Anskaffelser: Fjerning av øvre jordsmonn

11 arkiverte anskaffelser

Fjerning av øvre jordsmonn har blitt anskaffet av organisasjoner som Nye Veier, Strand kommune og Alstahaug havnevesen KF.

Nyeste anskaffelser av fjerning av øvre jordsmonn i Norge

2020-05-13   New Fjelltun School, Contract 3 Groundwork (Strand kommune)
New Fjelltun School, construction stage 1. Contract 3 groundwork. New Fjelltun School and construction stage 1 of the outside area is to be constructed in accordance with the preliminary project and within the cost limit of NOK 330 million. The new school must be ready for the start of the school year in 2022. The groundwork includes, amongst other things: — excavation of the building pit, — ditches for water and sewage and cables, — bus stop, — road and foot/cycle path, — car park. Vis anskaffelsen »
Nevnte leverandører: Stangeland Maskin AS
2019-12-24   Framework Agreement; Excavating Contractor — Test Project Archaeology (New Publication) (Nye Veier)
The contract includes all work that needs to be carried out with an excavator or similar machinery, and associated necessary works, in connection with archaeological records, surveys and excavations. Vis anskaffelsen »
Nevnte leverandører: Nordbø Maskin As
2019-11-01   Framework Agreement: Excavating Contractors — Test Project Archaeology (Nye Veier)
The contract includes all work that needs to be carried out with an excavator or similar machinery, and associated necessary works, in connection with archaeological records, surveys and excavations. Vis anskaffelsen »
2017-08-22   County road 243 the Crossing of Sifjorden (Statens vegvesen Region nord)
The project includes construction works for a new road connection over Sifjorden. The masses shall be blasted and transported from a side gravel pit at the farther end of fjord and be deposited in the sea filling. The first layer of masses shall be deposited by using seagoing equipment to contour line — 20 metres. The remaining masses shall be deposited by using on shore excavators Masses shall be deposited from both sides of the fjord due to the construction of a 45 metres bridge in the middle of the … Vis anskaffelsen »
2017-06-01   Tau school Superparken contract 03 Foundation works (Strand kommune)
Tau school Superparken construction stage 1. Contract 03 Foundation works. Vis anskaffelsen »
2015-06-30   100156 Bardufoss officers' billeting Rusta, phase 1 (Forsvarsbygg (The Norwegian Defence Estates Agency))
The project includes engineering design and construction of a building with 36 small quarters. The building shall be constructed with three floors and a mid-corridor. Technical rooms and sheds for the residents are situated in the attic. Vis anskaffelsen »
Nevnte leverandører: SB2 Utvikling AS
2015-05-11   Waste sorting plant, Sandnes — Groundworks 1 (IVAR IKS)
Vegetation clearing, excavation and transportation of 0.5 m topsoil + silt and sand layer to 1.7 under planned foundations on the construction area/site. Transport, back-filling//surface — blasted stone and compression of delivered matter to planned course level. Total affected area 17 000 m. Vis anskaffelsen »
Nevnte leverandører: Bjelland Entreprenør As
2015-03-26   Contract B10 (Alstahaug havnevesen KF)
The contract is for blasting out and roughly levelling area K3 and the plot on area I3, establishing of fences, gates and ditches as well as a filling of blasted stone in the sea (in jetties) from approx. contour -4 m to approx. contour +3.4 m. Additional option for a filling in the sea with barges from the seabed and up to approx. contour -4 m (foot jetties). Vis anskaffelsen »
2015-02-05   Framework agreement, excavation, blasting and transport services (Ski Kommune)
With this Ski kommune, henceforth referred to as the contracting authority, requests tender for a framework agreement involving excavation, blasting and transport services. In connection with ongoing operations and maintenance of the contracting authority's buildings, outdoor areas, water and sewage systems, etc., there will be a requirement for excavation and landscape gardening works, with accompanying transport of machines, equipment and masses. The contracting authority has a requirement for … Vis anskaffelsen »
Nevnte leverandører: Alvim Entreprenør Herstad AS Svein Grøstad
2014-12-03   The conveying of the main infrastructure to F-35 (Forsvarsbygg)
Project 5000408 main infrastructure work for F-35 comprises the excavation of a large ditch, partially deep and wide, as well as the delivery and laying of waste water pipelines, surface water pipelines, water pipelines, high-tension electricity cables, district heating and remote cooling pipes and ICT drawing pipes. Development of a street and pavement on parts of the ditch route. The contract will mainly consist of: — Foundation works. — Roadworks. — Delivery and laying of water pipelines. — Delivery … Vis anskaffelsen »
Nevnte leverandører: THOR GJUL AS
2014-08-19   Nye Gamlingen - Footpaths, roads and Water and Sewage facility (Stavanger kommune)
Preparation of roads, footpaths, water and sewage facility in compliance with the area's zoning plan. Vis anskaffelsen »
Nevnte leverandører: Rygg Maskin AS