2021-04-19   Strømskinneanlegg T-bane/Third rail system Oslo Metro (Sporveien AS)
The purpose of the procurement process is to cover the procuring entity’s need for third rail components for the Oslo Metro network. As most of the purchases and planned maintenance/overhaul projects are financed by Public Authorities, it is a bit difficult to be too specific of the amount to be bought over the period of this frame-agreement, therefore it could be more than expected as of today. Due to the Covid-19 situation, the budget plans are a bit delayed so there will be earlier volumes following … Vis anskaffelsen »
2020-09-28   Contact-wire and Components for Trolleybus and Bybanen, Assembly- and Engineering Services (Bybanen AS)
Bybanen AS wants to enter into a framework agreement with a supplier for the procurement of contact wire -and components and also services for assembly, and engineering related to trolleybus-and bybanen infrastructure. In addition, the Supplier must be able to offer Bybanen AS personnel to attend and observe in assignments for training purposes. Reference is also made to the attached specifications, Appendix 1 Customer specification. Vis anskaffelsen »
2020-04-02   New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo metro and Oslo tramway, as well as owning several operating subsidiaries. Sporveien will through the project — New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo metro network, including depots, the new line from Majorstuen to Fornebu ('Fornebubanen') and equipping and modifying the rolling stock. The main objective … Vis anskaffelsen »
Nevnte leverandører: Siemens Mobility AS Siemens Mobility GmbH
2019-11-26   New Signalling System CBTC (Sporveien AS)
Sporveien AS is a municipal owned public transport operator of Oslo, Norway that operates and maintains Oslo Metro and Oslo Tramway, as well as owning several operating subsidiaries. Sporveien will through the project New Signalling System CBTC implement a new signalling system and an operation management and supervision system for the complete Oslo Metro network, including depots, the new line from Majorstuen to Fornebu (‘Fornebubanen’) and equipping and modifying the rolling stock. The main objective … Vis anskaffelsen »
2019-09-11   Signal/Tele, Operational and Maintenance Services (Bybanen AS)
The contract will cover fault corrections as well as ongoing change and maintenance work on the infrastructure that Bybanen AS is responsible for, on infrastructure for the light rail and trolley buses, within signal, tele, IT, and electro disciplines. Vis anskaffelsen »
2017-12-28   Framework agreement for technical consultancy services, modifications and repairs (Norske TOG AS)
The objective of the procurement is to combine Norske Tog’s purchase of technical consultancy services and modifications and repair assignments in several disciplines. The framework agreements shall ensure Norske Tog quick access to capacity and specialised competence in technical consultancy and performance of modifications and repairs of the entire train stock. The agreements shall facilitate long-term and develop collaboration between Norske Tog and the service providers. Vis anskaffelsen »
2017-12-04   Procurement of ISA, AsBo and NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project “ERTMS National Imolementation“ with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with one supplier on the following; — Independent safety assessor (ISA), — Assessment body CSM-RA (AsBo), — Notified body TSI CCS (NoBo). The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver. Vis anskaffelsen »
Nevnte leverandører: Certifer Sintef
2017-03-20   ISA, AsBo og NoBo services for ERTMS National Implementation (Bane NOR SF)
Bane NOR's project 'ERTMS National Imolementation' with the subprojects ‘Trackside', ‘Onboard’ and ‘Traffic Management System’ will enter into an Agreement with 1 suppler on the following: — Independent safety assessor (ISA); — Assessment body CSM-RA (AsBo); — Notified body TSI CCS (NoBo). The suppliers of the signalling system, the traffic management system and the onboard system will enter into their own ISA, AsBo og NoBo agreements for the systems they deliver. Vis anskaffelsen »
2016-12-13   Assistance in establishing of new traffic control centers (Jernbaneverket)
See information on competition in the CTM. Vis anskaffelsen »
Nevnte leverandører: Institutt for Energiteknikk
2016-06-20   E01 Engineering, procurement and construction KL/AT (Jernbaneverket (The Norwegian National Rail Administration))
Interaction contract: Engineering, procurement and construction, Contact Line with AT (Auto Transformer), including an option for the preparation of working plans with the transferred consultant, as well as option for the execution. Vis anskaffelsen »
Nevnte leverandører: BaneService AS
2016-03-23   Procurement of a TMS (Jernbaneverket (The Norwegian National Rail Administration))
Jernbaneverket is planning the procurement of a new Traffic Management System (TMS) for operating the Norwegian railway network. This is a part of the renewal of the signalling system based on the ERTMS (European Rail Traffic Management System) standard. The goal is to renew the existing signalling systems on the railway network within 2030. The renewal includes Trackside Systems, On-board equipment and introduction of TMS. Procurement of a new TMS includes: — Delivery of one TMS operating and … Vis anskaffelsen »
