2022-10-04KSÅ-3 Furnesbakken - Stange (Bane NOR SF)
Contract KSÅ-3 consists of a new substructure for double tracks on the section Furnesbakken to Stange. The section is approx. 11.85 km in an open air zone and consists of Tangen station including Tangen railway bridge and 11 structures. In the north of the lot, the route is partly established along the current railway tracks. This means that the tenderer must expect work during periods reserved for maintenance work and in events of total interruption. Contract KSÅ-3 shall be carried out as a turnkey …
Vis anskaffelsen »
2022-05-02SUN 01 - Train parking Drammen and renewal Sundland (Bane NOR SF)
SUN01 Train parking Drammen and renewal Sundland is a multi-disciplinary contract with substructure and railway engineering work at Sunderland. The contract consists of upgrades to railway engineering installations in order to implement ERTMS and capacity increasing measures in the area. In addition a new train parking site is to be established with 7 tracks south-west for Sundland repair yard.
Vis anskaffelsen » Nevnte leverandører:BaneService AS
2022-03-10Train parking facility Tønsberg (Bane NOR SF)
A new train parking facility with 14 spaces divided into 7 tracks, a technical building and a service building, substructure work for connection tracks and sections of a new double track.
Vis anskaffelsen »
2022-02-21Implementation Barkåker - Tønsberg (Bane NOR SF)
The delivery includes the necessary work in the Jarlsberg tunnel and at Tønsberg station. The delivery will mainly include: Alterations to existing platforms as well as the construction of a new platform. Alterations to the track arrangement and contact wire in the station area. Adaptations and renewals of infrastructure in the station area, and to existing interface beyond the station area. Substructure work and railway engineering work.
Vis anskaffelsen » Nevnte leverandører:BaneService AS
2021-12-16Train parking Kongsberg including freight measures, Numedalsbanen [the Numedal Line] (Bane NOR SF)
Three train parking tracks will be built for six train sets at Kongsberg Station, with associated service platforms and facilities. The contract concerns substructure, superstructure and railway engineering works, including catenary and substantial signalling works (NSI 63).
The freight measures will enable conveying of longer freight trains at the Numedal Line and includes measures at Flesberg ‘timber shunting yard’ and minor measures at three level crossings.
Vis anskaffelsen » Nevnte leverandører:Veidekke Entreprenør As
2021-12-09Contract for preparatory work, project Stange north SÅ-24 (Bane NOR SF)
Contract for the continuation of preparatory work, project Stange north SÅ-24. Due to technical problems where the tender deadline was postponed from 7 December 2021, 12:00 until 8 December 2021, 12:00, the contest had to be moved to another area in Tendsign.
Description
In this preparatory contract, approx. 350 m substructure for the line for a new double track is to be replaced. Temporary construction access shall be established to the mass handling plant at Nesten-Skjerden, including the construction …
Vis anskaffelsen » Nevnte leverandører:Gjermundshaug Anlegg AS
2021-03-26Snow Sheds the Bergen Line (Norwegian: Bergensbanen) (Bane NOR SF)
The demolition of the current snow sheds made of wood, partly with external aluminium sheets and the construction of new snow sheds made of steel, mainly for the stretches from Haugastøl to Mjølfjell and Myrdalssvingene to Kjosfossen.
Vis anskaffelsen »
2018-06-08SMS 2A Turnkey contract, substructure (Bane NOR SF)
The project New Double Track Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and one of the lots in the link to Halden (the Østfold railway's western line). A new double track shall be constructed on the stretch, which partly lies in tunnels and partly in the open air, as well as a new railway station at Moss. The new station will be in the open air, approx. 200 m south of the current station. 4 tracks are planned, as well as a branch to the harbour track for Moss harbour.
The …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2018-02-05Turnkey contract substructure SMS 2A (Bane NOR SF)
The project new double Track Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and one of the lots in the link to Halden (the Østfold railway's western line). A new double track shall be constructed on the stretch, which partly lies in tunnels and partly in the open air, as well as a new railway station at Moss. The new station shall be built in the open air, approx. 200 m south of the current station. 4 tracks are planned, as well as a branch to the harbour track for Moss harbour.
The …
Vis anskaffelsen »
2017-03-23SMS 5 Preparatory works for tracks (Bane NOR SF)
Contract SMS 5 Preparatory works for tracks is an execution contract for necessary measures prior to the implementation of the foundation contract and contracts for railway engineering. Contract SMS-5 includes i.a. a temporary road for construction purposes in Mosseskogen, the alteration of two temporary tracks at Moss harbour, alteration of the Water and Sewage system, demolition works and closing of a level crossing.
Vis anskaffelsen » Nevnte leverandører:Leif Grimsrud AS
2016-12-15UBF 33 Foundation works Bergen — Fløen (Jernbaneverket [The Norwegian National Rail Administration])
A tender contest for foundation works for the stretch Bergen — Fløen. The foundation works include the following:
— Rigging and operation.
— Cable channels (approx. 5 000 m).
