2025-12-09Competition - County road 862 Tromsø bridge expansion of the cycle path towards the north and renovation and... (Troms fylkeskommune)
Troms County's Infrastructure Department invites tenderers to a tender contest for the following contract work: Bridge no. 19-0511 Tromsø bridge is located in Tromsø municipality, in Tromsfylkeskommune. The bridge spans tromsøsundet and connects the island of Tromsø with the mainland. The bridge is included in county road 862 and is located county road 862 S1D1 m704 to FV862 S1D1 m1721, kilometrering starts at roundabout Tromsdalen.The work to be carried out is the expansion of the hung cycle path …
Vis anskaffelsen »
2025-06-02County road 456/457 Kjoskrysset (Agder fylkeskommune)
Agder County requests tender offers from contractors with the professional, technical and financial basis that are necessary for fulfilment of the contract. Furthermore, experience from equivalent work for the execution of the above mentioned contract work in accordance with the tender documentation. See the detailed provisions in the tender documentation chapter B2. The project includes the construction of a new roundabout with an accompanying foot and cycle bridge. In addition Sagbekken, which is …
Vis anskaffelsen »
2025-04-09Competition county road 862 Tromsø bridge - Expansion of the cycle path towards the north and renovation and... (Troms fylkeskommune)
Troms County's Infrastructure Department invites tenderers to a tender contest for the following contract work: Bridge no. 19-0511 Tromsø bridge is located in Tromsø municipality, in Tromsfylkeskommune. The bridge spans tromsøsundet and connects the island of Tromsø with the mainland. The bridge is included in county road 862 and is located county road 862 S1D1 m704 to FV862 S1D1 m1721, kilometrering starts at roundabout Tromsdalen.The work that shall be carried out is the expansion of the hung cycle …
Vis anskaffelsen »
2025-04-07County road 47 Fagerheim - Førland new road and foot/cycle paths (Rogaland fylkeskommune)
Rogaland County needs to implement the project County Road 47 Fagerheim-Førland - new road and foot/cycle path, which includes the construction of a 1.8 km county road between Fagerheim and Førland in Haugesund municipality, Rogaland county. The main aim of the project is improved accessibility and traffic safety on the county road, as well as to establish a continuous foot and cycle path on the stretch.
Vis anskaffelsen »
2023-04-06Contract for construction of a foot and cycle bridge Klosterøya-Jernbanebrygga (Skien Kommune)
Skien Municipality will construct a foot and cycle bridge over Bryggevannet between Klosterøya and Jernbanebrygga. The project is a part of the Grenland Urban Package.
The foot and cycle bridge will be constructed with reinforced concrete with a leaf of the bridge over the sailing section constructed of a composite material. The bridge will be approx. 170 metres long and will have a width of 5 metres, with multiple protruding niches for the placement of benches.
The purpose of this invitation to tender …
Vis anskaffelsen » Nevnte leverandører:Consto Anlegg Sør AS
2022-09-13TURNKEY CONTRACT, PEDESTRIAN AND BICYCLE BRIDGE OVER THE PORSGRUNN RIVER (Porsgrunn kommune)
The project is part of Bypakke Grenland and includes the establishment of a pedestrian and bicycle bridge with a movable leaf of the bridge.
The project has been announced previously, but the contest was later cancelled. The project's requirements specification have since been revised in order allow simpler geometry and a broader choice of materials. The total bridge length is approx. 250 metres.
Vis anskaffelsen »
2022-05-18Contract NS8405, the project 'Kyststi' Bodø and Water and Sewage system (Bodø kommune)
Bodø municipality shall establish a new coastal path (Norwegian: 'Kyststi') on the section from Bodøsjøen in the west to Mørkvedbukta / Sjøåsan in the east. The total length of the section is approx. 6.5 km. Approx. 1.5 km of the section has already been developed, while this project includes the remaining 5 km. Bodø municipality's goal is that the coastal path is accessible for all, and simultaneously connecting the districts and contributing to Bodø being an attractive city and place to live.
