Bybanen Utbygging needs a 3D/BIM coordinator for construction stage 4.
Assignments for the 3D/BIM coordinator:
— Be a central support for the follow-up of the ICT handbook as well as 3D/BIM models in the engineering design phase and the execution phase.
— Assist the contracting authority in the evaluation of the presented model systems from the supplier.
— When required, participate in ICT meetings with the supplier.
— Function as the builder's professional ICT manager.
— See to the contract's (Sentrum — …
Vis anskaffelsen »
2015-03-18C0010 — Finishing work claims (Hordaland Fylkeskommune v/Bybanen Utbygging)
Bybanen Utbygging shall enter into a framework agreement with one — 1 — contractor who shall carry out minor work connected to traffic safety measures, improving existing solutions, supporting work for technical contractors and other work of a similar nature on the stretch between the centre of Bergen and Lagunen (Construction stages 1 and 2). In addition there will be an option to extend the framework agreement for 1 + 1 year for further and equivalent work on the entire stretch from the centre of …
Vis anskaffelsen » Nevnte leverandører:Løvaas Maskin AS
2014-12-16D04 — Ground surveys (Hordaland Fylkeskommune v/Bybanen Utbygging)
The ground surveys along the route shall form the basis for:
— assessing solutions and preparing an area development plan,
— preparing a technical preliminary project,
— engineering design services for and the construction of the Light Rail from the centre to Fyllingsdalen.
The survey's extent and degree of detail must be adapted to the phase the project is in and carried out in several stages, i.e. detailed as alternatives/variants are withdrawn, solutions will be detailed and the work area …
Vis anskaffelsen »
2014-12-16D05 — Laser scanning, benchmarks and levelling (Hordaland Fylkeskommune v/Bybanen Utbygging)
The surveys along the route shall form the basis for:
— assessing solutions and preparing an area development plan,
— preparing a technical preliminary project,
— engineering design services for and the construction of the Light Rail from the centre to Fyllingsdalen.
The extent and degree of detail must be adapted to the phase that the project is in and carried out in several stages, i.e. detailed as the alternatives/variants are taken out, solutions get more detailed and the area of work …
Vis anskaffelsen »
2014-10-31Development and engineering design services construction stage 4 (Hordaland Fylkeskommune v/Bybanen Utbygging)
In order to ensure the earliest possible realisation of the next construction stage, a decision has been made to coordinate the work with the development plan and the detailed engineering design services as well as procuring consultants at the same time. This procurement is for the next construction stage of the Light Rail and will apply for the planning and engineering design services for the stretch from the centre to Åsane or from the centre to Fyllingsdalen. This will be clarified in the …
Vis anskaffelsen » Nevnte leverandører:Sweco Norge As
2012-10-26C52 Switches and Crossings - Bybanen Utbygging (Hordaland Fylkeskommune v/Bybanen Utbygging)
The procurement encompasses switches & crossings and related deliveries for construction stage 3 of the Bergen Light Rail. Deliveries for construction stage 3 will include switches & crossings on both track and in a depot to be built as part of this construction stage 3. The deliveries onsite will occur between May and October of 2014.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=270608.
Vis anskaffelsen »
2011-11-04C43 EPCI Signal Tele - Bybanen (Hordaland Fylkeskommune v/Bybanen Utbygging)
This prequalification regards EPCI contract for signal and telecommunication systems for Bybanen's phase 3 from Lagunen to Bergen airport Flesland. Also included is an operational control center (OCC), depot and workshop at Flesland, as well as options for future contruction phases 4-6.
The procurement is conducted as a competitive dialogue.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at …
Vis anskaffelsen » Nevnte leverandører:EFACEC Engenharias e Sistemas SA
2011-11-03C43 EPCI signal tele (Hordaland Fylkeskommune v/Bybanen Utbygging)
This prequalification regards EPCI contract for signal and telecommunication systems for Bybanen's phase 3 from Lagunen to Bergen airport Flesland. Also included is an operational control center (OCC), depot and workshop at Flesland, as well as options for future construction phases 4-6.
The procurement is conducted as a competitive dialogue.
Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at …
Vis anskaffelsen »
2011-09-15CO2 engineering design of workshop and depot for Bybanen (City Railroad) (Hordaland Fylkeskommune v/Bybanen Utbygging)
The prequalification involves preparation of detailed plan and construction schedule for workshop and depot for the City Railroad (Bybanen) in Bergen.
In connection with Bybanen's first construction stage, a workshop/depot was built at Kronstad. The workshop/depot was originally planned to be used for the first construction stage only, and is planned as a provisional workshop.
The workshop at Kronstad shall gradually have limited facilities for maintaining and operating seventeen 32 metres long Variobahn …
Vis anskaffelsen » Nevnte leverandører:Mott Macdonald Ireland Ltd
2011-06-23Follow-up work (Hordaland Fylkeskommune v/Bybanen Utbygging)
The assignment comprises road safety measures and other follow-up work for construction stage 1 for Bybanen's section between Sentrum and Nesttun. The equivalent measures for construction stage II from Nesttun to Rådal can be an option at a later time. Bybanen Utbygging together with Bybanen AS has obtained a report of the points on the above section, detailing potential dangers for Bybanen as well as other traffic.
The primary purpose of the procurement is to establish a more extensive safety on the …
Vis anskaffelsen » Nevnte leverandører:Mesta Drift AS
2011-04-28Ground investigation for Bybanen in Bergen construction stage 3 (Hordaland Fylkeskommune v/Bybanen Utbygging)
Ground investigation in connection with construction planning and extension of Bybanen in Bergen. The investigations comprises the route from Rådal to Bergen Airport Flesland. Approximately 7,1 km double track route. This includes approx. 1 km of road area, approx. 2,3 km of a seperate route in daylight, approx. 2,8 km in tunnel and just below 1 km in culvert.
The work includes the preparation of drilling plan, registering of visible loose masses over rock, environmental sampling of these loose masses, …
Vis anskaffelsen » Nevnte leverandører:Multiconsult AS
2011-03-22C01 detailed design of the light rail construction stage 3 of Bybanen, Rådal - Flesland (Hordaland Fylkeskommune v/Bybanen Utbygging)
This notice covers the procurement of engineering design for the third construction stage of Bybanen. It includes the preparation of detailed plans, procurement documents and construction plans for the third construction stage of the light rail project and follow-up activities during the of construction and warranty periods.
The commission comprises all the planning and design works from Rådal to Bergen Airport Flesland. It includes preparatory work, the dividing and detailing of substructure works and …
Vis anskaffelsen » Nevnte leverandører:Mott Macdonald Ireland Ltd
2011-03-11Construction of gateway/reconstruction of garden for the city railroad in Bergen,A30203 Paradishøgda (Hordaland Fylkeskommune v/Bybanen Utbygging)
The City railroad Development is now in process with construction stage 2 between Nesttun and Rådal. However, some remaining works from construction stage 1 must be completed.
Contract A30203 includes construction of a new gateway from Paradishøyden to Sandbrekkveien road and reconstruction of a garden for Paradishøyden 2.
The works shall be completed during summer 2011. The works are expected to be initiated in week 21/2011. The works are expected to be completed in week 37/2011. Pause in works due to …
Vis anskaffelsen » Nevnte leverandører:Svein Boasson As