Liste og kort beskrivelse av regler og kriterier
Tenderers shall have sufficient experience with management and execution of road projects of a relevant nature and degree of difficulty.
The contractor shall, in addition, have sufficient experience of a relevant nature and degree of difficulty from the following central works:
1. Electro technical installations (Elkraft) in the tunnel renovation project (establishment, installation and commissioning).
2. Ekom and automation in the tunnel renovation project and connection to the Road Traffic Centre.
3. Construction and concrete work in the road tunnel.
4. Water and frost protection in the road tunnel.
5. Ditch work in the road tunnel.
6. Traffic deviation (ÅDT >30,000).
7. Work notification and work protection on high traffic roads (ÅDT >30,000).
The contractor shall have experience from the execution of the central works as mentioned above. If the contractor only has experience from, for example, managing contract helpers, the contractor must rely on other entities that have the necessary experience from the execution of the relevant central works, see B2 point 4.1.
Documentation requirement:
1. A list of up to 10 and not less than 3 contracts that the contractor has carried out or execute during the last ten years calculated from the deadline for submitting tenders to the competition. The minimum and maximum limit applies to the total number of reference projects, and is the same regardless of whether the tenderer fulfils the qualification requirement alone or relies on others to fulfil the qualification requirement. The list shall, cf. the form included in chapter E1 point 5.1, contain the following for each of the contracts:
• Name of the recipient (contracting authority)
• A description of what the contract work was like, including relevance to the qualification requirement.
• What work was carried out by the contractor himself and what work was carried out by sub-suppliers.
• Date of the delivery.
• The contract ́s value.
• Reference person/gender neutral preferred at the contracting authority with contact data (telephone number and email address) and a statement of the person in question ́s role at the builder during the contract. The gender neutral preferred may be contacted in order to verify that the information in the form is correct. The contractor will be responsible for ensuring that the reference person is available.
2. Completed form in chapter 2. E1 point 5.1.