The …
Vis anskaffelsen »
2021-11-26Skien municipality: Contract for construction of a foot and cycle bridge Klosterøya-Jernbanebrygga (Skien Kommune)
Skien Municipality will construct a foot and cycle bridge over Bryggevannet between Klosterøya and Jernbanebrygga. The project is a part of the Grenland Urban Package. The purpose of this invitation to tender is to enter into a contract with a contractor to execute the construction of the foot and cycle bridge. The contracting authority estimates the contract period to be 56 weeks from the start of construction to completion. The contract contains the following options: - District heating for a heated …
Vis anskaffelsen »
2021-05-10Turnkey Contract, Pedestrian and Bicycle Bridge Over the Porsgrunn River (Porsgrunn kommune)
The project is part of Bypakke Grenland and includes the establishment of a pedestrian and bicycle bridge with movable leaf of the bridge A draft project was prepared in 2017 where alternative bridge types and locations were assessed. The recommended system described a two-armed bascule bridge made of concrete with composite leaves. The total bridge length is approx. 250 metres. The project has then been subject to further preparation. Ground surveys have been carried out to provide security for the …
Vis anskaffelsen »
2020-12-18Flood Prevention Givra — Contract E02 — Part 2 Vinstra Park (Nord-Fron kommune)
The contracting authority hereby invites tenderers to participate in a contest for a contract for contract E02 in the project Flood Prevention Givra.
Nord-Fron kommune (Nord-Fron Municipality) will flood/erosion proof the Givra river. Givra is located on the west side of Gudbrandsdalslågen and runs through the Sødorp community, west of central Vinstra, in Innlandet County.
The flood prevention works is divided into three partial stretches and three contracts along the watercourse. This contract (E02) …
Vis anskaffelsen » Nevnte leverandører:ÅGE Haverstad AS
2020-06-24Contract 7001 Culvert under the Railway and New Foot and Cycle Bridge — New Hospital in Drammen (Helse Sør-Øst RHF)
Contract 7001 for the new hospital in Drammen concerns the establishment of a culvert with access ramp for a crossing with overpass for the Drammen line in connection with a new four-lane access road to the hospital. The road must be connected to a new roundabout in Strandveien and the contract work shall be concluded in the existing terrain in front of the current administration buildings at the hospital side of the railway. The culvert and ramps shall be made of reinforced concrete sheet piles in the …
Vis anskaffelsen » Nevnte leverandører:Af Gruppen Norge As
2020-05-28Turnkey Contract Nittedal Station and Passing Loop (Bane NOR SF)
The turnkey contract includes an expansion of the passing loop at Nittedal station and measures for the station area. The project includes the establishment of universally designed platforms, demolition and re-establishment of a transition bridge, facilitation for future development of ERTMS, building new contact line system adapted for AT system. 245 parking lots, 3 bus parking areas and an area for parking bicycles shall also be developed.
Vis anskaffelsen »
2020-02-24The Varde Bridge, Second Publication (Vestland fylkeskommune)
The Varde bridge is a foot and cycle bridge that must be built in fibre reinforced polymer composite. The Varde bridge shall be assembled at Fonnes in Austrheim municipality.
The contracting authority is Vestland County.
The bridge crosses County road No 565.
The free height between the county road and the lower edge of the bridge surface is more than 4,9 m. The bridge has a span of approx. 24 m and a width of approx. 3,5 m.
Further details of the contract are stated in the tender documentation part D …
Vis anskaffelsen » Nevnte leverandører:MSS as
2019-12-20Vardebrua [the Varden Bridge] (Vestland fylkeskommune)
The contract includes project 12-3450 Vardebrua. The bridge is a foot and cycle bridge that must be designed in fibre reinforced polymer composite. The Varden bridge shall be assembled at Fonnes in Austrheim Municipality.
Vestland County is the contracting authority. The bridge spans over county road No 565. The free height between the county road and the lower edge of the bridge's surface is more than 4,9 m. The bridge has a span of approx. 25 m and width of approx. 3,5 m.
Further details of the …
Vis anskaffelsen »
2019-06-03Access Road to Tangenvika Bridge (Bane NOR SF)
The performance contract is a preliminary contract for the double-track development Kleverud-Åkersvika.
