2026-03-06   E39 Fløyfjell tunnel, upgrading of emergency stations and CRM installations (Statens vegvesen)
The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upgrading project must be carried out without significantly touching the existing installations. The E39 … Vis anskaffelsen »
2026-02-09   National road 13 Røynevarden 2026 (Statens vegvesen)
The work in this contract is to expand the tunnel profile, including the water and frost protection zone (cladding), shall at least fulfil the geometric requirements for normal profile T8.5. In areas where water and frost protection is not established in this contract, the tunnel profile shall be designed so that any later establishment of water and frost protection can be carried out without reducing the tunnel profile under the geometric requirements of T8.5. The contract also includes: • Assembly of … Vis anskaffelsen »
2025-11-25   E39 Fløyfjell tunnel, upgrading emergency stations and CRM installations (Statens vegvesen)
The Norwegian Public Roads Administration currently has challenges with keeping the existing technical installations in the Fløyfjell tunnel in operation. The automation plant lacks access to critical spare parts and emergency stations connected to the tunnel has exceeded its lifetime. The existing installations are old and compound, this involves a high risk of errors and system failures. The upgrading project must be carried out without significantly touching the existing installations. The E39 … Vis anskaffelsen »
2025-04-11   County road 17 Storvikskar tunnel - upgrading of tunnel TSFF (Nordland Fylkeskommune)
Nordland county invites tenderers to a competition for county road 17 Storvikskar tunnel – upgrading of tunnelSFF. Vis anskaffelsen »
2025-04-10   County road 42 Gåseheller tunnel - Turnkey contract (Agder fylkeskommune)
County road 42 along the east side of Sirdalsvatn between Haughom and Tonstad is narrow, exposed to landslides and the Gåseheller tunnel from 1989 does not meet the requirements of the EU tunnel safety directive. The topography in this area is steep mountains on one side of the county road and Sirdalsvatnet on the other side. The road width is somewhere under 5 metres, there is little or no ditch, poor visibility, and parts of the road are located on stone walls built in the 40s. The road is the main … Vis anskaffelsen »
2024-09-09   2024-084 Fv653 Selvåg tunnel - Technical upgrade (Møre og Romsdal fylkeskommune)
1. The objective of the assignment and scope of theSelvåg tunnel (1069m) with open air zones shall be improved in accordance with TSFF (the Tunnel Safety Regulations), as well as the necessary upgrades in accordance with the current road norwegian templates. See the published tender documentation for further information. Vis anskaffelsen »
2024-04-08   RV 5 Fodnes tunnel (Statens vegvesen)
Parts of the existing water and frost protection, the aluminium plate vault shall be demolished and replaced with new water/frost protection. 2 new wreckage works shall be blasted with technical buildings. The tunnel shall also have new lights mounted on the cablial ladder. • Demolition of approx. 27,000 m2 metal plate vault • New installation of approx. 30,000 m2 water and frost protection • Purge and secure the rock behind the plate vault • Blasting 2 wreckage units with a technical building. • … Vis anskaffelsen »
2024-03-18   County road 17 Storvikskarstunnelen TSFF (Nordland Fylkeskommune)
Nordland county invites tenderers to a competition for county road 17 Storvikskarstunnelen TSFF. Vis anskaffelsen »
2023-06-12   Framework agreement for road and tunnel maintenance in Sogn og Fjordane and parts of Hordaland (Statens vegvesen)
The Norwegian Public Roads Administration [Statens vegvesen] Maintenance West1 will enter into framework agreements with 3 tenderers. The framework agreement generally covers maintenance work on national roads in Sogn og Fjordane and parts of Hordaland. Gudvangen E16 to the E16/Rv13 junction in Vinje. Vangsnes Rv13 to the E16/Rv13 junction in Vinje. Oppedal ferry quay E39 to Knarvik in Nordhordaland. Vis anskaffelsen »
Nevnte leverandører: Aurstad Tunnel AS BMO Tunnelsikring AS Mesta As
2023-06-02   County road 566 Tirås Tunnel, upgrading (Vestland fylkeskommune)
Tirås Tunnel is on county road 566 between Kvisti and Mjeldal in Osterøy municipality outside Bergen. The tunnel will be upgraded in accordance with the tender documentation, the Tunnel Safety Regulations (TSFF) and Vestland County's [VLFK's] approved action plan. The tenderer will be responsible for all engineering design and all deliveries, applications and execution of the road network until the installations are fully upgraded and built, secured, safety-approved and documented with the services described. Vis anskaffelsen »
