Nyeste anskaffelser av fjerning av jordsmonn i Norge
2026-02-03Framework agreement - Playground equipment, exercising park equipment and accompanying construction services. (Sandnes kommune)
The contracting authority needs to enter into a framework agreement for a turnkey contract for playground equipment, fitness park equipment, establishment of playgrounds and training parks, as well as associated construction services. In the requested assignments, the tenderer shall, among other things, take responsibility for, and to a large degree contribute to, find good solutions. The contracting authority will have a mix of execution models for the call-offs. In some call-offs, the tenderer ́s …
Vis anskaffelsen »
2022-08-24Foundation work Seasonal storage Furuset (Hafslund Oslo Celsio AS)
The foundation works include establishing the area for energy wells for Hafslund Oslo Celsio AS (Celsio)'s planned geoenergy seasonal storage at Furuset in Oslo. The area needs to be excavated, masses need to be removed and the area needs to be carefully planned after the well park has been established. The construction area needs to be prepared at the same time as other projects and with the desired masses etc. and in accordance with the builder's requirements.
Vis anskaffelsen »
2022-07-062022-81 K651 Spjelkavik Arena, preparatory work (Møre og Romsdal fylkeskommune)
About the assignment
The contracting authority calls for tenders for a contractor for preparatory work for Project K651 Spjelkavik Arena in Ålesund municipality. The project shall be carried out as an execution contract for road, infrastructure, and groundwork. The contract will be based on NS 8405.
The work includes i.a.:
- The construction of a new footpath along Vasstrandvegen and Myrdalsvegen
- The establishment of infrastructure for the Spjelkavik Arena site
- Mass replacement and removal of …
Vis anskaffelsen »
2021-05-15OPS E10/rv.85 (National Road 85) Tjeldsund-Gullesfjordbotn-Langvassbukt-Procurement (Statens vegvesen)
The facility includes a total of 82 km two lane road, divided into:
• 35 km new road in the existing route;
• 27 km tunnels;
• 20 km road in new route.
The facility includes several smaller bridges, public transport measures, rest areas, 24-hour rest areas, exit car parks, operational underpasses, foot and bicycle paths, collection roads, connections to existing roads, new crossing solutions and remediation (reduction) of private exits. Upgrading of unloaded road network Kåringen – Kanstad, and …
Vis anskaffelsen » Nevnte leverandører:Skanska Norge As
2020-07-06Ground Works and Foundations — the CCS Project (Fortum Oslo Varme AS)
Fortum Oslo Varme’s (FOV) energy recycling plant at Klemetsrud is responsible for approx. 14 % of Oslo's CO2 emissions, and FOV is participating in the competition for state support for construction and operation of a CO2 catchment plant in order to reduce the city's emissions.
This request is for ground works and foundations for a carbon catchment plant and temporary storage at Klemetsrud as well as a terminal at Oslo Port (Kneppeskjær). FOV owns the plant and will the contracting party for the works. …
Vis anskaffelsen »
2020-05-15EEA 059-2019 Clearnace of Slettebakken Waste Disposal Site (Bergen kommune)
Bergen Municipality will clear the old landfill site at Slettebakken. The amount of waste and bog/uncompacted matter mixed with the waste is estimated to be approx. 175 000 m. The estimate is somewhat uncertain as there have been few bucket samples in some parts of the landfill site (AsplanViak, Volume Calculations Slettebakken Waste Disposal Site, 2007).
A turnkey contract will be established with interaction with one contractor.
Click here https://permalink.mercell.com/115148230.aspx
Vis anskaffelsen »
2020-05-13New Fjelltun School, Contract 3 Groundwork (Strand kommune)
New Fjelltun School, construction stage 1. Contract 3 groundwork.
New Fjelltun School and construction stage 1 of the outside area is to be constructed in accordance with the preliminary project and within the cost limit of NOK 330 million.
