Nyeste anskaffelser av bygge- og anleggsarbeid i forbindelse med Gangsti i Norge
2026-04-17Deadline 2026-05-20Framework agreement for construction services of a smaller extent (Sandnes kommune)
The contracting authority needs to enter into a parallel framework agreement based on a turnkey contract for site services of a smaller extent. The framework agreement shall cover a broad spectrum of construction services, including, among other things, the following: Small water and sewage installations, e.g. rush assignments. - Small road installations, e.g. minor improvements. - Minor assignments in parks - Minor assignments for Sandnes Eiendom (schools, nurseries and other institutions) Minor …
Vis anskaffelsen »
2025-03-16135-BYM-2023 Parallel framework agreements for construction work (Oslo kommune v/ Bymiljøetaten)
The Agency for Urban Environment intends to enter into a framework agreement for the purchase of site work that can cover the entire Urban Environment Agency ́s management area. The framework agreement will cover construction work that mainly involves works on, along and in roads, but it will also include ground and surface works within the agency ́s other disciplines, such as urban areas, park areas, footpaths, sports facilities etc. This framework agreement will be in addition to separate tender …
Vis anskaffelsen »
2024-05-10Building of viewpoint at Bøyabreen in Fjærland (Statsforvaltaren i Vestland)
Jostedalsbreen National Park board wants to get a viewpoint at Bøyabreen in Fjærland. A new path and 100 m existing path shall be constructed. A small amphitheatre with room for approx. 30 persons shall be facilitated. Two footbridges shall be assembled. These bridges are a mission on the side of this. More information is in the tender documentation and annexes.
Vis anskaffelsen »
2024-05-0812-BYM-2023 Procurement of contractors for upgrading Sandakerveien-Nycoveien (Oslo kommune v/ Bymiljøetaten)
Sandakerveien in Oslo municipality shall be rehabilitated with two-sided pavement and elevated bicycle lanes. The design shall ensure good facilitation for pedestrians and cyclists, and bus stops and footpaths shall be upgraded with universally designed systems. The street ́s green character shall also be upgraded through the planting of trees and the establishment of rain beds for local surface water treatment. The project requires the alteration of cables and the establishment of new conveyor roads …
Vis anskaffelsen »
2023-09-07County road 19 to Skoppum railway station, foot and cycle path (Statens vegvesen)
The project includes construction of a new 2,600 m foot/cycle path along county road 19. The
foot/cycle path starts in the west at the new Skoppum station, and in the east it connects with the existing foot/cycle path east of Lørgetunnel. The foot/cycle path will be constructed to be 3.5 metres wide (3.0 metres of asphalt and 0.25 metres of shoulder on each side), and will be located at varying distances from county road 19 depending on the roadside terrain. From Skoppum station and eastwards to …
Vis anskaffelsen »
2023-04-221000920 Bekkestua centre east - general contract (Bærum kommune)
General contract in the municipal urban project 1000920 Bekkestua centre east. The contract roughly covers:
- Work in an urban environment with complicated traffic management
- Site execution with complicated interface with private developer(s)
- Construction of approx. 420 m road with two-sided pavements and green verges with a rain bed, in the established urban streets Gamle Ringeriksvei and Bekkestuveien
- Laying granite cover in the ground for the pavements (approx. 1500m2).
- Asphalt wearing course …
Vis anskaffelsen »
2023-04-06Contract for construction of a foot and cycle bridge Klosterøya-Jernbanebrygga (Skien Kommune)
Skien Municipality will construct a foot and cycle bridge over Bryggevannet between Klosterøya and Jernbanebrygga. The project is a part of the Grenland Urban Package.
The foot and cycle bridge will be constructed with reinforced concrete with a leaf of the bridge over the sailing section constructed of a composite material. The bridge will be approx. 170 metres long and will have a width of 5 metres, with multiple protruding niches for the placement of benches.
The purpose of this invitation to tender …
Vis anskaffelsen » Nevnte leverandører:Consto Anlegg Sør AS
2023-01-182023 - EEA - water and sewage work including development of a foot and cycle path (Askøy kommune)
The contract includes the renewal/alteration of existing water and sewage pipelines, as well as the establishment of a run-off system for surface water. In addition a new foot and cycle path is to be developed. In addition the flood road/stream from Kleppevannet is to be upgraded.
The project goes along the municipal road in Kvernhusdalen, from the subway on county road 562 in the south to the new housing project at Bjørkeligvegen in the north.
The section is approx. 600m and the goal is, amongst other …
Vis anskaffelsen » Nevnte leverandører:Vassbakk & Stol AS
2022-09-13TURNKEY CONTRACT, PEDESTRIAN AND BICYCLE BRIDGE OVER THE PORSGRUNN RIVER (Porsgrunn kommune)
The project is part of Bypakke Grenland and includes the establishment of a pedestrian and bicycle bridge with a movable leaf of the bridge.
The project has been announced previously, but the contest was later cancelled. The project's requirements specification have since been revised in order allow simpler geometry and a broader choice of materials. The total bridge length is approx. 250 metres.