2023-05-10   Framework agreement for rock protection in tunnels (Statens vegvesen)
Framework agreement for rock protection in tunnels in the Rogaland area and in parts of Vestland County. The contract will mainly be based on the execution of shortcomings and errors after geological main inspections, which will be available before each measure. Most of the work will be protection with bolts and concrete in tunnels, there will also be the removal of netting/sheet arching/PE foam and scanning as required. There can be minor amounts of blasting/pigging. The contract will be for one year, … Vis anskaffelsen »
Nevnte leverandører: Mesta As
2022-11-09   New Government Quarter - working with Ring 1 (Statens vegvesen)
The Norwegian Public Roads Administration, Development Division, hereby invites tenderers to a competition regarding the contract for the project "New Government Quarter - Working with Ring 1". The purpose of the competition is to meet the contracting authority's needs for reconstruction of the Hammersborg Tunnel and upgrading of the Vaterlands Tunnel on County Road 162 (Ring 1) i Oslo in accordance with the contract requirements. Vis anskaffelsen »
Nevnte leverandører: Veidekke Entreprenør As
2022-10-27   2022-16756 County Road 659 the Reme Tunnels - technical upgrade (Møre og Romsdal fylkeskommune)
1. About the assignment - purpose and scope of the procurement Reme Tunnel (570m) and Remefjell Tunnel (614m) are to be improved in accordance with TSFF (the tunnel safety regulations), as well as necessary upgrades in accordance with the current road norms. 2. Site inspection A site inspection will be held on 16.11.22 at xx, meet at xxx. Participation is to be registered with Erlend Opstad, erlend.opstad@mrfylke.no. Vis anskaffelsen »
2022-07-09   County road 283 Bragernes Tunnel (Viken fylkeskommune)
Bragernes Tunnel on county road 283 is 3200 metres long and has three -3 - entrances and exits. Two to the west of the roundabout 'Egget' (Hamborgstrøm culvert and Lajordgata), and one to the east at Brakerøya. The electrical installations in the tunnel will more or less be completely renovated. The tunnel has an ADT count of approx. 16,000 eastwards (Brakerøya) and approx. 20,000 westwards (roundabout at the Hamborgstrøm culvert). Vis anskaffelsen »
2020-06-05   Upgrade of County road 848 Ibestad Tunnel (Troms og Finnmark Fylkeskommune)
Troms og Finnmark County would like tenders from contractors with the professional, technical and financial basis required to fulfil the contract. The contract is for the renovation of Ibestad tunnel in accordance with the Tunnel Safety Regulations for county roads. See the attached tender documentation and specifications for further information. Vis anskaffelsen »
Nevnte leverandører: BMO Tunnelsikring AS
2020-05-08   2020-54 County Road 63 Korsmyra — Indreeide (Møre og Romsdal fylkeskommune)
Project county road 63 Korsmyra-Indreeide will protect the road from avalanches between Korsmyra in Stranda Municipality And Indreeide in Fjord Municipality. Approx. 5.3 km of new road will be constructed, of which approx. 4.9 km are in a Tunnel. The project's location is partly in the Geiranger-Herdalen landscape preservation area and in the Unseco world heritage area (Vestnorsk fjordlandskap — Geirangerfjorden and Nærøyfjorden). The entire stretch is also included in the list of National tourist tracks … Vis anskaffelsen »
2020-03-05   County Road 17 Helgeland/Liafjell South (Nordland Fylkeskommune)
Nordland County invites tenderers to a contest for county road 17 Helgeland/Liafjell South. Nordland County would like tenders from contractors with the professional, technical and financial basis that is required for fulfilment of the contract. Furthermore, experience is required from equivalent work for the execution of the above-mentioned contract work in accordance with the tender documentation. See detailed regulations in the tender documentation, chapter B2. A tender conference will be held on 25 … Vis anskaffelsen »
Nevnte leverandører: Bertelsen and Garpestad AS
2019-12-23   National road 555 The Sotra Connection OPS (Statens vegvesen)
The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the 3 best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract … Vis anskaffelsen »
