2020-12-09KS-1 The Hestnes Tunnel (Bane NOR SF)
KS-1 The Hestnes tunnel. A turnkey contract that includes substructure works from Kleverud to Espa and construction of the Hestnes tunnel.
The works are divided in three lots, further described in Appendix A:
Day zone Kleverud (1.0 km)
The Hestnes tunnel (3.1 km)
Day zone at Espa (0.2 km) and Labbelva railway bridge (approx. 10 m)
The works are expected to start during Q4 2021. The works are planned to be completed during Q1 2026.
Vis anskaffelsen »
2020-07-17KS-2 — Turnkey Contract for Tangenvika Railway Bridge (Bane NOR SF)
The contract is for the construction of a new substructure for a double track railway from Espa at approx. km 96.9 to Furnesbakken at approx. km 99.5, including the construction of Tangenvika railway bridge, plus the adjoining works in the Espa area, as well as a substructure in the Furnesbakken area. The works are scheduled to start in 2021 and completed in 2026.
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2019-11-26KS2 - Turnkey Contract for Tangenvika Railway Bridge (Bane NOR SF)
The contract is for the construction of a new substructure for a double track railway from Espa at approx. 96,9 km to Furnesbakken at approx. 99,5 km, Tangenvika railway bridge, plus the adjoining work in the Espa area, as well as a substructure in the Furnesbakken area.
The work is scheduled to start in 2021 and be completed in 2025. According to the plan, the site must be in operation by the end of 2026.
Vis anskaffelsen »
2018-07-16New Double Track Railway Eidsvoll North — Langset (Bane NOR SF)
The contract is a multi-disciplinary execution contract on the stretch from Eidsvoll North to Langset on the Dovre railway. The contract comprises the following disciplines:
— Bridge constructions,
— Substructure,
— Tracks,
— Contact line,
— Electric power,
— Tele,
— Traction power supply,
— Underwater work.
There is a separate contract for signals on the stretch. In addition, parts of the tele installations will be provided by Bane Nor´s Framework Agreement suppliers. The total length of the stretch …
Vis anskaffelsen »
2018-04-20New double track railway Eidsvoll North — Langset (Bane NOR SF)
The contract is a multi-disciplinary execution contract on the stretch from Eidsvoll North to Langset on the Dovre railway. The contract includes the following disciplines:
— Bridge constructions,
— Substructure,
— Tracks,
— Contact line,
— Electricity,
— Tele,
— Track electricity supply,
— Underwater work.
There is a separate contract for signals on the stretch. In addition, parts of the tele installations will be provided by Bane Nor's framework agreement suppliers.
The total length of the stretch …
Vis anskaffelsen »
2016-06-11Hell-Værnes, E12 Demolition of the existing iron railway bridge (Jernbaneverket (The Norwegian National Rail Administration))
The contract (E12) is part of the project Hell-Værnes which deals with new track system on the stretch from Hell to Værnes, including a new bridge over Stjørdalselva (Stjørdals River). It has been decided to demolish the old bridge when the new bridge has been commissioned. The contract deals with demolition and partial land filling of the old Stjørdalselva bridge. The bridge is a 5 span truss bridge of steel placed on 2 land abutments and 4 pillars of stone and concrete. The total length is 179,5 m …
Vis anskaffelsen » Nevnte leverandører:Af Decom As
2014-07-31Hell-Værns, E4/E5 Substructure and superstructure bridge (Jernbaneverket)
The delivery includes a substructure and superstructure for a new bridge.
Substructure new bridge includes foundations for a new double track railway bridge over Stjørdalselva. Other parts of the bridge will be constructed in another contract, E3, Sheet piling, piling and uncompacted matter works new bridge.
A total of 5 pillars and 2 land abutments shall be constructed. Both the pillars and land abutments are to be constructed from concrete constructions cast on site. There is approx. 260 m between the …
Vis anskaffelsen » Nevnte leverandører:Implenia As
2013-05-03Contract E05 Superstructure 2013 Bjørnfjell passing loop (Jernbaneverket)
In order to increase the capacity on the Ofoten Line, the railway station shall be expanded to a station with 3 long tracks, approx. 1 100 metres, adapted for simultaneous arrivals which can manage minimum 750 metres long trains.
From track 1 just west of the sub passage station on km 40, 13 - 40, 28, with entrance from east, a new sidetrack shall be developed. Establishment of a wide cutting with an eastbound operating road along the south side of the tracks. The existing platform shall be demolished …
Vis anskaffelsen » Nevnte leverandører:Taraldsvik Maskin As
2013-04-24E6 Trondheim - Stjørdal. Bromstadvegen, Falkenborgevegen - Haakon VIIs gate (Statens vegvesen Region midt)
The contract is for the construction of a new road with 4 lanes, cycle path with a pavement on both sides. Supporting walls against the Nordland railway and some ramps for the foot/cycle paths. OPI channels and guidelines for street lighting.
Concrete bridge with drilled piles as foundations. The bridge goes over the Nordland railway. The lot shall be connected to existing roundabouts in Falkenborgvegen and Haakon VII's gate.
Water and sewage works with alterations to the existing network in Haakon VII's …
Vis anskaffelsen »
2013-03-20SKI 01 Preliminary work Langhus - Ski (Jernbaneverket)
Prior to the main work at Ski various preparatory work shall be executed, including, amongst other things, work on the stretch Langhus - Ski. This mainly includes the relaying of Fv 152 Langhusveien with the establishment of a T-junction, and ground reinforcements.
In addition, Roåsbekken shall be relaid through a mountain tunnel including entrance and exit structures. There is an option for casting abutments and the establishment of temporary Baileybru over the existing Østfoldbanen by Roås gård.
For …
Vis anskaffelsen »
2013-03-14County road 254 Tretten railway crossing (Statens vegvesen Region øst)
Construction of a railway bridge, county road, access roads and Mobekk bridge on county road 254.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=287129
Vis anskaffelsen »
2012-01-24Contract works, the Lambertseter line, stage 3 (Brattlikollen - Karlsrud) (Kollektivtransportproduksjon AS)
The following works shall be executed (overview, only):
— Complete upgrading of the stations Brattlikollen and Karlsrud to Metro standard,
— Restoration of 4 concrete structures (2 bridges and 2 pedestrian culverts),
— Demolition, mass replacement, reconstruction of 1 200 metres of double track (8, 650-9, 850 km),
— The existing conductor rail system shall be disassembled and replaced by a new system made of aluminium,
— A new crossing track at Karlsrud shall be established,
— Major parts of the …
Vis anskaffelsen »
2011-04-05New public Halden Harbour - Sauøya case no. 2011/1999 (Halden kommune)
Extension of new public Halden harbour from the present position at Mølen to Sauøya. The project shall be undertaken as a complete enterprise, and the main features consist of new harbour road, railway bridge and railway track in mountain tunnel up to the South side of the island.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=227701.
Vis anskaffelsen »
2011-02-07Open air zone E14 and Ring Road North, lot A (Statens vegvesen Region midt)
This contract is included in the road project E6 Trondheim – Stjørdal and is the 6th sub contract to be started on the Stjørdals lot in this project. It is the last part of the stretch Værnes – Havnekrysset.
The contract consists of three construction objects with various geographical locations:
"Dagsone E14", "Driftsvegkulvert" for Avinor and "Ringveg Nord, parsell A".
The total amount included is approx. 400 m of 4 lane road, 950 m foot/cycle path. Futhermore there are 3 roundabouts, 2 railway bridges, …
Vis anskaffelsen » Nevnte leverandører:Grunnarbeid As