2024-05-08   Framework agreement building automation, Forsvarsbygg R01550, R01645, R01646, R01647, R01648 and R01649 (Forsvarsbygg)
The Norwegian Defence Estates Agency invites tenderers to submit tenders for the following assignments: Framework agreement for the procurement of material and services within the operation, maintenance and new procurement of building automation systems, components and services for the systems and components. The objective of the framework agreements is to cover the contracting authority ́s need for automation systems, under services in connection with service, maintenance, replacements and new … Vis anskaffelsen »
2022-03-31   190357 - New Mo i Rana Airport - Partner barracks (Avinor AS)
See the tender documentation. The contract´s scope The contract applies for Avinor AS, org.no. 985 198 292. The plan is to award the contract in Q2 2022. The necessary detailed engineering design services and preparatory work will be started immediately after the contract has been signed. See Annex A for further details on the scope. Vis anskaffelsen »
2022-02-08   Oslo Airport Gardermoen – K-190375 Commercial Areas Central Area 2023 (KAS 2023) - General Contract (Avinor AS)
The aim of the project is to make an open square with commercial activities, an information point, and adjusted layout for Duty Free shops, a new entrance area for international, with new customs and a book shop in the central area at Oslo Airport Gardermoen. This involves demolition work for building elements in the centre of level F, which will make room for the new development. Contract duration: 1 year. Contract signing: May 2022. Vis anskaffelsen »
2021-12-06   190288 - New Mo i Rana Airport - Turnkey contractor (Avinor AS)
See the tender documentation. The contract´s scope The contracting authority is Avinor AS, organisation no. 985 198 292. The invitation to tender concerns the procurement of a turnkey contract for the development of the new Mo i Rana airport where partnering contracting is the model contract. Contract period: The works are expected to be initiated during the second quarter of 2022 and the contract is valid until the project is completed and handed over to Avinor’s operational organisation. See Annex A1 … Vis anskaffelsen »
Nevnte leverandører: AF Gruppen Norge AS, AF Anlegg
2021-05-10   Avinor AS — Framework Agreements Construction Works (Avinor AS)
Framework agreements for Stavanger and Bergen airports. Vis anskaffelsen »
2021-04-07   189257 — Tromsø Airport — Passenger Boarding Bridges (PBB) (Avinor AS)
3 passenger boarding bridges for gates 18-20. The delivery consists of a fixed part from the terminal building to a fixed point, as well as a moveable part from the fixed point out to the plane. Vis anskaffelsen »
Nevnte leverandører: Shenzhen CIMC-Tianda Airport Support Ltd.
2021-04-07   Stavanger Airport — K-189492 — Reconstruction of a Car Park (Avinor AS)
The car park at Stavanger Airport will be reconstructed. Vis anskaffelsen »
2020-05-25   189255 — Tromsø Airport — Terminal with Aprons (Avinor AS)
New terminal, aprons, land side works and demolition. Vis anskaffelsen »
2020-05-25   189256 - Tromsø Airport – Baggage Handling System (BHS) (Avinor AS)
— New permanent and complete Baggage Handling System (BHS), departures and arrivals, — Temporary check-in and feeding line for BHS, — BHS for temporary international terminal. A complete Baggage Handling System is to be understood as delivery of baggage bins and conveyors in the new baggage hall, new technical installations in the rebuilt Terminal A (existing terminal), baggage feeding lines, screening machine, reclaim units, etc. Vis anskaffelsen »
2019-10-02   185366 — Oslo Airport — UNSØ High Voltage (Avinor AS)
See the tender documentation. Vis anskaffelsen »
2019-10-01   C01550 Evenes Air Station, MPA Construction Contract (Forsvarsbygg)
The contract will mainly consist of: — ground works from and including road bed and excavation for building sewers etc., approx. 15,000 m — construction of new hangers in steel and sandwich elements, approx. 7,700 m, — hangar gates will be delivered in a separate contract, — construction of adm/warehouse/workshop made of timber, sandwich elements and concrete, approx. 10,000 m, — construction of cold garage made of Leca and sandwich elements, approx. 850 m. Click here https://permalink.mercell.com/114185590.aspx Vis anskaffelsen »