The contract consists of 5 main parts:
1) Roundabout and permanent road;
2) Approach road to Furnesodden;
3) Foot and cycle path from Tangen school to Kongspartvegen;
4) Temporary site road;
5) Option for conveying water and sewage.
Vis anskaffelsen » Nevnte leverandører:John Galten AS
2019-05-29Geithus Bridge with Accompanying Plants (Modum kommune)
The municipality shall construct the new Geithus bridge over the Drammen river/the river mouth from Bergsjø including alterations for the roads/new crossing for the new bridge.
The new bridge will run almost parallel, downstream, to the current bridge, and the use of the current Geithus suspension bridge must be altered from the current road bridge to a bridge for pedestrians and cyclists.
Vis anskaffelsen »
2018-08-23Strømme Welfare Centre (Strømmehaven) General Contract (Kristiansand kommune)
General short description. New access road and foot/cycle path. Alteration of water and sewage installations and cables. New district heating supply and alterations to high-voltage installations. New transformer. 42 sheltered accommodation flats, new base for home-based services, new day centre and new communal functions.
Site inspection Strømmeveien 85 Health and Social Centre, 30.8.2018, at 9:00.
Vis anskaffelsen »
2018-05-31County Road 12 Mjølan roundabout (Statens vegvesen)
This contract is for the establishment of a new roundabout in an existing junction, a new foot and cycle path with a bridge over county road 12 and new bus lay-bys on both sides of the road. The road and foot and cycle path are to be adapted to the existing road network.
The work that is to be carried out includes, amongst other things, road, filling, concrete, site electro, electro, asphalt, gardening, railing and kerbstone work. The total length for the project is approx. 370 m.
Vis anskaffelsen » Nevnte leverandører:Bertelsen and Garpestad AS
2016-04-22Flood protection and river promenade along Brumunda part 2 — Contract 2 (Ringsaker kommune (Ringsaker municipality))
Ringsaker municipality, Technical Operations, invites tenderers to a competition for a contract for Contract 2 in the project Flood protection and river promenade along Brumunda part 2.
The contract is for new flood protection and a partial new promenade along a total river stretch of approx. 1 450 m.
See part II — contract documentation, chapter A2 for further information on the project, contract division and the contract work.
The project's start date is 15.8.2016 with completion by 30.4.2018.
NS 8406 …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2015-06-26New dam with a footbridge in the Tangen river (Enebakk kommune (Enebakk municipality))
Enebakk municipality has decided to demolish the old stone coffin dam in the Tangen river between Vågvann and Mjær in Ytre Enebakk and construct a new dam with a footbridge. The existing dam was built in 1995. It is a timber coffin dam filled with local stone. There are major leaks and deformations due to rotten timber. The municipality closed the dam for the general public in 2014. The new dam shall be constructed on the same site as the existing dam, on rock foundations.
Vis anskaffelsen »
2015-04-23UNN HF PET Centre, Turnkey contract with collaboration (Universitetssykehuset Nord-Norge HF (The University Hospital in North Norway))
Universitetssykehuset Nord-Norge HF, hereafter called the Contracting Authority, invites tenderers to an open tender contest without negotiations, as a Turnkey contract with collaboration, regarding the construction of a PET Centre.
The contract includes primarily the following works:
— Barracks and operation of construction site in contract period.
— Base and drainage pipes.
— Complete structure [shell] with concrete, frame, facades/roof.
— Complete HVAC works.
— Complete Electrotechnical works.
— …
Vis anskaffelsen »
2014-11-28E39 Hove — Sandved (Statens vegvesen Region vest)
The E39 shall be expanded from 2 to 4 lanes for a stretch of approx. 1 400 m between Hove and Sandved in Sandnes municipality. County road 325 Jærveien shall be improved with municipal water and sewage installations, expanded from 2 to 4 lanes with the accompanying foot/cycle path for a stretch of approx. 700 m. The Hove junction shall be altered and adapted to national road 13 for a stretch of approx. 700 m including 150 m of the diagonal between Hoveveien and the E39.
