oslo KF)
The shooting range, situated in a rock hall at Åsland, includes a shooting gallery with 50, 100 and 200 m shooting range distances. The Shooting range shall contain 38 stands divided between 4 floors. Accommodations for users of the shooting range shall also be constructed near the shooting range. The framework agreement consists of 4 lots:
— Tunnel and cutting,
— Portal and stands,
— Accommodations for users of the shooting range,
— Outdoor works.
Vis anskaffelsen »
2017-06-20County road 714 Stokkhaugen — Sundan: The Åstfjord junction (Statens vegvesen Region midt)
The Norwegian Public Roads Administration, Mid Region invites tenderers, on behalf of Sør-Trøndelag County, to a competition for the procurement of county road 714 Stokkhaugen — Sundan: the Åstfjord junction The contract includes the construction of Slørdal tunnel (T9.5), Approx. 2 650 m long, Åstfjord bridge approx. 735 m long and Mjønes tunnel (T9.5) approx. 770 m long, as well as roads in open air zones, approx. 1 500 m.
The project consists of:
— Slørdal tunnel, including electro approx. 2650 m long …
Vis anskaffelsen » Nevnte leverandører:Bertelsen & Garpestad ASMetrostav, a.s.
2017-06-15Fv 714 Stokkhaugen — Sundan: New road round Krokstadøra (Statens vegvesen Region midt)
The Norwegian Public Roads Administration, Mid Region invites tenderers, on behalf of Sør-Trøndelag County, to a competition for the procurement of county road 714 Stokkhaugen — Sundan: New road round Krokstadøra. The contract is for the construction of 3.7 km new county road and the accompanying local roads between Snilldalsli and Berg in Snillfjord municipality. The stretch will include a tunnel, Åli tunnel, of approx. 120 m, including portals and a bridge over Bergselva, approx. 148 m.
Vis anskaffelsen » Nevnte leverandører:Bertelsen & Garpestad AS
2017-05-03E6 Soknedal, lot Vindåsliene-Korporalsbrua. Road, tunnel and bridge works (Statens vegvesen Region midt)
The Norwegian Public Roads Administration Mid Region invites tenderers to tender contest for the project E6 Soknedal, lot Vindåsliene-Korporalsbrua. The contract includes the construction of a 3.6 km long tunnel, including completion and electrical installation works. The contract also includes the construction of a new E6 in open air, with a length of 2.9 km, including a two level interchange south of Soknedal centre, as well as construction of bridges and retaining walls.
Vis anskaffelsen »
2017-03-29Storanipa HRA — Entreprise F2 (FjellVAR AS)
Tunneling and rock engineering works. Cautious blasting of a tunnel and a vault, including uploading and transportation of the masses. To establish a treatment plant in Fjell municipality — Storanipa.
Vis anskaffelsen »
2016-12-20HRA Storanipa — Contract F2 (Fjell VAR as)
This qualification documentation concerns work with blasting, loading up and transport of rock fragments from treatment halls and tunnels in connection with the establishment of rock halls for HRA Storanipa.
Vis anskaffelsen »
2016-04-12Renovation of national road Høgenhei tunnel (Statens vegvesen Region sør (The Norwegian Public Roads Administration Southern Region))
National Road 354 Høgenhei tunnel is in Bamble municipality between Brevik bridge and
Grenland bridge. The tunnel shall be renvoated, as well as upgraded in accordance with the Tunnel Safety Regulations.
