Antall eller omfang
The principal works included in this contract are:— Approx. 15 km national road,— Approx. 8 km overtaking lane,— 2 tunnels (T 10, 5) with lengths of approx. 2, 8 and approx. 3, 7 km,— 4 tunnel portals,— 9 technical buildings (4 buildings in open air),— 2 concrete bridges in the section; Juvet Bridge with a length of 90 m and Rudselva Bridge with a length of 82 m,— 2 overpasses as a part of elevated roundabout in Ørgenvika,— 2 operating subpassages.