2026-03-19Mapping bottom debris on coastal locations 2026-2030 (Miljødirektoratet)
The objective of the assignment is to map the seabed along the Norwegian coast to identify accumulation and quantify the amount and type of garbage. The assignment involves the use of underwater equipment for collecting pictures of the seabed from 100 metre long trancts in defined areas close to all 13 beaches that have OSPAR monitoring for litter of beach. See the "Annex - The Customer ́s description of the assignment" for a detailed description. The estimated annual budget limit (assuming there are no …
Vis anskaffelsen »
2025-12-18Assessing the Nature-Related Dependencies and Impacts, Risks and Opportunities of Norwegian State-Owned Enterprises (SOEs) (Nærings- og fiskeridepartementet)
1.2 Purpose and scope of the procurement The purpose of the procurement is to better understand the nature-related risks and opportunities faced by enterprises in which the state has an ownership share, the steps these companies are taking to manage nature-related risks and opportunities, and what are currently considered best practices in this area. The following scope of the procurement has been identified, as further described in appendix 1: i) Screen the nature-related dependencies and impacts, risks …
Vis anskaffelsen »
2025-03-14Framework agreement - environmental engineering and geotechnical ground surveys. (Stavanger kommune)
Stavanger development and Stavanger municipality, c/o urban environment and development, will enter into a framework agreement with tenderers who can carry out environmental and geotechnical ground surveys, laboratory surveys of samples, as well as data reports. Two tenderers shall be awarded with a distribution key of 60% to tenderer ranked no. 1, and 40% to tenderer ranked as no. 2.
Vis anskaffelsen »
2024-02-15E6 Hommelvik bridge southbound (Nye Veier)
The contract work will be for the construction of a new Hommelvikbru southbound on the stretch E6 Ranheim-Værnes. This involves completing the construction of K62 Hommelvik bridge southbound, with the accompanying levelling of slope stops Nesbakken in order to improve stability conditions. Installation of sheet piling on the slope in order to enable execution of the building pits in axis 1 and 2. In addition there will be demolition of four buildings and the execution of a temporary retaining wall at the …
Vis anskaffelsen »
2023-11-13Framework agreement - monitoring system for solar panel installations. (Oslo kommune v/ Oslobygg KF)
Oslobygg needs an operational and monitoring system for solar panel installations. The framework agreement will involve a one-time installation on all the existing installations, and an option for the contracting authority to install on future installations. The delivery consists of a firmware part and a software part. Oslobygg currently has 56 solar panel installations located in locations all around Oslo. Oslobygg would like to procure a joint monitoring system for the entire 'solar car park'. The …
Vis anskaffelsen »
2023-10-10National road 13 Djupevik - Kviturtunnelen (Nye Veier AS)
The contract work includes a turnkey contract for the design, construction and guarantee responsibility for the new national road 13 (Rv13), including a new pedestrian and cycle path and landslide protection between Djupevik and Kviturtunnelen in Ullensvang municipality.
The project covers a stretch of approx. 1200 m and includes the construction of a new 7.5 m wide road partially aligned with the existing road and a new pedestrian and cycle path that is also partially aligned with the existing road.
In …
Vis anskaffelsen »
2023-09-02Presterød School - environment consultant, environment and reuse mapping (Tønsberg kommune)
Presterød School is to be expanded from a two parallel school to a three parallel school. The number of classes will be expanded from 14 to 21 classes (approx. 200 new pupils). There will be a total of approx. 570 pupils at the school after the planned measure.
A new extension/school wing and multipurpose hall of approx. 4300 m2 gross are to be constructed, as well as alterations to approx. 1450 m2 gross existing school area. The existing gym hall will be demolished.
Vis anskaffelsen »
2023-03-24Demonstration project for tools for LCA (Statens vegvesen)
A report that includes the findings and remarks on tools and methods for calculating climate gas emissions, specified as GWP with unit CO2e, in different phases of infrastructure projects in the Nordic countries. The report will be based on comparable calculations of selected infrastructure projects with the use of guidelines and tools that are provided by the transport and infrastructure departments in Norway, Denmark, Sweden, and Finland.