Nevnte leverandører: Thales Commercial Norway AS
2016-03-22   Procurement of an on-board system (Jernbaneverket (The Norwegian National Rail Administration))
The Norwegian National Rail Administration plans to procure a new on-board system. This is a part of the renewal of the entire signalling system based on the ERTMS standard (joint European signalling system for railways). The objective is to renew the signalling installations on the railway network by 2030. The renewal includes an external signalling system, on-board equipment in trains and a traffic management system. Vis anskaffelsen »
2016-03-14   EPC Railway Systems Oslo S (Jernbaneverket [The Norwegian National Rail Administration])
The work includes the completion of engineering design services, mainly work drawings and the execution of railway engineering work for the Østfold railway and the Follo railway from the two altered tunnels at Oslo S, through a new tunnel in Klypen towards the portal in Ekebergåsen. The track for the incoming Østfold railway continues through the tunnel constructed by EPC D&B until the South Portal at the Bekkelag tunnels. The outgoing Østfold railway track comes from the tunnel in Klypen and will be … Vis anskaffelsen »
Nevnte leverandører: Infranord Norge As
2014-11-26   UFP-12 Electric power (Jernbaneverket)
The project comprises building of 22.7 km of new railway track between Larvik and Porsgrunn. The terrain is very hilly, which leads to a large number of bridges and tunnels. Completion is planned for September 2018. A Contractor will now be acquired to build a complete electric supply system for the project with high and low voltage. Some own designing will be included in the delivery. The electric power contract is comprised of 21 technical rooms, with 24 kV switching stations, transformers for 22/0.69 … Vis anskaffelsen »
Nevnte leverandører: Caverion Norge AS
2014-06-18   UFP-14 Emergency lighting (Jernbaneverket)
The Norwegian Railway Administration is constructing a new double track railway on the stretch Farriseidet - Porsgrunn. The stretch is 22.7 km and consists of approx. 2/3 tunnel. Emergency lighting shall be assembled in the tunnels in/on handrails as well as lit information signs with fittings. The emergency lighting and information signs shall be assembled in the main tunnel and escape tunnels. The contract is for the delivery of this material. Vis anskaffelsen »
Nevnte leverandører: Swarco Norge
2013-12-09   Rehabilitation of Hasle rectifier station and the Rommen/Ammerud rectifier station (Sporveien Oslo AS)
The acquisition applies to the rehabilitation of the Hasle rectifier station and the Rommen/Ammerud rectifier station. The rectifier stations have been in operation over the expected lifetime and it is therefore a need for rehabilitation (of the electrical equipment). There shall also be a need for some structural updates and adaptations for the new equipment that shall be installed. The following works/deliveries are covered by the acquisition: 12 kV switchgear systems, rectifier transformers, station … Vis anskaffelsen »
2013-10-17   FOR-00680 Track switching point Prinsens gt (Sporveien Oslo AS)
Sporveien Oslo AS shall purchase engines with control and heat exchange for trams for Prinsens gate in Oslo. This includes, amongst other things, the following: 4 hydraulic point mechanisms for switches, 4 electrical point mechanisms for switches, earth boxes, cables, track circuits, mass detectors, contact boxes, signals, points control, heat exchange for 8 switches mounted in cabinets, installation and commissioning. Note: To register your interest in this notice and obtain any additional information … Vis anskaffelsen »
2013-09-26   Points heating for tram and underground (Sporveien Oslo AS)
Purchase of points heating for tram and underground, including installation. Option for purchase of system for monitoring/controlling points heating for tram. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at: http://www.doffin.no/Search/Search_Switch.aspx?ID=306206 Vis anskaffelsen »
2013-09-19   FOR-00668 Points control tram (Sporveien Oslo AS)
Sporveien Oslo AS shall purchase engines with control and points heat for trams. This includes, amongst other things: six hydraulic points mechanisms, (with an option for a further two), earth boxes, cables, track circuits, mass detectors, contact boxes, signals, points control, points heat for eight points assembled in a cupboard, assembly and commissioning. Documentation of management, operation and maintenance and marking of all components. Note: To register your interest in this notice and obtain any … Vis anskaffelsen »
2013-08-29   201201816 - UHN-10 Emergency lighting (Jernbaneverket)
Emergency lighting tunnel In order to receive further infomation on this competition, including any additions and/or clarifications you have to register your interest in participating in the competition on the following website: https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=112197&B=JERNBANEVERKET Vis anskaffelsen »
Nevnte leverandører: Swarco Norge AS
2013-07-02   Points machine for points for tram rails - tram and town rails (Sporveien Oslo AS)
Point machine for points - tram rails for in the Oslo area. To be attached to the application: System drawings of points including point machines. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=298274. Vis anskaffelsen »