Nevnte leverandører: Sotra Link AS
2019-11-13   Tunnel Maintenance Works, County Roads in Troms and Finnmark (Statens vegvesen)
The contractual works include maintenance of the county roads tunnels in Troms and Finnmark. An overview of the tunnels is given in Chapter D2. The works mainly include water and frost protection measure, fire protection measures, the establishment of PE foam, rock protection in the form of clearing and shotcreting as well as mounting of bolts. Other necessary consequential works are also included. The contracting authority requests unit prices and hourly rates as a basis for commissioning works, mainly … Vis anskaffelsen »
2019-11-04   County Road 500 Folgefonn Tunnel – Årsnes, tunnel and road improvement (Vestland fylkeskommune)
Fv [County Road] 500 the Folefonn Tunnel — Årsnes, in Kvinnherad municipality there is a 22 km stretch where approximately an avalanche protection tunnel of approximately 1 500 meters will be built at Kroka. In addition, selected parcels of the stretch will be improved and the road width will be increased. This is to increase accessibility and traffic safety along the stretch. Vis anskaffelsen »
2019-05-28   Tunnel Rehabilitation Oslo — E6 Vålerengtunnelen [the Vålereng Tunnel] (Statens vegvesen)
The works include rehabilitation and reinforcement of the Vålereng tunnel on the E6 in Oslo. The tunnel was opened for traffic in 1987 and 1989. The tunnel was partially rehabilitated in 2001-2003. ADT (Average annual daily traffic): 56 000, The tunnel is an approx. 820 m long (twin tunnel), without on or off ramps. Varies from 2 — 3 lanes. Southbound there is an unused and closed ramp lane. The tunnel is primarily a rock tunnel, with a concrete part to the north and some at the southern end. There is a … Vis anskaffelsen »
2019-03-18   Tunnel Upgrading, fv (County Road) 862, Skaland Tunnel (Statens vegvesen)
The installation of safety and monitoring systems with a direct connection to the road traffic central in Mosjøen. The contract shall include works for 15 000 m water and frost protection measures and blasting/back ripping works for approx. 4 000 fm. A technical building in the tunnel must be established. The length of the Skaland tunnel is 1 900 metres. Electro: — delivery and installation of distribution boards, — delivery and installation of lighting and safety equipment, — delivery and installation … Vis anskaffelsen »
2019-01-02   Tunnel Renovation Oslo, E18 — Renovation of Festning Tunnel (Statens vegvesen)
The work consists of the renovation of Festning Tunnel on the E18 in Oslo, in the western part of the Opera Tunnel and the pump station at Bygdøylokket. The work in the tunnel mainly consists of the establishment of escape lighting, fire protection of concrete tunnels, a new PE arch in the Danish tunnel, traffic safety measures in breakdown lay-bys, measures to prevent drips and icicle formation in the main tunnels and ramps at Vestbane junction, the replacement and upgrade of technical equipment, mainly … Vis anskaffelsen »
Nevnte leverandører: Skanska Norge As
2018-01-23   County road 659 Nordøyvegen, K5 Skjeltene-Harøya (Statens vegvesen)
County road 659 Nordøyvegen, is a mainland connection that shall connect the Nordøy islands in Sunnmøre to the mainland, via undersea tunnels and bridges. Nordøyvegen will give a ferry free road connection to Lepsøya, Haramsøya, Skuløya/Flemsøya and Fjørtofta in Haram municipality and Harøya in Sandøy municipality in Møre og Romsdal. Vis anskaffelsen »
Nevnte leverandører: Skanska Norge As
2017-07-10   E39 Rogfast — E13 the Side tunnel Arsvågen (Statens vegvesen Region vest)
Contract E13 includes the engineering design and construction of a side tunnel with 2 courses of 1 980 m. The construction of: Vis anskaffelsen »
Nevnte leverandører: NCC Norge AS
2017-06-20   County road 714 Stokkhaugen — Sundan: The Åstfjord junction (Statens vegvesen Region midt)
The Norwegian Public Roads Administration, Mid Region invites tenderers, on behalf of Sør-Trøndelag County, to a competition for the procurement of county road 714 Stokkhaugen — Sundan: the Åstfjord junction The contract includes the construction of Slørdal tunnel (T9.5), Approx. 2 650 m long, Åstfjord bridge approx. 735 m long and Mjønes tunnel (T9.5) approx. 770 m long, as well as roads in open air zones, approx. 1 500 m. The project consists of: — Slørdal tunnel, including electro approx. 2650 m long … Vis anskaffelsen »
Nevnte leverandører: Bertelsen & Garpestad AS Metrostav, a.s.
