Antall eller omfang
The contract includes the following main quantities:- Construction of temporary quarters, temporary road for construction purposes (120 m) and walkway to temporary platform situated in the east.- Construction of temporary penthouse situated in the east section of the platform.- Construction site fences - approx. 250 m.- Demolition of existing platform elements - length approx. 380 m.- Demolition of existing surface made of pavement blocks, approx. 1 100 m².- Demolition of existing platform surface made of asphalt, approx. 400 m².- Demolition of existing buildings/lift house, bridge, bridge foundation, escalators, technical rooms, lift pit and escalator, foundations, platform roof and penthouse including foundations.- Assembly of platform - L elements (length 2 m), 256 units.- Assembly of platform - top elements (length 4 m), 137 units.- Excavation/transportation of approx. 10 000 m3/mass haulage, approx. 3 000 m³.- Establishment of a watertight concrete trough, approx. 540 m².- Establishment of lift pit made of concrete, approx. 20 m.- Establishment of pits made of concrete for stairs and escalators, approx. 120 m².- Drainage for platform, including storm drains, approx. 320 m.- Frost blanket course below the new track, approx. 705 m³ (track 2).- Sub base below new track, approx. 1 186 m³ (track 2).- Storm water drainage pipe ø160 mm, approx. 240m/ø75 mm approx. 50 m.- Drain pipe ø110 mm, approx. 280 m.- Water pipe ø110 mm, approx. 30 m.- Water pond, 1 unit.- Sand traps/storm water drainage pipe manholes, 5 units.- Wattle hurdle with a height of 1, 8 m, approx. 100 running metres including lockable gate.- Steel sheet pile in connection with mass haulage track 2, 250 m².- Retaining walls, approx. 302 m².- Cable duct/drawing pipes in the platform, approx. 250 m.- Drawing manholes in the platform, approx. 6 units.- Electric pylon foundations in the platform, approx. 7 units.- Foundations for the new platform roof, approx. 38 units (2x19).- Foundations for load bearing columns in the waiting room, approx. 12 units (2x6)- Foundations for benches, approx, 4 units.- Foundations for waste containers, approx. 15 units.- Foundations for sign boards, approx. 4 units.- Sub base platform, approx. 1 660 m.- Base platform, approx. 1 800 m²- Asphalt surface platform, approx. 1 800 m².- Packing/adjustment of track 3, approx. 300 m