2023-03-22   STC STAND-BY TANK HARALDRUD TANK (Hafslund Oslo Celsio AS)
Haraldrud Varmesentral is a remote heating facility at Haraldrud in Oslo. It is owned and operated by Hafslund Oslo Celsio AS. There is an oil tank of 2000 mยณ at the facility with a traditional concrete, square collection tank (STC). This collection tank is too small as it only has a collection volume of 725 mยณ. In order to achieve the statutory 100% collection for the tank, a decision has been made to build an active STC system with an external STC tank of 1300 mยณ to cover the mission volume in the โ€ฆ Vis anskaffelsen ยป
2023-01-18   Concrete work and foundations for CCS Oslo (Hafslund Oslo Celsio AS)
Hafslund Oslo Celsio AS (Celsio) is Norway's largest district heating supplier and accounts for 36 percent of all district heating generated in Norway. We produce and distribute renewable thermal energy (district heating and cooling) in Stor-Oslo and ensure safe and environmentally friendly final treatment of waste that cannot or should not be reused or recycled. . Work is being carried out on large development projects, and the company intends to establish a full-scale carbon capture and storage (CCS) โ€ฆ Vis anskaffelsen ยป
2022-09-23   Pre-qualification New administration building Klemetsrud (Hafslund Oslo Celsio AS)
This is a pre-qualification for participation in RFP for the following scope: Due to the realisation of the carbon capture project at the Klemetsrud plant the existing administration building will be demolished by the end of 2022 and there's a need for a new administration building. This contract is for the building of a new administration building. Celsio will ensure a temporary administration building while the new building is under construction. This procurement is for a turnkey contract. Vis anskaffelsen ยป
2022-08-24   Foundation work Seasonal storage Furuset (Hafslund Oslo Celsio AS)
The foundation works include establishing the area for energy wells for Hafslund Oslo Celsio AS (Celsio)'s planned geoenergy seasonal storage at Furuset in Oslo. The area needs to be excavated, masses need to be removed and the area needs to be carefully planned after the well park has been established. The construction area needs to be prepared at the same time as other projects and with the desired masses etc. and in accordance with the builder's requirements. Vis anskaffelsen ยป