— Cable trenches and pipe crossings (approx 30 crossings below track).
— Conduit manholes (approx. 8 000 m conduit cables and approx. 40 conduit manholes).
— Manholes (55 units).
— Foundations for electro installations (approx. 25 foundations for AS cabinets, 12 foundations; high voltage, 10 foundations for group cabinets; low …
Vis anskaffelsen »
2016-03-14EPC Railway Systems Oslo S (Jernbaneverket [The Norwegian National Rail Administration])
The work includes the completion of engineering design services, mainly
work drawings and the execution of railway engineering work for the Østfold railway and
the Follo railway from the two altered tunnels at Oslo S, through a new tunnel in Klypen
towards the portal in Ekebergåsen. The track for the incoming Østfold railway continues
through the tunnel constructed by EPC D&B until the South Portal at
the Bekkelag tunnels. The outgoing Østfold railway track comes from the tunnel in Klypen
and will be …
Vis anskaffelsen » Nevnte leverandører:Infranord Norge As
2015-10-14UBF 32 Preparatory works Bergen — Fløen (Jernbaneverket (The Norwegian National Rail Administration))
UBF 32 is a multi-disciplinary contract with elements from all railway engineering disciplines and substructure. The works shall occur on the existing infrastructure or close to this at Bergen station and requires major flexibility and good planning. There will be a limited scope of train free weekends, as well as some buyout time during the daytime in 2 periods (Spring and Autumn). The work will also have to be adapted to ‘white times’ in the graphic route for the stretch. Coordination must be expected …
Vis anskaffelsen » Nevnte leverandører:Norsk Jernbanedrift AS
2014-05-01E01 – Preliminary works (Jernbaneverket)
Rombak station is the middle of 5 stations on the Ofot railway between Narvik and the Swedish border. The station is 20.8 km measured from the Fagernes terminal in Narvik and approx. 21.1 km from the Swedish border. Contract E01 is for parts of the ground work/substructure for an extension to Rombak passing loop on the stretch 20.460 km - 22.200 km. This includes an expansion of the rock cuttings along the western part of the station area including transport the mass. The contract includes using the mass …
Vis anskaffelsen »
2013-12-09Rehabilitation of Hasle rectifier station and the Rommen/Ammerud rectifier station (Sporveien Oslo AS)
The acquisition applies to the rehabilitation of the Hasle rectifier station and the Rommen/Ammerud rectifier station.
The rectifier stations have been in operation over the expected lifetime and it is therefore a need for rehabilitation (of the electrical equipment). There shall also be a need for some structural updates and adaptations for the new equipment that shall be installed.
The following works/deliveries are covered by the acquisition: 12 kV switchgear systems, rectifier transformers, station …
Vis anskaffelsen »
2013-05-06C31 General contract Building (Hordaland fylkeskommune)
Contract C31, General Contract Building, includes construction of workshop building (approx. 8 000 m²), administration building (approx. 4 000 m²) and rectifier building.
Contract C31 also includes establishment of ditches and pipe ways for water and sewage, power lines, telecommunication, signal, traction current, district heating and drainage. Foundations for railroad car hall shall be constructed. In addition the contract includes landscape works, fences, gates, internal roads and parking lots.
NOTE: …
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2013-05-03Værnes stop - foundation and concrete works (Jernbaneverket)
Demolition of existing platform including buildings.
Construction of new temporary road for construction purposes and temporary stop with penthouse situated in the south.
Construction of new side/middle platform with assembly of prefabricated L elements and top elements for a 255 metres long and 10 metres wide middle platform, height 76 cm.
Construction of a watertight trough below sections of the future track 2.
Foundation works for waiting room, bridges, lifts, stairs and escalators.
Foundation works …
Vis anskaffelsen » Nevnte leverandører:Teknobygg Anlegg AS
2013-03-27Contract E04 Substructure Bjørnfjell passing loop (Jernbaneverket)
Because of the introduction of longer trains on the Ofot railway there is a need to extend all the passing loops on the Ofot railway. On the Swedish side 8 of the 12 psasing loops have already been extended, and in 2013 a further 10 of 12 wll be extended. LKAB's chance to ship iron ore to the markets depends on the Ofot railway to Narvik. LKAB warns of increased traffic in the coming years in its project LKAB 37 (37 million tons per annum). The mining company Northland Resources (AS) has decided to use …
Vis anskaffelsen » Nevnte leverandører:TP Maskin Finnsnes As
2013-03-22K-51 Relief base building and substructure contract (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS (KTP) would like to enter into a contract with a contractor that can carry out the contract works K-51 Avløs base building and substructure contract.
The contract is for the construction of a new operational base at Avløs where a new building shall be constructed including HVAC and sanitary installations and electrical installations. The contract also includes a substructure for the track area and outdoor works.
Expected start of works: 1.10.2013.
Expected completion of …
Vis anskaffelsen »
2012-11-29Kongsvinger depositing - under and superstructure work (Jernbaneverket)
The execution of the under and superstructure work and the water supply and sewage.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=274601.