Comprehensive noise reduction …
Vis anskaffelsen »
2014-06-30EEA 048-2014 Execution contract, Småpudden bridge (Bergen kommune)
Småpudden foot and cycle path bridge consists of a new bridge over Damsgårdsundet. The bridge is a part of Bergen municipality's lift to the area and it will ensure better access between Løvstakksiden and the centre of Bergen.
The bridge manages, with the help of a z like layout, to combine a free sailing height, incline conditions and landing near the quay front.
Vis anskaffelsen » Nevnte leverandører:NCC Constructions AS
2013-04-26Pedestrian and cycle path bridge, Skansen (Statens vegvesen Region midt)
There shall be built a releasable, swing bridge with truss construction of 98 m for the pedestrians and cyclists over the Skansen run, which shall be linked to the existing pedestrian and cycle path over brattøra and through Skansen park. This entails the creation of about 250 m of footpaths and cycle paths on the east side of the Skansen run, and about 50 m on the west side of the Skansen run. In addition, the build up of an outdoor area between the pedestrian and cycle path and on the east side of …
Vis anskaffelsen » Nevnte leverandører:Implenia As
2013-03-20SKI 01 Preliminary work Langhus - Ski (Jernbaneverket)
Prior to the main work at Ski various preparatory work shall be executed, including, amongst other things, work on the stretch Langhus - Ski. This mainly includes the relaying of Fv 152 Langhusveien with the establishment of a T-junction, and ground reinforcements.
In addition, Roåsbekken shall be relaid through a mountain tunnel including entrance and exit structures. There is an option for casting abutments and the establishment of temporary Baileybru over the existing Østfoldbanen by Roås gård.
For …
Vis anskaffelsen »
2012-05-11K-33 Avløs station (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) would like with this notice to enter into a contract with a contractor that can carry out the contract works K-33 Avløs station. The works will consist of the construction of a new track route with a substructure, new underground station in accordance with the metro standard, new technical building, footbridge over the track route, as well as a new bridge over Avløsveien. In addition the works will include station electro, noise and insight screens and gardening …
Vis anskaffelsen » Nevnte leverandører:Hab Construction As
2011-12-0870-SAM-2011 Tiedemannsparken - foot and cycle bridge over Grenseveien (Bymiljøetaten, Oslo kommune)
Contract work:
— New foot and cycle path bridge over Grenseveien, total width 6,0 m and length 167,5 m. The longest span between the axes is 25.0 m above the Grenseveien. We have planned for an in-situ cast slim bridge. The biggest challenge in the construction of the bridge is the amount of existing high voltage cables close to all foundations. Also, the bridge will not be built using traditional abutments as there must be access to the existing high voltage cables, where the bridge ends,
— Construction …
Vis anskaffelsen » Nevnte leverandører:Oslo Vei As
2011-08-22Gildheim - Grillstad (T-Ø-E-5) (Statens vegvesen Region midt)
The contract is a part of the project E6 Trondheim – Stjørdal, lot Trondheim, a project which consists of several contracts. Contract no. T-Ø-E-5 Gildheim – Grillstad goes along national road 706 in Trondheim municipality from Leangen/Gildheim in the west to Grillstad tunnel in the east.
On the stretch Gildheim-Grillstad, the current national road 706 is to be expanded from two to four lanes. This also involves the construction of several new constructions. In particular the junction area between …
Vis anskaffelsen » Nevnte leverandører:Reinertsen AS v/ Erik Reinertsen
2011-02-07Open air zone E14 and Ring Road North, lot A (Statens vegvesen Region midt)
This contract is included in the road project E6 Trondheim – Stjørdal and is the 6th sub contract to be started on the Stjørdals lot in this project. It is the last part of the stretch Værnes – Havnekrysset.
The contract consists of three construction objects with various geographical locations:
"Dagsone E14", "Driftsvegkulvert" for Avinor and "Ringveg Nord, parsell A".
The total amount included is approx. 400 m of 4 lane road, 950 m foot/cycle path. Futhermore there are 3 roundabouts, 2 railway bridges, …
Vis anskaffelsen » Nevnte leverandører:Grunnarbeid As