Vis anskaffelsen »
2023-02-23Cleaner Port Stavanger - Framework agreement for environmental services (Stavanger kommune)
Stavanger Municipality c/o Urban Environment and Development [Bymiljø og utbygging (BMU)] invites tenderers to this contest for the commencement of a framework agreement for professional environmental consultancy and services for cleanup of the contaminated seabed in Stavanger municipality.
The framework agreement will mainly include engineering design and consultancy assignments for facility projects related to the Cleaner Port Stavanger project.
A framework agreement will be signed with a maximum of …
Vis anskaffelsen »
2023-01-16Framework agreement - environment consultant (RIM) (Kristiansand kommune)
The contest concerns entry into a parallel framework agreement (The Framework Agreement) for assistance from an environment consultant (RIM)
in the contracting authority's projects. The framework agreement covers research work, design and consultancy assignments.
The purpose of the framework agreement is to ensure that throughout the entire contract period the contracting authority has access to
assistance from RIM with relevant competence to cover the contracting authority's ongoing need for RIM …
Vis anskaffelsen »
2022-12-05Architectectural and engineering design services for the pre-project Sande school (Sunnfjord kommune)
Sunnfjord municipality's intention with this invitation to tender is to connect with a provider with the right expertise and experience for the implementation of a pilot project for Sande school (Sande skule)
The intention of the pre-project is to find the best possible solution for renovation and possible development of Sande school in accordance with the given financial frame. The assignment shall result in the preparation of documentation that shall be used as tender documentation for the turnkey contract.
Vis anskaffelsen » Nevnte leverandører:HR Prosjekt AS
2022-09-23E6 Berkåk - Vindåsliene (Nye Veier)
The contract work consists of a turnkey contract for engineering design services for, the construction of, and guarantee liability for a new E6 between Berkåk and Vindåsliene. The contract consists of approx. 15 km new E6 and also includes the construction of approx. 15 km local and county roads. Several bridges, an approx. 800 m long tunnel for a county road with the associated control and safety measures are also to be established within these limits.
The E6 will mainly be constructed as a new road …
Vis anskaffelsen »
2022-05-24Procurement of consultancy assistance for preparatory work comprising the formulation of tender documentation,... (Statens vegvesen)
The Norwegian Public Roads Administration, Development Division, c/o the Joint Project Arna - Stanghelle, (hereafter called the contracting authority), would like tenders for consultancy services for preparatory work on the Joint Project. This consists of assistance with the preparation of the tender documentation for the procurement of contractors for preparatory work, various preliminary surveys, environmental plans, and the formulation of emission applications.
Vis anskaffelsen » Nevnte leverandører:Cowi AS
2022-03-22E6 Storhove - Øyer 2022 (Nye Veier AS)
The contract work consists of a turnkey contract for engineering design services for, the construction of, and guarantee liabilities for a new motorway on E6 between Storhove and Øyer.
The project's stretch is a total of 9.6 km, and includes the construction of an approx. 4.4 km new four-lane motorway (with a road width of 20 m) including the Fåberg tunnel with a length of approx. 2.7 km.
The project also includes pavement widening and upgrading of the section with approx. 2.7 km, and upgrading of a …
Vis anskaffelsen » Nevnte leverandører:Af Gruppen Norge As
2022-02-11Consultancy services for restoring nature (Forsvarsbygg)
The procurement is for consultancy services for restoring nature. The content of the framework agreement is professional assistance for restoring nature that will contribute to the contracting authority's projects are carried out in a way that prevents damage and is gentle as regards the nature, in addition to assistance with repairing damaged nature and restoration.
Vis anskaffelsen » Nevnte leverandører:Multiconsult Norge AS
2021-11-16Approach Borg - environment and monitoring programme (Kystverket)
In general the assignment includes environmental advice and support in the project. Specifically, the tenderer will be expected to contribute with:
- Preparation of the necessary reports and plans in accordance with the given permission.