2019-05-25   New Airport Mo i Rana (Polarsirkelen Lufthavnsutvikling AS)
New airport Mo i Rana is an airport in category 4D/E by the E12 just to the east of Mo i Rana (Fagerlia). The project roughly includes, in addition to a runway of 2 400 m, apron places for 6 planes, a terminal building of approx. 6 000 m, a service building of approx. 4 000 m, operational and maintenance equipment, car parks for 580 passenger cars, connection to municipal water and sewage network, alterations to existing power lines, power and energy supply, as well as a dual carriageway access road with … Vis anskaffelsen »
Nevnte leverandører: Peab Anlegg AS
2018-05-14   187283 — Alta airport — A New Operations Building and Premises for an Airport Operator (Avinor AS)
The Contract for Alta airport comprises 2 lots: 1) The establishment of a new operations building. The operations building shall be constructed with common functions, a garage, a workshop, washing hall, etc. 2) Premises for the airport operator Vis anskaffelsen »
Nevnte leverandører: Harald Nilsen Entreprenørforretning AS
2018-04-28   Nawsarh Rygge — Turnkey contract (Forsvarsbygg)
The Ministry of Justice and Public Security has given the Norwegian Defence Estates Agency the task of facilitating facilities for new rescue helicopters. The rescue service has bases at Sola, Florø, Ørland, Bodø, Banak and Rygge. Rygge is the fourth base in the programme. Vis anskaffelsen »
2017-07-21   186751 — Oslo Airport — Relocalisation Border control station (GKS) and Security control station (SKS) — Turnkey contract (Avinor AS)
Avinor AS at Oslo airport is planning an expansion of the Cargo area at Gardermoen, where i.a. the current Border control station for the Norwegian Food Safety Authority (GKS) and the Security control Cargo (SKS) are situated. New GKS and SKS situated at a site further south must therefore be constructed. The gross area for the new GKS is approx. 1 500 m² and the gross area for the new SKS is approx. 350 m² Some of the existing infrastructure must be altered. Vis anskaffelsen »
2017-06-28   Bergen — Reconstruction of the existing terminal (Avinor AS)
Bergen — Reconstruction project in the existing terminal in order to adapt it to the new T3 terminal. Vis anskaffelsen »
2017-04-26   Non-Schengen Terminal (185252) (Avinor AS)
Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport. The area is situated east of the eastern pier, at a security checked area of the airport. The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation during the expansion. The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a footprint of approx. 5 000 m² and the area of the new building is approx. 26 000 m² including 8 new … Vis anskaffelsen »
2016-08-25   Site work air side BA/VA (185325) (Avinor AS)
Avinor AS, Oslo Airport (OSL) is planning the expansion of the Non-Schengen traffic areas, which includes a terminal and air side. The contract includes the necessary building and site work for the alteration and establishment of new apron areas as well as other infrastructure and basements and shafts for the building. The contract also includes the expansion and extension of taxiways, culverts and the expansion of an existing surface water pump station. Vis anskaffelsen »
2016-02-09   Stavanger Airport Sola, Insulation and roofing (B16) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building, which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 5 600 m divided between 3 floors of various sizes. Vis anskaffelsen »
Nevnte leverandører: Protan AS
2016-01-27   Stavanger Airport Sola, Aluminium and glazing and revolving doors (A05) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building already initiated, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m divided in 3 floors of various sizes. Vis anskaffelsen »
Nevnte leverandører: A.S Rubicon
2015-12-23   Stavanger Airport Sola, Electrical installations and distribution networks (E10) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m2 divided in three floors of various sizes. This contract comprises a complete electrical Installation works, with both electric power and telecommunication systems in the arrival area, a new building and … Vis anskaffelsen »
Nevnte leverandører: Bravda Norge AS
2015-12-03   Stavanger Airport Sola, P-184893 — Air Treatment (Actus Rådgivning AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approximately 4 500 m² divided in 3 floors of various sizes. Vis anskaffelsen »