The work in the tunnel consists of laying completely new surface water installations with manholes. Construction of a new road construction in the tunnel, completely new systematic rock protection in the form of bolts and shotcrete. Assembly of VG protection for knol in parts of the tunnel. Demolition of …
Vis anskaffelsen »
2016-03-04NRA Rock Contract OREA (Nedre Romerike Avløpsselskap IKS (NRA) [Nedre Romerike Sewage Company])
Nedre Romerike Sewage Company (henceforth referred to as NRA) cleanses sewage water for three municipalities with a total connection of approx. 130 000 pe. The entire region is growing rapidly and the dimensioning basis for the facility is based on NRA have almost double the amount of connections in 2040. NRA shall, in order to reduce emissions of sewage water, construct a chemical cleansing stage, including a preliminary treatment process of the water that runs in spillway in front of the existing …
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2014-02-12Rv13 Ryfast E05 the Hundvåg tunnel (Hundvågtunnelen) (Statens vegvesen Region vest)
Ryfast is the link between Nord Jæren and Ryfylke. It consists of the Ryfylke tunnel from Strand to Hundvåg and the Hundvåg tunnel (Hundvågtunnelen) from Hundvåg to Stavanger as relief for the current town bridge. In the same project the Eiganes tunnel is being built which is a tunnel for E39 under the town Schancheholen to Tasta.
Entreprise E05 Hundvåg tunnel is a 5.7 km long two lane tunnel which is partially under sea and partially under land. The Hundvåg tunnel is operation from the ramps at Buøy and …
Vis anskaffelsen » Nevnte leverandører:Kruse SmithAS og Risa AS
2013-12-13181/2013 Rock plant contract, expansion of Bekkelaget treatment plant(UBRA)-Prequalification (Oslo Kommune, Vann- og avløpsetaten)
The project UBRA includes expansion of the existing rock plant situated at Bekkelaget. The existing plant is located in Ekebergåsen, just east of E18/Mosseveien. Subsequent to expansion, the plant will be approx. twice as big as the existing plant, both physically and capacity-wise.
The Rock contract includes blasting, protection works and mass haulage to disposal site. Total area is approx. 465 000 m3 rock (compact volume).
The new plant shall be constructed north and south of the existing plant. The …
Vis anskaffelsen »
2013-10-18Emergency network phase 3 Region west - Sogn og Fjordane (Statens vegvesen Region vest)
The project is for the delivery of and work with technical infrastructure in road tunnels, before new equipment for the new digital emergency communication system shall be installed. The project includes 20 tunnels in Sogn og Fjordane, divided up between Europe, national and county roads.
Main extent of the work:
Temporary moving and then removal of radio cables in tunnels.
Delivery and assembly of new radio, fibre and heavy current cables in tunnels.
Blasting and securing a rock hall for a new technical …
Vis anskaffelsen »
2013-07-10Expansion central treatment plant North Jæren-B1 building and construction engineering works (IVAR IKS (Forsyning))
The central treatment plant at North Jæren shall be expanded and rebuilt with activated sludge for compliance with the secondary treatment requirements. As a part of these works it shall be established a new access to existing underground facilities and the existing underground facilities shall be rebuilt, renovated and expanded with new caverns and new features.
This contract, B1, includes:
— Demolition of the existing parts of the existing treatment plant, including removal of the machine system and …
Vis anskaffelsen »
2013-07-02510642-Expansion of Central Treatment Plant at Nord Jæren - B1 - Construction and engineering works (IVAR IKS)
The central treatment plant at Nord - Jæren shall be expanded and rebuilt with active sludge for compliance with the secondary treatment requirements. As part of this work it shall be established new access to the existing underground facilities and existing underground facilities shall be rebuilt, renovated and expanded with new caverns and new features.
This contract, B1, consists of the following:
- Demolition of the existing parts of the existing treatment plant, including the removal of machinery …
Vis anskaffelsen »
2013-06-26Fv 50 The Geiterygg tunnel. Renovation. Rock works (Statens vegvesen Region sør)
The Geiterygg tunnel at Fv50 in Hol municipality is subject to renovation and upgrading. This contract includes execution of rock works in relation to this. The length of the tunnel is 3, 3 km and especially “power plant cross-section” with 7 m from wall to wall.
Subsequent to expansion/back ripping executed in 1985/86, the tunnel has some larger cross section in each end, but in this zone only works in relation to drain/surface water and guideways for electrical installations/electronic communication …
Vis anskaffelsen » Nevnte leverandører:Kruse Smith Entreprenør As
2013-06-1847/2013 Main water pipeline Skullerud - Enebakkveien (Oslo Kommune, Vann- og avløpsetaten)
The Water and Sewage Department shall construct a new main water pipeline from Skullerud to Enebakkveien in order to ensure that the water supply in the Søndre Nordstrand district fulfils the safety and resilience requirements that are stipulated in the drinking water regulations. In addition the new main water pipeline will allow for the development of the Gjersrud - Stensrud and it will give increased transfer capacity to Ski municipality.