- Follow-up of the environment monitoring programme during the trial dredging and comparison of the results. This includes the necessary filed work.
- Implement, possibly adjust the programme and plans after the results from the trial dredging.
- Contribute to the …
Vis anskaffelsen »
2021-09-10Framework agreement for consulting engineer services services within Roads, Acoustics, Geotechnics, Environmental... (Karmøy kommune)
The contract will include different types of assignments within the role of consulting engineer services connected to Roads, Acoustics, Geotechnics, Environmental and Landscape Architect in Karmøy kommune's] projects.
The purpose of the procurement is to cover the need for consultancy services in building and construction. The contracting authority intends to enter into five parallel framework agreements in the following disciplines with two (2) suppliers per contract:
Lot 1: Consulting Roads …
Vis anskaffelsen »
2021-04-16Framework Agreement for Consulting Environmental Engineer (RIM) (Forsvarsbygg)
The procurement will contribute to cover the contracting authority's need for consultancy services and engineering design connected to individual assignments for the discipline Consulting Environmental Engineer.
The content in the framework agreement is environmental engineering ground surveys and action plans, construction waste mapping, engineering design of relevant measures, etc. that fill within the subject area.
A framework agreement will be signed with one tenderer.
The contract is nationwide.
Vis anskaffelsen » Nevnte leverandører:Multiconsult Norge AS (hovedenhet)
2021-03-17Procurement – Consultancy Services Building and Construction, 2020 (Ålesund kommune)
The purpose of the procurement is to cover the need for consultancy services in building and construction. The contracting authority intends to enter into six parallel framework agreements in the following disciplines:
1) ARK: architect services;
2) LARK: landscape architect;
3) IARK: interior architect;
4) RIB: civil engineer;
5) RIBr: fire engineer;
6) RIAku: acoustics engineer;
7) RIV: ventilation engineer;
8) RIE: electrical engineer;
9) RIM: environmental engineer;
10) project and engineering design …
Vis anskaffelsen »
2021-03-02Mapping and Monitoring — Stamnettprosjektet (the Trunk Network) (Oslo kommune v/Vann- og avløpsetaten)
In connection with the construction of tunnels for transferring clean water through Oslo there is a need to implement condition assessment of buildings and structures that can be affected by the construction works that will be carried out. Hereunder, also follow-up of subsidence, ground water, vibrations and noise etc. that can affect the properties and associated structures and residents.
There will be a total of six construction areas of which two are minor construction sites for risers and manholes. …
Vis anskaffelsen »
2020-11-18E6 Storhove — Øyer (Nye Veier AS)
The contract work consists of a turnkey contract for engineering design services for, the construction of, and guarantee liability for a new motorway between Storhove and Øyer.
The total length of the new E6 will be approx. 9.6 km. There is a development plan for the stretch up until profile number 8.100.
From profile number 8.100 to 9.600 the turnkey contractor must plan, regulate, and construct the E6 with H5 standard.
The lot E6 Storhove – Øyer goes through 2 municipalities; Lillehammer and Øyer.
Vis anskaffelsen »
2020-09-01E39 Lyngdal East — Lyngdal West (Nye Veier)
The contract work includes turnkey contracts for engineering design, construction of and warranty responsibility for a new four-lane motorway between the Herdalen junction and Røyskår junction in Lyngdal kommune [Lyngdal Municipality]. The stretch includes:
— approx. 5.3 km open air road,
— approx. 6.4 km tunnel, divided across two tunnel (the Rossås tunnel, 3.7 km, and the Kålåst tunnel, 2.7 km),
— two longer bridges: Kvelland (over Lygna river) and Hårikstad),
— two motorway junctions with …
Vis anskaffelsen » Nevnte leverandører:JV Implenia Stangeland E39 Lyngdal ANS
2020-05-07E6 Kvænangsfjellet (Nye Veier AS)
Thus far, the contract scope has been divided into three lots:
• Lot 1: Oksfjordhamn — Tverrelva
• Lot 2: Tverrelva — Sandneselva
• Lot 3: Sandneselva — Karvik.
