Nyeste anskaffelser av Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West)
2016-08-20E39 Svegatjørn — Rådal. Noise reduction measures. Contract k33 (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
Statens vegvesen Region vest constructs a new E39 road between Svegatjørn in Os municipality and Rådal in Bergen municipality. In relation to this, Statens vegvesen is obligated to implement noise measures on nearby properties that experience noise above the limited value determined in the planning regulations for the project. In accordance with noise mapping carried out by Norconsult AS, noise measures must be implemented on a total of 50 residences in the Skjold area. Facade measures shall be …
Vis anskaffelsen »
2016-05-26E39 Heavy vehicle inspection place Bergen Nord (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
A new control station is established in Bergen nord. The control station shall carry out inspections of heavy vehicles. In order to automatically be able to pick vehicles for inspections, a system for automatic selections shall be established. 3 control areas shall therefore be established along the existing road.
The control areas are:
1. South of the Glasskart tunnel (E39 from Bergen), northbound;
2. North of the Eikås tunnel (E39 from Nordhordland), southbound;
3. East of Vågsbotn (E16 from Arna), …
Vis anskaffelsen »
2016-05-19E 39 Bømlafjord tunnel; Electro and SRO (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The E39 Bømlafjord tunnel shall be upgraded and renovated in order to meet the current requirements.
The total construction period is estimated to approx. 1.5 years from 2016 to 2018.
Below is a list of the key elements in the project:
— Operation and maintenance of electro and SRO installations in the tunnel, as well as Føyno and Ulveraker in the contract period.
— 6 Technical buildings
— 13 major distributions
— 76 automation cupboards
— 69 Emergency station cupboards
— 525 days with traffic flow
— …
Vis anskaffelsen » Nevnte leverandører:Risa As
2016-04-26RV 15 Inspection Site Kjøs (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The works include the reconstruction of the existing inspection site at Kjøs.
— The site shall be extended with approx. 11 metres. This results in a reduced green area between the site and the road.
— Relocation of some manholes and alteration of the lighting system (relocation and new pylons).
— Blasting/spiking in the area where the building is currently located.
— New parking lots.
— A new office unit shall be constructed.
— Hooking up with a private water supply system and set up a toilet facility …
Vis anskaffelsen »
2016-04-11E39 The Eiganes tunnel — E06 the Day zone Tasta (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
This contract includes the construction of a new submerged four-lane road E39 from the Eiganes tunnel portal at Tasta, to interlacing a two-lane road with exit to the parking lot by Store Stokkavann, a stretch with a length of approx. 700m. A new two level interchange, designed as a roundabout bridge across the new E39 with connection to the local traffic as well as a deceleration lane and access lane to E39. A new bridge shall also be constructed over the E39 road. The bridge shall provide access to …
Vis anskaffelsen » Nevnte leverandører:Risa As
2016-03-22County road 546 Fanavegen, pedestrian school by Kirkevoll school (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The works consist of altering the existing T junction to a roundabout as well as constructing a subway in the junction between county road 546 Fanavegen and county road 163 close to Fana church.
The footpath culvert shall function as a footpath access to Kirkevoll school.
A diversion road shall be constructed in order to establish a construction pit for the footpath culvert.
There are demanding ground conditions in the area and sheet piling must established between the diversion road and the construction …
Vis anskaffelsen »
2015-11-09E39 Foot/Cycle path Minde Allé — Fabrikkgaten (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The foot and cycle path is 1 270 metres long. The foot and cycle path shall cross Minde Allè through a culvert. This culvert is partly through areas with lighter industries and offices, as well as a section where the foot and cycle path is under buildings. The clear height here is 4 metres.
The work consists of:
— Concrete works, the construction of a culvert and construction of mores and a smaller culvert for water pipelines,
— Sheet piling works, including injection in connection with the construction …
Vis anskaffelsen »
2015-07-06County Road 47 [Fv. 47] Kvala — Fagerheim (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
The project comprises construction of a new four lane road from the junction at Austreimsvegen in the south and for connecting to the existing road north of the junction with Jovegen, profile 408-1745. The following shall be built: 2 new road bridges, a new environment tunnel, an underpass, 2 foot bridges, two roundabouts, foot and cycle paths, bus stops and side roads. In addition, noise dampers and noise barriers will be erected along the road. The combined length of driving roads, including bridges …
Vis anskaffelsen »
2015-06-05Fv 55 (County Road 55) The Høyanger tunnel, rehabilitation (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
— The Høyanger tunnel 7 543 m, Fv. 55 Høyanger kommune and Balestrand kommune.
— Demolition of the old water and frost protection, PE foam/aluminium plate arch. Approx. 10 500 m².
— Demolition of wire mesh netting, approx. 18 500 m².
— Demolition of electrotechnical installations, approx. 7 600 m.
— Installation of temporary lighting.
— New cable ladder, approx, 7 600 m.
— Installation of new water/frost protection foam, Approx. 15 000 m²
— Rock protection with shotcrete, Approx. 7 000 m³.
— Bolting. …
Vis anskaffelsen »
2015-02-20Noise reduction measures along the new E39 in Rådal in Hordaland (Statens vegvesen Region vest (The Norwegian Public Roads Administration, Region West))
Statens vegvesen Region vest shall construct a new E39 road between Svegatjørn in Os kommune and Rådal in Bergen kommune. In relation to this, Statens vegvesen is obligated to implement noise measures on nearby properties that experience noise above the limited value determined in the planning regulations for the project. In accordance with noise mapping carried out by Norconsult AS, noise measures must be implemented on a total of 130 residences. Facade measures shall be implemented in the form of new …
Vis anskaffelsen »