Vis anskaffelsen »
2021-11-26Skien municipality: Contract for construction of a foot and cycle bridge Klosterøya-Jernbanebrygga (Skien Kommune)
Skien Municipality will construct a foot and cycle bridge over Bryggevannet between Klosterøya and Jernbanebrygga. The project is a part of the Grenland Urban Package. The purpose of this invitation to tender is to enter into a contract with a contractor to execute the construction of the foot and cycle bridge. The contracting authority estimates the contract period to be 56 weeks from the start of construction to completion. The contract contains the following options: - District heating for a heated …
Vis anskaffelsen »
2021-01-15County Road 4600 Torvmyrveien – Pedestrian/Cyclist Section: S1D1 m0 – S1D1 m1100 (Rogaland fylkeskommune)
Rogaland County in consultation with Randaberg municipality will by physical measures increase traffic safety for cyclists and pedestrians and improve the urban environment along Fv (County road) 4600 Torvmyrveien. The measures are a part of the Urban Environment initiative (Norwegian: Bymiljøpakken) On the stretch, approx. 520 m with Danish cyclists solution (one-way cycle paths), approx. 300 m with one-sided combined pedestrians and cyclists road and approx. 150 m double-sided cyclists lane and …
Vis anskaffelsen » Nevnte leverandører:Bjelland AS
2020-11-30Contractor for Klosterenga Park Project (Oslo kommune v/Vann- og avløpsetaten)
VAV (the Agency for Water and Sewerage Works) requires resources and technical competence for the execution of the construction of Klosterenga Park. The project is a collaboration project between VAV (the Agency for Water and Sewerage Works), Bymiljøetaten (BYM) (the Agency for Urban Environment) and Kulturetaten (KUL) (Agency for Cultural Affairs) in Oslo municipality.
The project shall develop nature qualities connected to the re-opened stream and the general footpath network through the park. The …
Vis anskaffelsen »
2020-11-30D18 Cycle Path, Kronstad Tunnel (Bybanen Utbygging)
The contract consists of the complete execution of a new cycle path from Møllendal-Kronstad, including the expansion of an existing tunnel, a new culvert and tunnel for a siding for the railway, (not including track and contact line work). The contract requires several disciplines. The work can be described as challenging in a high-density developed area and cultural memorials that must be taken care of.
Vis anskaffelsen » Nevnte leverandører:Veidekke Entreprenør As
2020-11-23Contractor for Klosterenga Park project (Oslo kommune v/Vann- og avløpsetaten)
VAV (the Agency for Water and Wastewater Services) requires resources and technical competence for the execution of the construction of Klosterenga Park. The project is a collaboration project between VAV (the Agency for Water and Wastewater Services), Bymiljøetaten (BYM) (the Agency for Urban Environment) and Kulturetaten (KUL) (Agency for Cultural Affairs) in Oslo Municipality.
The project shall develop nature qualities connected to the re-opened stream and the general footpath network through the …
Vis anskaffelsen »
2019-02-11D11 Sentrum (Bybanen Utbygging)
Contract D11 is a ground work contract for Bybanen [Light Rail] construction phase 4. This procurement comprises ground works on the stretch Sentrum — ADO in central Bergen. The installation is geographically divided into 2 parts. The northern part is in Kaigaten, Christies gate and Rådhusgaten. The souther part is in Lungegårdskaien.
Vis anskaffelsen » Nevnte leverandører:Fyllingenmaskin
2019-01-22D14 Mindemyren (Bybanen Utbygging)
A double light rail track is to be established from Kronstad to Kristianborg, approximately 1,5 km, with the accompanying road network, including infrastructure, a new open concrete water channel and 2 stops.
In addition, concrete constructions must be constructed; a bridge over a new stop at Kristianborg (E39 Fjøsangerveien), a tunnel portal to D15, foot/cycle culvert Minde Alle, with the accompanying main cycle path. The contract includes a lot of temporary infrastructure and traffic …
Vis anskaffelsen »
2018-11-27Heating, Water and Sewage and Green Areas, Kodlidalen F1 (Gjesdal kommune)
Gjesdal Municipality has decided to develop the regulated residential area Kodlidalen area F, plan 1122_201705.
The area consists of roads, footpaths and paths, green areas and play areas, sanitation installations and plots. The plots are split between detached plots and concentrated dense development with elements of low-rise buildings for a total of up to 200 units.
Vis anskaffelsen »
2018-10-15D16 Fyllingsdalen (Bybanen Utbygging)
D16 consists of the ground works for bybanen (light rail) and upgrading of the road system along Hjalmar Brantings vei, and the round-about at Folke Bernadottes veg. It stretches from Oasen's eastern corner to the driveway to Hjalmar Brantings vei 10, 12 and 14 at the old Foto Knudsen building.
