The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the 3 best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract includes, amongst other things, a new Sotra bridge, 4 tunnels, 6 major split level junctions, new foot/cycle paths, new bus terminals, as well as upgrades to side roads and parts of the existing road network. The current national road 555 is a single carriageway of varying standard and a very high ADT. The transport system is very vulnerable with the current bridge being the only access to New Øygarden Municipality.
Frist
Fristen for mottak av tilbud var 2020-02-28.
Anskaffelsen ble publisert 2019-12-23.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2019-12-23) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Referansenummer: 19/352033
Kort beskrivelse:
“The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The...”
Kort beskrivelse
The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the 3 best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract includes, amongst other things, a new Sotra bridge, 4 tunnels, 6 major split level junctions, new foot/cycle paths, new bus terminals, as well as upgrades to side roads and parts of the existing road network. The current national road 555 is a single carriageway of varying standard and a very high ADT. The transport system is very vulnerable with the current bridge being the only access to New Øygarden Municipality.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Tilleggs-CPV: Bro📦 Utførelsessted
NUTS-region: no051 🏙️
Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet
“Language requirements: see the tender documentation B1 General Contest Rules, points 7.1, 7.2 and 7.3.”
Kilde: OJS 2019/S 249-619892 (2019-12-23)
Kunngjøring om tildeling av kontrakt (2022-04-27) Gjenstand Anskaffelsens omfang
Kort beskrivelse:
“The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The...”
Kort beskrivelse
The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the three best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract includes, amongst other things, a new Sotra bridge, four tunnels, six major split level junctions, new foot/cycle paths, new bus terminals, as well as upgrades to side roads and parts of the existing road network. The current national road 555 is a single carriageway of varying standard and a very high ADT. The transport system is very vulnerable with the current bridge being the only access to New Øygarden Municipality.
Vis mer
Totalverdi for anskaffelsen: 16 262 000 000 NOK 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Utførelsessted
NUTS-region: Vestland🏙️
“The Norwegian Public Roads Administration has entered into an agreement with the consortium Sotra Link for the construction work, as well as operation and...”
The Norwegian Public Roads Administration has entered into an agreement with the consortium Sotra Link for the construction work, as well as operation and maintenance. The value of the agreement is NOK 20,626 million including VAT. The construction work is planned for completion in 2028 with subsequent operation and maintenance work until 2042.