Nyeste anskaffelser der leverandøren Anlegg Øst Entreprenør as nevnes
2023-05-02County road 2300 Environment Street Gran (Statens vegvesen)
County road 2300 environment street Gran is located in Gran Municipality and will be part of county road 2300. The road will functions a diversion road for national road 4 Gran Tunnel.
The development plan was finally adopted on 13 June 2013. The plan is mainly built on the municipal sector plan for the town centre. This involves county road 2300 partially lying in a new route (south) and partially in the previous route for national road 4 (north) through the centre of Gran. The southern, flat part of …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2022-02-16Ground and foundation works for CCS Prosjektet (Fortum Oslo Varme AS)
Fortum Oslo Varmes (FOV) waste-to-energy plant at Klemetsrud emits approximately 15% of the CO2 emissions in Oslo. FOV has entered into an agreement with the Norwegian State as a part of the Longship project for financing of a substantial part of the costs of a carbon capture facility. FOV is now working to finalize the remaining funding to start the project as soon as possible.
This request is for the ground- and foundation work for the carbon capture facility and intermediate storage at Klemetsrud, as …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør asGjermundshaug Anlegg AS
2022-01-04Trøim - Holde bridge, pedestrian and bicycle path Bjøberg, parking lot Hemsedalsfjellet, milling road (Statens vegvesen)
The contract includes three sub-projects:
Pedestrian and bicycle path Trøim – Holde:
A pedestrian-bicycle path shall be constructed from Trøim to the Holde bridge in Hemsedal municipality. This section is approx.1800 meters long and is situated parallel to current RV (National Road) 52.
Bjøberg – Vestland County border:
Bjøberg: The current convoy of motor vehicles' parking space at the Road barrier at Bjøberg shall be widened and expanded. A passable traffic divider and lighting shall also be …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2021-08-03S1 Kanebogen-Margrethe Jørgensens vei, lot Stortanen bridge-MJV (Statens vegvesen)
The project S1 Kanebogen-Margarethe Jørgensens vei is part of the town package Harstad in Troms og Finnmark County. The project is a continuation of the work on improving the main road along national road 83 to Harstad, between Kanebogen and Seljestad. The lot is 2.2 km long. The annual daily traffic count is approx. 17,500.
The contract includes, amongst other things, improvements to two junction areas from T-junctions to roundabouts, the establishment of an access ramp for road traffic, the …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2021-03-22E02 National Road (Norwegian Rv.) 4 Sandvoll-Amundrud (Statens vegvesen)
The assignment includes a pavement widening to the right from Sandvoll to Amundrud, a stretch of approx. 3.8 km on RV4 (National road 4). The assignment consists of repairing access and exit ramps, as well as the construction of a new exit ramp down to FV34 (County road 34) at the intersection Sandvoll. Reconstruction of Stenerud transition bridge of made of concrete. Five structures will be expanded in width, of which three of those are bridges and two are culverts.
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2019-09-24Hakadal Transport and Communications — New Crossing RV4-Elvetangen (Nittedal kommune)
Nittedal municipality shall construct a complete channelized crossing to Hakadal School at RV4 Elvetangen. The crossing shall replace the current T-crossing at Sloraveien/RV4.
The contract works must partly be executed in accordance with approvals from the Norwegian Public Roads Administration, the Eastern Region and partly in accordance with approvals from Nittedal municipality. Nittedal municipality is the builder.
The current comprehensive school must be in use in the construction period. This means …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2018-09-19New Main Pipeline Installations PK2-PK3 (Lillehammer kommune)
Lillehammer municipality shall lay a new main pipeline installations along the beach zone by Mjøsa between PK2 and PK3 in order to increase security. The pipeline installations consist of an approx. 1,3 km pipeline ditch. Parts of this must be founded on friction piles. The new pipeline installations are to be established in a parallel line to the existing pipeline installations.
Go to: https://permalink.mercell.com/91607146.aspx
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2016-04-22Flood protection and river promenade along Brumunda part 2 — Contract 2 (Ringsaker kommune (Ringsaker municipality))
Ringsaker municipality, Technical Operations, invites tenderers to a competition for a contract for Contract 2 in the project Flood protection and river promenade along Brumunda part 2.
The contract is for new flood protection and a partial new promenade along a total river stretch of approx. 1 450 m.
See part II — contract documentation, chapter A2 for further information on the project, contract division and the contract work.
The project's start date is 15.8.2016 with completion by 30.4.2018.
NS 8406 …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as