Nyeste anskaffelser av bygge- og anleggsarbeid i forbindelse med Veikryss i Norge
2025-02-05Gryllefjord School, ground and infrastructure (Asplan Viak AS)
The procurement includes: - Removal of vegetation cover - Demotion of rock blocks - Rock blasting - Excavation of uncompacted matter - Crushing stones for different fractions - Laying of a new main water supply - Preparation of the site for the construction of a new school - Preparation of a road to an reinforcement layer - Demolition of a detached house.
Vis anskaffelsen »
2024-01-3155-BYM-2023 Operation and maintenance of the road network in the south/east area of Oslo. (Oslo kommune v/ Bymiljøetaten)
Oslo municipality, c/o the Agency for Urban Environment, hereafter called the Contracting Authority, is assigned management responsibility for the municipal road network, including the normed county road network. The contracting authority is responsible for, among other things, long term transport planning, traffic and street use plans, traffic safety and plans for accessibility measures for public transport as well as management and operation of municipal urban areas in Oslo. The urban space includes …
Vis anskaffelsen »
2021-06-07Rv 36 Gvarv — Mannebru. Pedestrians and Bicyclists Lane (Statens vegvesen)
The project includes the construction of a new continuous Pedestrians and bicyclists lane along Rv. (National road) 36 from Gvarv to Mannebru in Mid-Telemark municipality. The length is approx. 4 km. The new pedestrians and bicyclists lane will be connected to the existing pedestrians and bicyclists lane at Mannebru and to an adapted transition in Gvarv.
A crossing of the railway (the Sørland Line) and a crossing of rv.36 have been planned. The crossings shall be carried out in the form of a pedestrians …
Vis anskaffelsen »
2019-12-23National road 555 The Sotra Connection OPS (Statens vegvesen)
The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the 3 best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract …
Vis anskaffelsen » Nevnte leverandører:Sotra Link AS
2019-12-19140-BYM-2019 Asphalt Resurfacing Works in Oslo 2020 (Oslo kommune v/ Bymiljøetaten)
Bymiljøetaten [the Department of Urban Development] is the municipality's professional body in relation to roads, road traffic and public transport on roads. The contracting authority is responsible for the municipal roads network, including the standardised county roads network. As the road administrator, the contracting authority is responsible for follow-up the requirements for measures against noise and air pollution from roads. Cf. the Pollution Control Act. The contracting authority is also …
Vis anskaffelsen » Nevnte leverandører:Vaktmesterkompaniet AS
2019-09-24Hakadal Transport and Communications — New Crossing RV4-Elvetangen (Nittedal kommune)
Nittedal municipality shall construct a complete channelized crossing to Hakadal School at RV4 Elvetangen. The crossing shall replace the current T-crossing at Sloraveien/RV4.
The contract works must partly be executed in accordance with approvals from the Norwegian Public Roads Administration, the Eastern Region and partly in accordance with approvals from Nittedal municipality. Nittedal municipality is the builder.
The current comprehensive school must be in use in the construction period. This means …
Vis anskaffelsen » Nevnte leverandører:Anlegg Øst Entreprenør as
2019-05-29Geithus Bridge with Accompanying Plants (Modum kommune)
The municipality shall construct the new Geithus bridge over the Drammen river/the river mouth from Bergsjø including alterations for the roads/new crossing for the new bridge.
The new bridge will run almost parallel, downstream, to the current bridge, and the use of the current Geithus suspension bridge must be altered from the current road bridge to a bridge for pedestrians and cyclists.
Vis anskaffelsen »
2016-06-25Diversion road Brusand (Norconsult AS)
The extent of the work is mainly to expand county road 44 Brusand with a left wing lane and the construction of a new diversion road to the north west of Brusand.
In connection with this work, the existing culvert under county road 44 shall be demolished and reconstructed with a height and width that fulfils the current requirements. As the bottom of the culvert will be lowered compared to the current level, the adjoining ramps must be adjusted accordingly.
A new foot and cycle path shall be developed by …
Vis anskaffelsen »
2016-03-31A new exit road Storøyne (Gol kommune (Gol municipality))
Gol municipality wishes to construct a new access road to the centre of Gol. The access road shall be from Rv7 (National Road 7). A roundabout on Rv7, a culvert under Rv 7, as well as an access road to the centre of Gol shall be constructed. The access road will be across the Hallingdal River, and a bridge over the river shall be constructed. The connection to the Sentrumsveien will be an oval roundabout. The access road shall be constructed with a 1-sided pavement and with accesses to neighbouring sites/areas.
Vis anskaffelsen » Nevnte leverandører:T. Engene
2016-02-01Stakkevollveien TP3 — Main Contract (Tromsø Kommune, Eiendom (Tromsø Municipality, Properties))
Through Tromsøpakke 3 — Stakkevollvegen, Tromsø kommune shall expand existing roads as part of it's initiative regarding public transport and cyclists and pedestrians. The main objection of the expansion is to establish public transport lanes, cycle lanes and foot paths along Stakkevollveggen from the intersection toward Johan Hensens gate at the roundabout in Hansjordnesbukta in the south, to the crossover/Erling Kjeldsnes road in the north.
See the tender documentation point 8.1 for further information.
Vis anskaffelsen »
2014-04-28Two way tram in Prinsens gate (Oslo kommune Bymiljøetaten)
The aim of the assignment is to establish a 2 way tram in Prinsens gate as well as give the street an aesthetic lift from the junction Fred Olsens gate to Nedre Vollgate (over Wessels plass). In addition Tollbugata is to be established as a 2 way bus street.
The quarter is characterised by heavy traffic and a street network that is overloaded. Prinsensgate and Tollbugata are currently 1 way streets that have buses and trams. These streets take most the public transport through the centre. The streets are …
Vis anskaffelsen » Nevnte leverandører:Torpol Norge
2013-03-20SKI 01 Preliminary work Langhus - Ski (Jernbaneverket)
Prior to the main work at Ski various preparatory work shall be executed, including, amongst other things, work on the stretch Langhus - Ski. This mainly includes the relaying of Fv 152 Langhusveien with the establishment of a T-junction, and ground reinforcements.
In addition, Roåsbekken shall be relaid through a mountain tunnel including entrance and exit structures. There is an option for casting abutments and the establishment of temporary Baileybru over the existing Østfoldbanen by Roås gård.
For …
Vis anskaffelsen »
2011-06-27Fv.541 Stokkabekken-Rubbestadneset (Statens vegvesen Region vest)
The project is a turnkey contract and consists of the section between Stokkabekken and Katthola at Rubbestadneset in Bømlo in Hordaland. The section is planned and divided into 2 development plans: Rv 541 Stokkabekken - Innvær and Rv 541 Innvær - Katthola, jointly profile 0 - 2 945. The turnkey contract comprises both plans.
The new road from south of Stokkabekken to Katthola runs mainly through virgin terrain over thin marsh and moorland area north west of the current road. Further, the road runs …
Vis anskaffelsen »
2011-02-24Torshov – replacement of tracks, water and sewage works, etc (Kollektivtransportproduksjon AS)
The works shall be executed at Torshov in Oslo. More exactly on the stretch from Birkelunden, 1, 9 km, to Åsengata, 3, 2 km (total 1, 3 km track). See the map attached the tender notice in Doffin.
The works will include excavation, casting of concrete slab, construction of tracks and asphalt spreading.
The stretch contains a number of track technical derogations, including bottom lying track which result in reduced speed at the stretch.
Upgrading of the remaining streets (in cooperation with Oslo …
Vis anskaffelsen »