2013-05-13   Point Machines (aka point motor, switch machine, switch motor) for points on Metro/underground (Sporveien Oslo AS)
Point machines for points on the Oslo region Metro/Underground. For flange rail for the Oslo region. Underground and suburb railway. Note that Kollektivtransportproduksjon AS has been renamed to Sporveien Oslo AS NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=292876. Vis anskaffelsen »
2013-04-17   UHN 11 - Railway engineering (Jernbaneverket)
This qualification is for a contract for railway engineering professions in the project Holm - Nykirke (UHN). The Holm - Nykirke lot is 14,2km of which 12,3km consists of a tunnel. Holmestrand station is in this tunnel in a rock hall and 11 escape tunnels will also be constructed. There is a lot of activity in and outside the tunnels and tenderers must reckon on extensive cooperation with other actors in the project. The estimated construction start is February 2014. A contract will be signed until … Vis anskaffelsen »
2012-12-17   Kongsvinger standby tracks: Electro works (Jernbaneverket)
Electro works at Kongsvinger railway station. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=276052 Vis anskaffelsen »
2012-12-17   Kongsvinger standby tracks: overhead line works (Jernbaneverket)
Overhead line works at Kongsvinger railway station. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=276099 Vis anskaffelsen »
2012-03-16   Hire of track and signal installers (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS has a need to hire signal and track installers. The signal installers will be used in the signal and tele/automation department. The track installers will be used in the track department (underground and tram). Tenders can be given for lots. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=251452. Vis anskaffelsen »
2012-02-07   Framework agreement conductor rail system (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS, henceforth referred to as the Awarding Authority, invites to a tender contest with negotiations with prequalified tenderers. The tender contest is in accordance with the Supply Act and the objective is to enter into a framework agreement for delivery of a conductor rail system with steel and aluminium rail, as well as spare parts for the existing system. Option for installation. The existing system comprises of conductor rail made of steel in STR40, type 512. The Awarding … Vis anskaffelsen »
2011-11-04   C43 EPCI Signal Tele - Bybanen (Hordaland Fylkeskommune v/Bybanen Utbygging)
This prequalification regards EPCI contract for signal and telecommunication systems for Bybanen's phase 3 from Lagunen to Bergen airport Flesland. Also included is an operational control center (OCC), depot and workshop at Flesland, as well as options for future contruction phases 4-6. The procurement is conducted as a competitive dialogue. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at … Vis anskaffelsen »
Nevnte leverandører: EFACEC Engenharias e Sistemas SA
2011-11-03   C43 EPCI signal tele (Hordaland Fylkeskommune v/Bybanen Utbygging)
This prequalification regards EPCI contract for signal and telecommunication systems for Bybanen's phase 3 from Lagunen to Bergen airport Flesland. Also included is an operational control center (OCC), depot and workshop at Flesland, as well as options for future construction phases 4-6. The procurement is conducted as a competitive dialogue. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at … Vis anskaffelsen »
2011-10-05   K-37 Supply of traction current (Kollektivtransportproduksjon AS)
Through this publication Kollektivtransportproduksjon AS (KTP) wishes to meet their need for K-37 Supply of traction current at Kolsåsbanen, km 10,73 to 16,40. The works will consist of establishment of a new rectifier station. At Gjønnes, (km 10,73 to 11,42). Estimated scope is approx. 12 000 000 NOK. The works consist of high tension switchgear, transformers, rectifiers, 750 VDC switchgear, control systems and low-voltage plant. The works also include cabling and connection to power rails and … Vis anskaffelsen »
Nevnte leverandører: Siemens AS
2011-05-24   FOR-00393 renovation of Sørbyhaugen rectifier station (Kollektivtransportproduksjon AS)
Sørbyhaugen rectifier station shall supply the underground with electricity and it is important as regards the trains on the Lamberseter railway. The plant is old and needs replacing. The technical plant for electricity supply for the underground will be entirely replaced. This includes, among other things, high voltage installations, transformers, rectifiers, 750 VDC plant, control cupboard and low voltage installations. There will also be works with the building, ventilation and fire alarm … Vis anskaffelsen »
Nevnte leverandører: Malthe Winje Power As
2011-03-21   Trondheim S Platform renewal, enterprise E01 (Jernbaneverket)
The project mainly comprises the following enterprises: — new accesses to platforms, incl. 3 new lifts, — existing ramps shall be demolished and replaced with stairs, — platforms to be lifted up to 76 cm, — the length of middle platform 1 and 2 down from 350 m to 250 m, — 125 m of the main platform to be upgraded, — existing platform roof to be demolished, — new covered glass shelters, — new furniture, lighting, snow melting and public information installation, — universal design - adaptations for the … Vis anskaffelsen »
Nevnte leverandører: Reinertsen As