Vis anskaffelsen » Nevnte leverandører:Peab AS
2012-11-27Moss hensetting - Substructure and superstructure work (Jernbaneverket)
Substructure and superstructure work and work with water and sewage shall be carried out.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=273991.
Vis anskaffelsen »
2012-10-05General contract substructure and railway engineering for Lillestrøm Hensetting (Jernbaneverket)
Jernbaneverket shall expand the capacity for stationing trains in the area by Lillestrøm service area. The capacity shall be increased from the current 6 passenger trains to 13 trains with a length of 110 metres. The service area shall be adapted for daily and periodic service and maintenance assignments. In addition Banedivisjonen's area (the operational base) shall be renovated and new tracks established. The contract involves substructure (mass replacement with reinforcement and lower ballast layer, …
Vis anskaffelsen » Nevnte leverandører:Implenia Norge AS
2011-10-28Enterprise Ski 2B Sidings (Jernbaneverket)
The main purpose of Enterprise Ski 2B is to establish sidings for train operators at Ski station. The works comprises foundation works and consists of the following main components:
* establishment of 4 sidings and 2 service ramps for train operators.
* mass removal for parts of main track and siding area.
* mass removal for Eastern line.
Technical building South (TBS).
Train traffic shall operate as normal throughout the construction period. The work is in close proximity to train traffic and the …
Vis anskaffelsen »
2011-08-23Snow cover Hallingskeid (Jernbaneverket)
Subsequent to fire a new snow cover connected to Hallingseid station shall be provided. The length is approx. 260 m. The snow cover shall cover 2 tracks as well as the platform. The preferred building material is steel, but the Awarding Authority is receptive to alternatives, e.g. concrete or laminated wood.
The Hallingseid station is located in the high mountain with a height 1 100 m without access through public road. The construction season without snow is therefore limited. The works are requested to …
Vis anskaffelsen » Nevnte leverandører:Stokke Stål As
2011-08-02Snow cover Hallingskeid (Jernbaneverket)
Subsequent to fire a new snow cover connected to Hallingseid station shall be provided. The length is approx. 260 m. The snow cover shall cover 2 tracks as well as the platform. The preferred building material is steel, but the Awarding Authority is receptive to alternatives, e.g. concrete or laminated wood.
The Hallingseid station is located in the high mountain with a height 1 100 m without access through public road. The construction season without snow is therefore limited. The works are requested to …
Vis anskaffelsen »
2011-05-24FOR-00393 renovation of Sørbyhaugen rectifier station (Kollektivtransportproduksjon AS)
Sørbyhaugen rectifier station shall supply the underground with electricity and it is important as regards the trains on the Lamberseter railway. The plant is old and needs replacing. The technical plant for electricity supply for the underground will be entirely replaced. This includes, among other things, high voltage installations, transformers, rectifiers, 750 VDC plant, control cupboard and low voltage installations. There will also be works with the building, ventilation and fire alarm …
Vis anskaffelsen » Nevnte leverandører:Malthe Winje Power As
2011-04-05New public Halden Harbour - Sauøya case no. 2011/1999 (Halden kommune)
Extension of new public Halden harbour from the present position at Mølen to Sauøya. The project shall be undertaken as a complete enterprise, and the main features consist of new harbour road, railway bridge and railway track in mountain tunnel up to the South side of the island.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=227701.
Vis anskaffelsen »
2011-03-21Trondheim S Platform renewal, enterprise E01 (Jernbaneverket)
The project mainly comprises the following enterprises:
— new accesses to platforms, incl. 3 new lifts,
— existing ramps shall be demolished and replaced with stairs,
— platforms to be lifted up to 76 cm,
— the length of middle platform 1 and 2 down from 350 m to 250 m,
— 125 m of the main platform to be upgraded,
— existing platform roof to be demolished,
— new covered glass shelters,
— new furniture, lighting, snow melting and public information installation,
— universal design - adaptations for the …
Vis anskaffelsen » Nevnte leverandører:Reinertsen As
2011-01-24New double track Oslo – Ski; Contract: SKI 2B depositing track (Jernbaneverket)
The assignment is one of the contracts which shall be implemented for the new double track on the Oslo – Ski section. The entire section is proposed to be divided into several development stages, where the Ski station is the first development stage. Ski station consists of several construction stages. This contract is one of several contracts that are included in construction stage 2.
Start of works is approx. 1.8.2011.
All works shall be completed within 12.12.2012, including clearing and removal of …
Vis anskaffelsen »
2011-01-17Bodø freight depot - substructure (Jernbaneverket)
Substructure for 1 300 m track; 1 new railway track and 2 new intermit tracks.
Laying of lower ballast layer.
Construction of a loading gate, 20 000 m² for 90 tonnes axle load.
Alteration of 200 m access road including retaining wall.
Upgrading of drainage system.
Excavation, collection and filling of masses.
Note: to register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=221302.
Vis anskaffelsen » Nevnte leverandører:H. & O. Bernhardsen As