Leverandør: Teknobygg Anlegg AS
2 arkiverte anskaffelser
Teknobygg Anlegg AS har historisk levert bygge- og anleggsvirksomhet, deler av eller komplette byggekonstruksjoner samt anleggsarbeider og byggearbeid.
Nyeste anskaffelser der leverandøren Teknobygg Anlegg AS nevnes
2013-06-18
960270 Værnes stop - E4 Waiting room and platform roof (Jernbaneverket)
Værnes stop shall be renovated in order to make it more attractive for plane passengers to travel by train to and from Trondheim airport, Værnes. The development is to be coordinated with the ongoing development of the airport. The existing platform and buildings are to be demolished. A new middle platform is to be established, 255 m long, 10 m wide and with a new platform height of 76cm in accordance with the regulations. The existing concrete trough under parts of the platform and under the future new … Vis anskaffelsen »
Værnes stop shall be renovated in order to make it more attractive for plane passengers to travel by train to and from Trondheim airport, Værnes. The development is to be coordinated with the ongoing development of the airport. The existing platform and buildings are to be demolished. A new middle platform is to be established, 255 m long, 10 m wide and with a new platform height of 76cm in accordance with the regulations. The existing concrete trough under parts of the platform and under the future new … Vis anskaffelsen »
2013-05-03
Værnes stop - foundation and concrete works (Jernbaneverket)
Demolition of existing platform including buildings. Construction of new temporary road for construction purposes and temporary stop with penthouse situated in the south. Construction of new side/middle platform with assembly of prefabricated L elements and top elements for a 255 metres long and 10 metres wide middle platform, height 76 cm. Construction of a watertight trough below sections of the future track 2. Foundation works for waiting room, bridges, lifts, stairs and escalators. Foundation works … Vis anskaffelsen »
Demolition of existing platform including buildings. Construction of new temporary road for construction purposes and temporary stop with penthouse situated in the south. Construction of new side/middle platform with assembly of prefabricated L elements and top elements for a 255 metres long and 10 metres wide middle platform, height 76 cm. Construction of a watertight trough below sections of the future track 2. Foundation works for waiting room, bridges, lifts, stairs and escalators. Foundation works … Vis anskaffelsen »