2017-06-15   Fv 714 Stokkhaugen — Sundan: New road round Krokstadøra (Statens vegvesen Region midt)
The Norwegian Public Roads Administration, Mid Region invites tenderers, on behalf of Sør-Trøndelag County, to a competition for the procurement of county road 714 Stokkhaugen — Sundan: New road round Krokstadøra. The contract is for the construction of 3.7 km new county road and the accompanying local roads between Snilldalsli and Berg in Snillfjord municipality. The stretch will include a tunnel, Åli tunnel, of approx. 120 m, including portals and a bridge over Bergselva, approx. 148 m. Vis anskaffelsen »
Nevnte leverandører: Bertelsen & Garpestad AS
2017-05-03   E6 Soknedal, lot Vindåsliene-Korporalsbrua. Road, tunnel and bridge works (Statens vegvesen Region midt)
The Norwegian Public Roads Administration Mid Region invites tenderers to tender contest for the project E6 Soknedal, lot Vindåsliene-Korporalsbrua. The contract includes the construction of a 3.6 km long tunnel, including completion and electrical installation works. The contract also includes the construction of a new E6 in open air, with a length of 2.9 km, including a two level interchange south of Soknedal centre, as well as construction of bridges and retaining walls. Vis anskaffelsen »
2017-04-10   County roads 7 Hagaås tunnel and the Liaros tunnel; renovation electrical installations (Statens vegvesen Region vest)
County roads 7 Hagaås tunnel and the Liaros tunnel shall be upgraded in accordance with the Tunnel Safety Regulations (TSF) and the Norwegian Public Roads Administration's handbook N500. All electrical equipment shall be replaced and new technical rooms shall be constructed in both tunnels. New fans shall be installed in the Hagaås tunnel. Some blasting works must be expected. The contract will be carried out as a turnkey contract. Vis anskaffelsen »
2016-12-20   Tunnel renovation Oslo — E18 Ekeberg and Svartdals tunnel (Statens vegvesen Region øst [The Norwegian Public Roads Administration, Eastern Region])
The work comprises the renovation of Ekeberg and Svartdals tunnel on the E6/E18 in Oslo, in the eastern part of the Opera tunnel. The Ekeberg and Svartdals tunnel is 2 connected 2-course tunnels with 2, partly 3, lanes in each course, as well as extensions by ramps. The Ekeberg tunnel is 1 580 m and stretches from Sørenga to Lodalen. The Svartdals tunnel's eastbound and westbound courses are approx. 1 460 and 1 700 m respectively, measured from the Ekeberg tunnel to Ryen. The work shall be carried out in … Vis anskaffelsen »
Nevnte leverandører: Skanska Norge As
2016-09-26   Pre-qualification: E 39 Rogfast contract E 02 — The Kvitsøy tunnel and the middle section of the Boknafjord tunnel (Statens Vegvesen Region vest [The Norwegian Public Roads Administration, Western Region])
The assignment concerns the construction of the Kvitsøy tunnel (approx. 4 km) and the middle section of the Boknafjord tunnel (E 39 Rogfast) approx. 8 km of 2 lane marine tunnel. Also included is the construction of approx. 2 km of open air road and 5 minor bridges. This concerns applications for pre-qualification. Vis anskaffelsen »
2016-07-29   Rehabilitation of E18 Oddernes tunnel and the Banehei tunnel (Statens vegvesen Region sør (The Norwegian Public Roads Administration Southern Region))
Oddernes tunnel and the Banehei tunnel are located on the E18 in Kristiansand kommune. Average annual daily traffic for both of the tunnels is 50 000. The tunnels shall be upgraded in accordance with the Tunnel Safety Regulations. In this connection, some rehabilitation of the tunnels shall also be carried out. Most of the work is described as turnkey contract, but there are also some quantity regulated items for work notifications, permanent signs, VF insurance and securing of rock support. Vis anskaffelsen »
Nevnte leverandører: Skanska Norge As
2016-06-28   Purchase of tunnel ventilators for E39 Eiganes tunnel and rv. 13 Hundvåg- and Ryfylke tunnel (Statens vegvesen Region vest)
Purchase of tunnel ventilators for E39 Eiganes tunnel and rv. 13 Hundvåg- and Ryfylke tunnel. Vis anskaffelsen »
2016-05-31   National Road 77, The Tjernfjell tunnel, Crossing E6 — Solvågli (Statens vegvesen Region nord (The Norwegian Public Roads Administration, Region North))