The conveyence of a Ø1000 water pipeline has been engineered …
Vis anskaffelsen »
2013-05-16201302255 - Follobanen - D&B Tunnel – Contract nr. 2 (Jernbaneverket)
The Contract comprises all conventional tunnels driving scope (Drill & Blast) in the Follo Line Project, i.e. the Inbound Østfold Line (IØB), inner part of the twin Follo Line tunnels, a number of crossings with existing tunnels and roads and the 3-Track tunnel at the interface with the EPC contract for modification work at the Oslo S Station and the TBM contract (Tunnel boring machine)
For more information - See the prequalification documents.
NOTE: To register your interest in this notice and obtain …
Vis anskaffelsen »
2013-04-10The City Railroad in Bergen - Contract C14 Flesland (Hordaland fylkeskommune)
The contract involves tunnel works in connection with procurements of contract C14. Construction and equipping the 540 m long Flesland tunnel. Retaining walls at the tunnels eastern portal, 2 portals, technical control room, anchor bolts for technical installations as well as water and frost proofing the entire tunnel.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=290452
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2013-03-20SKI 01 Preliminary work Langhus - Ski (Jernbaneverket)
Prior to the main work at Ski various preparatory work shall be executed, including, amongst other things, work on the stretch Langhus - Ski. This mainly includes the relaying of Fv 152 Langhusveien with the establishment of a T-junction, and ground reinforcements.
In addition, Roåsbekken shall be relaid through a mountain tunnel including entrance and exit structures. There is an option for casting abutments and the establishment of temporary Baileybru over the existing Østfoldbanen by Roås gård.
For …
Vis anskaffelsen »
2013-03-15201300926 - Preparatory works Åsland (Jernbaneverket)
The site works consist of conventional driving (D&B) of two cross cut tunnels, each approx. 1km from Åsland towards the Follo railway's main tunnels. The tunnels are planned with a cross section of approx. 75-80 m². The work includes the removal of filling matter in front of and around the portaling area by the previous Åsland stone crushing plant's area, as well as the establishment of a foot/cycle path from Maurtuveien over the access area in order to separate cyclists and pedestrians from the site traffic.
Vis anskaffelsen »
2011-07-04Fv. 714 Mjønes-Vaslag, the Brattstiås-, Fenes- and Valslag tunnels (Statens vegvesen Region midt)
Construction of 3 tunnels with a total length of 3 870 m, as well as connection to the existing road outside the 3 tunnels. Road construction works with a total length of 2 km in combination with new and improvement of old road.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=233468.
Vis anskaffelsen »
2011-05-19Rv 7 Sokna - Ørgenvika - contract 1 (Statens vegvesen Region sør)
New Rv 7 (National road 7) between Sokna and Ørgenvika includes construction of a new road section with a length of 16, 6 km. This means shortening of the existing road section for Rv 7 with 20 km between Sokna and Ørgenvika. The road section is partly following the existing section for the Bergen Railway and will mainly go through virginal forest terrain.
The works shall begin west of the centre of Sokna (road profile 1 000) and stretch out to the existing Rv 7 in Ørgenvika. The section is approx. 15 km …
Vis anskaffelsen » Nevnte leverandører:Hæhre Entreprenør As
2011-04-18Årabrot WWTP - B1 - construction-, VA- and landscape work (Haugesund kommune)
Construction and blasting works, VA-works and landscape works in connection with establishing new wastewater treatment plant.
Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=228674.
Vis anskaffelsen »
2011-04-05New public Halden Harbour - Sauøya case no. 2011/1999 (Halden kommune)
Extension of new public Halden harbour from the present position at Mølen to Sauøya. The project shall be undertaken as a complete enterprise, and the main features consist of new harbour road, railway bridge and railway track in mountain tunnel up to the South side of the island.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=227701.
Vis anskaffelsen »