The contract primarily comprises the rail's concrete structures that carries the rail from the ground to approx. 1 m above Oasen's main entrance, new road installation, alteration of water and sewage, alteration …
Vis anskaffelsen » Nevnte leverandører:NCC Norge AS
2018-09-11D14 Mindemyren (Bybanen Utbygging)
A double light rail track is to be established from Kronstad to Kristianborg, approx. 1,5 km, with the accompanying road network, including infrastructure, a new open concrete water channel and 2 stops.
In addition, concrete constructions must be constructed; a bridge over a new stop at Kristianborg (E39 Fjøsangerveien), a tunnel portal to D15, foot/cycle culvert Minde Alle, with the accompanying main cycle path. The contract includes a lot of temporary infrastructure and traffic infrastructure.
Contract …
Vis anskaffelsen »
2018-08-17Construction of Jordal sports park (Oslo kommune v/ Bymiljøetaten)
Oslo municipality, c/o the Agency for Urban Environment, hereafter called the contracting authority, invites tenderers to an open tender contest for the procurement of a contractor for the construction of Jordal sports park.
The project will be carried out as a general contract and it is a cooperation project between the Agency for Urban Environment and the Agency for Water and Sewage. The Agency for Urban Environment is the builder and will act as the contract party in the contract.
The project involves …
Vis anskaffelsen » Nevnte leverandører:Skaaret Landskap AS
2018-07-14Footpath Bellevue (Lillesand Kommune)
Lillesand kommune wants the price of establishing a new footpath from the roundabout at Bellevue up to the underpass at FV 20 as drawn on the attached map.
Vis anskaffelsen »
2016-12-12Foot and cycle path along Hvamsmovegen, Nes municipality (Øvre Romerike Innkjøpssamarbeid — ØRIK [Øvre Romerike Procurement Co-operation])
This orientation gives an overview of the project. See the drawings and the description for a full overview.
Road.
A foot and cycle path is planned along Hvamsmovegen (county road 477) in Nes municipality, Akershus county. The foot and cycle path will run from Neskollen residential area in the north to Tomteråsveien in the south, approx. 3 030 m. The foot and cycle path is planned along the western side of Hvamsmovegen, with a 3 metre wide separation from the traffic, which currently has a speed limit …
Vis anskaffelsen »
2016-04-22Flood protection and river promenade along Brumunda part 2 — Contract 2 (Ringsaker kommune (Ringsaker municipality))
Ringsaker municipality, Technical Operations, invites tenderers to a competition for a contract for Contract 2 in the project Flood protection and river promenade along Brumunda part 2.
The contract is for new flood protection and a partial new promenade along a total river stretch of approx. 1 450 m.
See part II — contract documentation, chapter A2 for further information on the project, contract division and the contract work.
The project's start date is 15.8.2016 with completion by 30.4.2018.
NS 8406 …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2015-01-15158-BYM-2014 Stålverksparken and Vestre bekkedrag (Oslo kommune Bymiljøetaten)
Oslo municipality c/o the Agency for Urban Environment, hereafter called the contracting authority, invite tenderers, in cooperation with the Water and Sewage Department, to an open tender contest for the procurement of 158-BYM-2014 Stålverksparken and Vestre bekkedrag. Ensjø is to be developed from a car town with significant elements of industry to a residential town with between 5 000 and 7 000 new residences. The execution and financing of the public area at Ensjø is to be ensured through development …
Vis anskaffelsen » Nevnte leverandører:Steen & Lund AS
2014-05-0252-BYM-2013 Bicycle measures in Tvetenveien from Haugerudveien to Ole Deviks vei (Oslo kommune Bymiljøetaten)
Construction works for a new bicycle path with a pavement, development of a public transport lane and stop upgrades alongs Tvetenveien between Ole Deviks vei and Haugerudveien. The condition shall be better for pedestrians, cyclists and public transport users along Tvetenveien by replacing the current narrow pavement with a separate bicycle path with a pavement, developing a public transport lane and upgrading the stops. The green qualities in the area shall be maintained/upgraded, a pedestrian culvert …
Vis anskaffelsen »
2013-04-26Pedestrian and cycle path bridge, Skansen (Statens vegvesen Region midt)
There shall be built a releasable, swing bridge with truss construction of 98 m for the pedestrians and cyclists over the Skansen run, which shall be linked to the existing pedestrian and cycle path over brattøra and through Skansen park. This entails the creation of about 250 m of footpaths and cycle paths on the east side of the Skansen run, and about 50 m on the west side of the Skansen run. In addition, the build up of an outdoor area between the pedestrian and cycle path and on the east side of …
Vis anskaffelsen » Nevnte leverandører:Implenia As
2011-02-15Preparatory works Gildheim - Grillstad (T-Ø-E-7) (Statens vegvesen Region midt)
This contract is a part of the road project E6 Trondheim - Stjørdal, which is under construction.
The contract's geographical stretch is from Leangen/Gildheim in the west to Grillstad in the east.
The works are a preparatory contract which, amongst other things, includes relaying cables/pipelines, as well as alterations to water and sewage. In addition the contract consists of the construction of some local roads at Leangen including a foot and cycle path as well as the construction of a short foot and …
Vis anskaffelsen » Nevnte leverandører:Bl Entreprenør As