The project national road 77 the Tjernefjell tunnel includes tunnel works and portals, as well as some roadworks on both side of the tunnel. The length of the tunnel is 3 230 metres and shall be constructed in accordance with class B, with a cross section of T9,5. At the Junkerdal side a cutting and 480 metres road shall be constructed as a connection to the existing national road 77. At the Saltdal side the national road 77 will have a section in open air. The length of this section is 490 metres with a … Vis anskaffelsen »
2016-04-19   The Lia Mountain — the Olvik Lake (Statens vegvesen Region nord (The Norwegian Public Roads Administration, Region North))
The construction of a 5,5 km road — including 2 tunnels with a length of 1 990 m and 360 m respectively, approx. 3,15 km road in open air which includes a filling of 250 metres over the Olvik Lake. Plant engineering electro works in the tunnels are included in the contract. Vis anskaffelsen »
Nevnte leverandører: PNC Norge AS
2016-02-13   Rehabilitation of E39 Kirkheitunnelen, Main Contract (Statens vegvesen Region sør [the Norwegian Public Roads Administration Southern Region])
The Kirkhei Tunnel on the E39 in Mandal kommune is to be rehabilitated, and upgraded according to the Tunnel Safety Regulation. The Kirkehei Tunnel is approx. 845 metres. The works in the tunnel include a lot of electrical works with establishing of new cable ladders, pipes, lights, emergency stations, signs, cabling, earthing, etc. surface water installation and manholes. Some bolts, as there will be some water and frost protection installed and this shall be covered with shotcrete. A new embankment and … Vis anskaffelsen »
2016-01-07   Rv (National road) 150 — Renovation of the Tåsen tunnel (Statens vegvesen Region øst [The Norwegian Public Roads Administration, Eastern Region])
The works include renovation of the Tåsen tunnel at Ring 3 in Oslo. The major part of the works are connected to replacing and upgrading all technical equipment inside the tunnel. The cast-on-site section of the tunnel shall be subject to fireproofing. Some sections with damages in the road superstructure shall be repaired in July 2016. Works in connection with a new sedimentary basin locate at Kaj Munks vei will also be included in the contract. Technical buildings T1 and T2 must be expanded in order to … Vis anskaffelsen »
2015-12-10   Renovation of E18 (the European Road 18) tunnels, northern Vestfold (Statens vegvesen Region sør (The Norwegian Public Roads Administration Southern Region))
6 tunnels on the E18 section in northern Vestfold shall be renovated and upgraded in accordance with the Tunnel Safety Regulations. The following tunnels shall be renovated: — The Hanekleiv tunnel with a length of approx. 1 740 m; — The Løken tunnel with a length of approx. 700 m; — The Hillestadtunnel with a length of approx. 800 m; — The Bringåker tunnel with a length of approx. 1 130 m; — The Botne tunnel with a length of approx. 1 380 m; — The Brekke tunnel with a length of approx. 590 m. The works … Vis anskaffelsen »
Nevnte leverandører: One Nordic kraftmontasje
2015-10-15   Tunnel renovation, Oslo — E6/Ring3 the Bryns tunnel (Statens vegvesen Region øst (The Norwegian Public Roads Administration, Eastern Region))
The works include a complete renovation of the Bryns tunnel. The length of the tunnel is approx. 300 metres and it is situated on Ring 3 in Oslo. There is approx. 30 m of rumble strips over both driving lanes at the portals in the south. The rumble strips shall be demolished and replaced with a concrete slab. A new technical building shall be constructed on the new concrete slab. Approx. 130 m shall be back ripped from the northbound lane for sight expansion. A mechanical room for water treatment plant … Vis anskaffelsen »
Nevnte leverandører: Veidekke Entreprenør As
2015-09-21   T11 Storsandes — Langnesbukt (Statens vegvesen Region nord (The Norwegian Public Roads Administration, Northern Region))
This contract (T11) includes section 1 that goes from Storsandnes in Langfjord to Langnesbukt. A new road and tunnel shall be constructed from Storsandnes at the Troms side of the section to section 2 at Langnes at the Alta side of the section. After the section has been completed there will no longer be necessary to drive round Isnestoften, and the E6 between Troms and Finnmark will be shortened with three km. The works comprise the construction of a road in open air as well as a tunnel. The main works … Vis anskaffelsen »
