2025-12-18   Tunnel maintenance 2026-2028 Nordland County. (Nordland Fylkeskommune)
The contract work includes maintenance work with a tunnel for Nordland county (NFK). The extent of the work is mainly water and frost protection, fire protection, establishment of PE foam, shotcrete, assembling bolts etc. Vis anskaffelsen »
2022-06-20   County road 283 Renovation of Bragernes Tunnel (Viken fylkeskommune)
Bragernes Tunnel on county road 283 is 3200 metres long and has three -3 - entrances and exits. Two to the west of the roundabout 'Egget' (Hamborgstrøm culvert and Lajordgata), and one to the east at Brakerøya. The electrical installations in the tunnel will more or less be completely renovated. The tunnel has an ADT count of approx. 16,000 eastwards (Brakerøya) and approx. 20,000 westwards (roundabout at the Hamborgstrøm culvert). Vis anskaffelsen »
2021-05-05   2021-37 Tunnel and Rock Protection (Møre og Romsdal fylkeskommune)
The contract work includes maintenance works with tunnel and rock protection for Møre og Romsdal fylkeskommune (Møre og Romsdal County) (MRFK). The work that will be performed primarily concerns water and frost protection measures, fire protection measures, establishment of PE foam, rock protection in the form of scaling, shotcreting, mounting of bolts, vegetation clearing, mounting of quarry nets, mounting of ice nets. See A3: Information on the project for further information. Tender conference: A … Vis anskaffelsen »
2017-10-06   Turnkey contract for Åsland Shooting range (Oslo kommune v/ Kultur- og idrettsbygg Oslo KF)
The shooting range, situated in a rock hall at Åsland, includes a shooting gallery with 50, 100 and 200 m shooting range distances. The Shooting range shall contain 38 stands divided between 4 floors. Accommodations for users of the shooting range shall also be constructed near the shooting range. The framework agreement consists of 4 lots: — Tunnel and cutting, — Portal and stands, — Accommodations for users of the shooting range, — Outdoor works. Vis anskaffelsen »
2016-09-26   Pre-qualification: E 39 Rogfast contract E 02 — The Kvitsøy tunnel and the middle section of the Boknafjord tunnel (Statens Vegvesen Region vest [The Norwegian Public Roads Administration, Western Region])
The assignment concerns the construction of the Kvitsøy tunnel (approx. 4 km) and the middle section of the Boknafjord tunnel (E 39 Rogfast) approx. 8 km of 2 lane marine tunnel. Also included is the construction of approx. 2 km of open air road and 5 minor bridges. This concerns applications for pre-qualification. Vis anskaffelsen »
2013-07-10   Expansion central treatment plant North Jæren-B1 building and construction engineering works (IVAR IKS (Forsyning))
The central treatment plant at North Jæren shall be expanded and rebuilt with activated sludge for compliance with the secondary treatment requirements. As a part of these works it shall be established a new access to existing underground facilities and the existing underground facilities shall be rebuilt, renovated and expanded with new caverns and new features. This contract, B1, includes: — Demolition of the existing parts of the existing treatment plant, including removal of the machine system and … Vis anskaffelsen »
2013-07-02   510642-Expansion of Central Treatment Plant at Nord Jæren - B1 - Construction and engineering works (IVAR IKS)
The central treatment plant at Nord - Jæren shall be expanded and rebuilt with active sludge for compliance with the secondary treatment requirements. As part of this work it shall be established new access to the existing underground facilities and existing underground facilities shall be rebuilt, renovated and expanded with new caverns and new features. This contract, B1, consists of the following: - Demolition of the existing parts of the existing treatment plant, including the removal of machinery … Vis anskaffelsen »
2013-05-16   201302255 - Follobanen - D&B Tunnel – Contract nr. 2 (Jernbaneverket)
The Contract comprises all conventional tunnels driving scope (Drill & Blast) in the Follo Line Project, i.e. the Inbound Østfold Line (IØB), inner part of the twin Follo Line tunnels, a number of crossings with existing tunnels and roads and the 3-Track tunnel at the interface with the EPC contract for modification work at the Oslo S Station and the TBM contract (Tunnel boring machine) For more information - See the prequalification documents. NOTE: To register your interest in this notice and obtain … Vis anskaffelsen »
2011-02-18   Framework agreement, water protection measures Molde Parking building (Molde kommune)
The Awarding Authority invites to an open tender contest where the purpose is to enter into a framework agreement regarding water protection measures for Molde parking building. Molde parking building is a facility blasted in rock and the rock is covered with gunite. The facility comprises of 7 parking halls with a length of approx. 135 m as well as access roads. One hall (shelter) is already covered with profiled boards. The remaining halls and rear street are requested covered with a new system such as … Vis anskaffelsen »