Lot 2 has detailed regulation and lots 1 and 3 are area regulated. It must be anticipated that the entire contract scope must be recalculated due to optimisation. Physical start and stop points must be adapted to the existing road.
A thorough description of the scope of works and implementation requirements are in the tender documentation.
The …
Vis anskaffelsen » Nevnte leverandører:Leonhard Nilsen & Sønner AS
2019-11-29E18 Langangen – Rugtvedt (Nye Veier)
Optimisation and development project for a 4 lane motorway with a 110 km/h speed limit on the stretch Langangen — Rugtvedt, with guarantee responsibility. See chapter D1.1 point 1 for further details.
At the northern end it will join an existing 4 lane motorway ended by the Norwegian Public Roads Administration at Langangen in 2012. At the southern end it will join Nye Veier's ongoing project E18 Rugtvedt-Dørdal, which is under construction and is expected to be completed in December 2019.
The contract …
Vis anskaffelsen » Nevnte leverandører:EIFFAGE Génie Civil
2019-11-12Building Inspections, Subsidence, Noise, Vibration and Dust Measurements (Oslo kommune v/Fornebubanen)
The Fornebu Railway will be a new 8 km long underground railway that will go from Majorstuen to Fornebu. Six new stations are to be established as part of the new route, as well a new workshop and a base at Fornebu. The entire line will be in a tunnel and entails comprehensive ground works in both rock and sensitive uncompacted materials with subsequent impact on the external environment through vibration impacts on the surrounding neighbouring buildings, and subsidence, noise and dust impact. The …
Vis anskaffelsen » Nevnte leverandører:Bergcon AS
2019-11-06E6 Storhove — Øyer (Nye Veier)
Development of approx. 9,6 km completed E6, of which 8,1 kms of four-lane motorway is classified H3 based on the zoning plan adopted in early 2020. Northern 1,5 km will be regulated and built by the contractors with H5 standard. The stretch contains two-lane T10,5 tunnels of approx. 2,6 km, a junction as well as a number of minor structures and other measures.
Clients maximum prise (CMP) for the contract work is 1 300 000 000 NOK excluding VAT and options.
Vis anskaffelsen »
2019-06-18E6 Moelv — Roterud (Nye Veier)
Project development and the development of an approx. 11,3 km complete 4-lane motorway including a new Mjøs bridge with a length of 1,6 km and 2 crossings and numerous smaller structures. The contract also includes the preparation of zoning plan for a decision, based on the approved municipal zoning plan. A substantial part of the contract includes the development and execution of the Mjøs bridge where the contractor must select a bridge system with flexibility in relation to type of bridge, materials …
Vis anskaffelsen » Nevnte leverandører:BESIX Nederland
2019-06-04Framework of LCA Guides for Infrastructure (Statens vegvesen)
Three Nordic National Road Administrations (NRA’s), namely Norwegian Public Roads Administration (NPRA), Swedish Transport Administration (STA) and Finnish Transport Agency (FTA), want jointly to further develop their LCA tools for assessing climate impact of infrastructure building.
A draft guide has been made by Østfoldsforskning in 2018. This draft guide forms the basis for further work. The draft guide contains information on the theory behind LCA, and practical information on how to use LCA.
To …
Vis anskaffelsen »
2019-06-03Dredging, Depositing and Covering, Project Horten Ren Indre Havn (Horten kommune)
The project ‘Horten Clean Inner Port’ (‘Horten Ren Indre Havn’) aims at reducing negative ecological effects of the environment in Horten Inner Port and preventing spreading of environmental poisons This must be achieved by covering areas of the seabed in Horten Inner Port with clean masses in an area of approx. 460 000 m. Dredging for restricted areas must be conducted, in order to ensure adequate sailing depth.