2015-07-24   County Road 53 Rehabilitation of the Bermåls tunnel (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The Norwegian Public Roads Administration on behalf of Sogn og Fjordane fylkeskommune, shall rehabilitate the Bermåls tunnel (1 639 metres). The works include blasting and construction measures and new electrical installation. Vis anskaffelsen »
2015-07-13   Pre-qualification contract area E6 Helgeland south (Statens vegvesen Region nord (The Norwegian Public Roads Administration Region North))
This notice comprises pre-qualification for the contest for the development of the E6 stretch Nord-Trøndelag border — Osen. The development shall be carried out as a turnkey contract. The contract form is discussed as a road development project and will include engineering design services, construction, operation and maintenance of the E6 between the Nord-Trøndelag border and Osen in Nordland fylke. In the parliamentary bill 148 S (2014—2015), the development and financing of the E6 on the stretch from … Vis anskaffelsen »
2015-07-02   Electrical procurement for Ryfylketunnelen — Contract 09 (Statens vegvesen Region vest)
Described in the attached document: Ryfylketunnelen — Pre-qualification document for electrical procurement. Vis anskaffelsen »
2015-05-09   Joint project, Granfoss tunnel (Statens vegvesen Region øst)
The work is for a complete renovation of Granfoss tunnel on Ring 3 in Oslo and Bærum. In addition there is an approx. 200 m open air zone by the Mustad junction on the border between Bærum and Oslo municipality. This open air zone shall be built into a concrete tunnel that will connect the eastern and western parts of the Granfoss tunnel to 2 long parallel tunnels. After the alteration, each lane in the Granfoss tunnel will be almost 2 200 m. The work shall be carried out on one lane at a time, with … Vis anskaffelsen »
Nevnte leverandører: Skanska Norge As
2015-05-06   A Collective contract Bridge and tunnel maintenance in Finnmark 2015-2017 (Statens vegvesen Region nord (The Norwegian Public Roads Administration Region North))
The contract applies for Region North, but only includes Finnmark County. The contract is a collective contract with unit prices. The contract will be awarded the tenderer with the lowest price. The contract period is 2 years (2015 and 2016). Option for the Contracting Authority to prolong the contract with 1 + 1 year at a time. The maximum total contract period is 4 years. If the Contracting Authority wishes to prolong the contract, the tenderer will receive a written notification about this, within … Vis anskaffelsen »
Nevnte leverandører: Bmo Entreprenør As
2015-04-15   T02 Sørkjosfjell tunnel (Statens vegvesen Region nord)
The project E6 Sørkjosfjellet, which makes up the stretch Sørkjosen to Langli is situated in Nordreisa kommune in Troms county, approx. 100 km from the county border to Finnmark. Storslett is the municipality centre in Nordreisa kommune. The community Sørkjosen is located 4-5 kilometres north west of Storslett. On the Sørkjos side the lot goes from the breakwater in Sørkjosen for 860 metres north west along the current E6 to the portaling for the Sørkjosfjell tunnel. On the Sørelv side, the lot goes 1 … Vis anskaffelsen »
2015-03-10   County Road 773 Upgrading Steinfjell tunnel (Statens vegvesen Region midt)
County Road 773 Steinfjell tunnel was constructed in the 1970's and it currently has an annual traffic count of 200-250 vehicles. The Steinfjell tunnel is in Namsskogan municipality and is approx. 2 100 m. The access to the tunnel is 15 km from the E6 at Brekkvasselv and 22 km from Røyrvik/Limingen. The upgrade of the tunnel mainly includes complete low voltage electro installations and lighting, geological stabilising measures and water and frost protection. In addition the tunnel shall be classified as … Vis anskaffelsen »
Nevnte leverandører: Hæhre Entreprenør As
2014-12-18   County road 714 Stokkhaugen — Sundan: New road and tunnels in Snilldal and Våddånesset (Statens vegvesen Region midt)
On behalf of the Sør Trøndelag county municipality, The Norwegian Public Roads Administration is building a toll package ‘New county road 714 Laksevegen’ in Snillfjord municipality. The work which is now to be carried out includes building of new road and tunnels in Snilldal, altogether 3 360 m, whereby 1 220 m is 2 x 3 lane tunnels (Fossan tunnel and Snilldals tunnel) and a 64 m bridge over Snilldals river as well as connections with the existing road at both ends. In addition, the work includes the … Vis anskaffelsen »
Nevnte leverandører: Kruse Smith Entreprenør As