The new school must be ready for the start of the school year in 2022.
The groundwork includes, amongst other things:
— excavation of the building pit,
— ditches for water and sewage and cables,
— bus stop,
— road and foot/cycle path,
— car park.
Vis anskaffelsen » Nevnte leverandører:Stangeland Maskin AS
2017-08-22County road 243 the Crossing of Sifjorden (Statens vegvesen Region nord)
The project includes construction works for a new road connection over Sifjorden. The masses shall be blasted and transported from a side gravel pit at the farther end of fjord and be deposited in the sea filling. The first layer of masses shall be deposited by using seagoing equipment to contour line — 20 metres. The remaining masses shall be deposited by using on shore excavators Masses shall be deposited from both sides of the fjord due to the construction of a 45 metres bridge in the middle of the …
Vis anskaffelsen »
2015-05-11Waste sorting plant, Sandnes — Groundworks 1 (IVAR IKS)
Vegetation clearing, excavation and transportation of 0.5 m topsoil + silt and sand layer to 1.7 under planned foundations on the construction area/site. Transport, back-filling//surface — blasted stone and compression of delivered matter to planned course level. Total affected area 17 000 m.
Vis anskaffelsen » Nevnte leverandører:Bjelland Entreprenør As
2015-03-26Contract B10 (Alstahaug havnevesen KF)
The contract is for blasting out and roughly levelling area K3 and the plot on area I3, establishing of fences, gates and ditches as well as a filling of blasted stone in the sea (in jetties) from approx. contour -4 m to approx. contour +3.4 m. Additional option for a filling in the sea with barges from the seabed and up to approx. contour -4 m (foot jetties).
Vis anskaffelsen »
2015-02-05Framework agreement, excavation, blasting and transport services (Ski Kommune)
With this Ski kommune, henceforth referred to as the contracting authority, requests tender for a framework agreement involving excavation, blasting and transport services. In connection with ongoing operations and maintenance of the contracting authority's buildings, outdoor areas, water and sewage systems, etc., there will be a requirement for excavation and landscape gardening works, with accompanying transport of machines, equipment and masses. The contracting authority has a requirement for …
Vis anskaffelsen » Nevnte leverandører:Alvim EntreprenørHerstad ASSvein Grøstad
2014-12-03The conveying of the main infrastructure to F-35 (Forsvarsbygg)
Project 5000408 main infrastructure work for F-35 comprises the excavation of a large ditch, partially deep and wide, as well as the delivery and laying of waste water pipelines, surface water pipelines, water pipelines, high-tension electricity cables, district heating and remote cooling pipes and ICT drawing pipes. Development of a street and pavement on parts of the ditch route.
The contract will mainly consist of:
— Foundation works.
— Roadworks.
— Delivery and laying of water pipelines.
— Delivery …
Vis anskaffelsen » Nevnte leverandører:THOR GJUL AS
2014-01-28Levanger School - Turnkey contract (FAVEO Prosjektledelse)
A new middle school for 540 pupils is to be built in Røstad in Levanger municipality.
The building consists of two floors, about 6 700m2 gross floor area.
In addition, parking, access road and an outdoor area directly adjacent to the new middle school are intended.
An architectural competition with an accompanying outdoor situation has been held.
The winners of this competition, Div.A architects, and landscape architects Bjørbekk Lindheim, will be engaged by the contractor. See the attached offer from …
Vis anskaffelsen »
2012-12-240322012 - Demolition and depollution - Smestad (Oslo kommune, Renovasjonsetaten)
Oslo kommune through REN will establish a new recycling center in Ullernchausseen 26, Oslo. The plot can not be used for recycling center within the limits set out in the zoning plan without building a new facility. To make room for the new facility, the existing building must be removed. Because of suspicion of contamination in the soil the masses in the areas must also be checked and possibly be removed.
A contractor will be procured for the demolition and environmental work in connection with this …
Vis anskaffelsen »