The dredged deposits shall be disposed at a designated seabed area or at an alternative …
Vis anskaffelsen » Nevnte leverandører:Peab Anlegg AS
2019-04-26E6 Roterud — Storhove (Nye Veier AS)
E6 Roterud — Storhove:
Project development and the development of an approx. 23 km complete 4-lane motorway including a tunnel with a length of approx. 4,4 km, a bridge with a length of 0,7 km and 3 crossings and numerous smaller structures. The contract also includes the preparation of zoning plan for a decision, based on the approved municipal zoning plan.
The Contracting Authority's budget price (BBP) for the contract work (excluding options and work based on a cost-plus basis) is 3 750 000 NOK …
Vis anskaffelsen » Nevnte leverandører:Af Gruppen Norge As
2019-03-14E6 Ulsberg-Vindåsliene (Nye Veier)
The contract work is for the construction of a new E6 between Ulsberg and Vindåsliene, including a connection to the new county road 700 in the centre of Berkåk. The project goes through Rennebu and Midtre Gauldal Municipalities. It is a prerequisite that the development plan is approved by the end of June 2019.
Approx. 25 km new E6 (mostly dual carriageway) is to be constructed in virgin terrain, to the east of Dovrebanen, and approx. 1,2 km of the new county road 700. The project primarily concerns …
Vis anskaffelsen » Nevnte leverandører:FCC Construcción, S.A
2019-02-28Procurement of Environmental Monitoring (Bane NOR SF)
Bane NOR will construct a new double track between Sandbukta in Moss and Såstad in Rygge. An application has been sent to the County Governor in Østfold (now Oslo and Viken) for an emissions licence in accordance with the Pollution Act § 11 for the planned work in Moss and Rygge Municipalities in the turnkey contract (SMS 2A). The assignment involves, amongst other things, making a measuring programme and monitoring programme for emissions in accordance with the emissions licence.
Vis anskaffelsen »
2019-01-25E6 The Moelv Crossing (1) (Nye Veier)
The main works include the engineering design, the construction and 20 years maintenance services for a four-lane European road E6, with profile Nos. 27470 and 28500 and road lighting systems and accompanying ramps and structures. Adaptation must also be made for the European road 6 towards a future Mjøsa Bridge. Measures must also be made for side roads and foot/cycle paths and a commuter parking area.
Vis anskaffelsen » Nevnte leverandører:Peab Anlegg AS
2019-01-22E6 Moelvkrysset (Nye Veier)
The main works include the engineering design, the construction and 20 years maintenance services for a 4-lane European road E6, with profile Nos. 27470 and 28500 and road lighting systems and accompanying ramps and structures. Adaptation must also be made for the European road 6 towards a future Mjøsa Bridge. Measures must also be made for side roads and foot/cycle paths and a commuter parking area.
Vis anskaffelsen »
2018-12-08E18 Kjørholt — Rugtvedt (Nye Veier)
The contract work consists of engineering design services for and the construction of a new Grenland bridge over Frierfjorden in Porsgrunn and Bamble Municipalities. In addition to the new Grenland bridge, the contract also includes the completion of Kjørholt and Bamble tunnels. Newly blasted tunnels must be completed and existing tunnels with traffic must be prepared for one-way traffic. The contract mainly comprises:
— open air road, approx. 150 m,
— new Grenland bridge approx. 600 m,
— completion of 2 …
Vis anskaffelsen »
2018-06-21E6 Kvål - Melhus centre (2) (Nye Veier)
The contract work for the E6 Kvål - Melhus centre includes project development, engineering design services for and the construction of an approx. 7 km new dual carriageway with a speed limit of 110 km /h and street lights. The road stretch goes through Melhus municipality.
Vis anskaffelsen » Nevnte leverandører:Peab Anlegg AS
2018-01-10E39 Kristiansand west - Mandal east new (Nye Veier)
The contract work for the E39 Kristiansand west - Mandal east includes engineering design services for and the construction of approx. 19 km new 4 lane motorway with a speed limit of 110 km/h from Kristiansand west to Mandal east, with an option for maintenance and operation.
The road stretch goes through the western part of Kristiansand municipality, through Songdalen municipality and Søgne municipality and a little into Mandal municipality. The speed limit will be 110 km/h on the entire stretch.