Nevnte leverandører: Simex As
2015-12-03   Stavanger Airport Sola, P-184892 — Pipe system (Actus Rådgivning AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approximately 4 500 m² divided in 3 floors of various sizes. This contract involves pipe technical installations at the arrival area. Examples of work which may be included in the contract V10: — Refrigerating machines/heat pump; — … Vis anskaffelsen »
Nevnte leverandører: Finn Midbøe As
2015-11-23   Stavanger Airport, Sola, P-184889 — Prefabrication and steel works (B15) (Actus Rådgivning AS)
Avinor shall expand central areas at Stavanger Airport, Sola (shortened SLS-USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m divided in 3 floors of various sizes. Vis anskaffelsen »
Nevnte leverandører: Jærentreprenør AS
2015-09-22   Stavanger Airport Sola, P-184624 — Ground works (Actus Rådgivning AS)
Avinor shall expand central areas at Stavanger Airport Sola (shortened SLS-USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The new construction's foundation plate is approximately 2 300 m. The building will be founded on friction piles which will be pushed down to a depth of 35 m to 40 m. Vis anskaffelsen »
Nevnte leverandører: Risa As
2015-09-21   Stavanger Airport Sola, P184623 — Concrete and piling works (Actus Rådgivning AS (Actabus Consultancy ))
Avinor shall expand central areas of Stavanger Airport Sola (henceforth referred to as SLS — US01). The expansion comprised the expansion of the check-in hall and a storage building that is already in process of being built, as well as an expanded arrival and custom area (this tender notice). The bottom plate is approx. 2 300 m. The building shall be founded on friction piles that are founded on a depth of 35-40 metres. Vis anskaffelsen »
Nevnte leverandører: Vest Betong AS
2015-09-15   Pre-qualification- Outdoor works — FBKB Maintenance building — ØHF — Contract 852050 (Forsvarsbygg (The Norwegian Defence Estates Agency))
The project includes preparation of associated infrastructure and outdoor areas. The project is divided into several contracts the contract will mainly consist of: — Foundation works. — Laying of asphalt and concrete track cover and flight operations surfaces. — Delivery and laying of Surface Water pipes. — Establishment of roads — Construction of embankments and perimeter security — Site gardening works. Vis anskaffelsen »
Nevnte leverandører: Tore Løkke AS
2015-04-08   P-72711 Modifications SBØ level D and F (Oslo Lufthavn AS)
The contract will be executed as a Contractor managed execution contract. The work involves modification in the existing terminal in operation on level D-D-F-I with the main part of the modification work in the northern part of the existing domestic and international arrival hall on level D and north of the security control on level F. A comprehensive modification shall be carried out on the existing functions for establishment of i.a. new offices, storage areas, central kitchen, customs barriers … Vis anskaffelsen »
Nevnte leverandører: Ø.M Fjeld AS
2014-11-24   P-183767 Framework agreement machine contractors (Oslo Lufthavn AS)
The following services will typically be required in the contract: — Excavation work, — Transport of matter, — Laying water and sewage pipes, — Establishing of cable routes with embedding pipes (OPI-channels), — Construction of infiltration installations, — Construction of roads and minor alteration work on taxiways, — Individual outdoor installations and landscape work, — Marking and measuring work for own work. The framework agreement consists of the work described above. The extent will vary from year … Vis anskaffelsen »
Nevnte leverandører: Gjermundshaug Anlegg AS Johan Rognerud AS Nordby Maskin AS
2014-10-21   P-72237 / P-72257 Fixtures (Oslo Lufthavn AS)
This contract, 72257, shall execute and deliver fixtures to both the Central building and Pier North as well as some to the existing terminal. Contract 72257 mainly includes the following informative services: — Supplier engineering design, — Service counters, — Check-in counters, — Gate counters, — Various furnishing elements, — Various smaller furnishing equipment (e.g. pegs, etc.), — Etc. Vis anskaffelsen »
Nevnte leverandører: Bosvik AS
2014-09-03   Pavilions — Commercial area (Oslo Lufthavn AS)
This contract 72713, includes detailed engineering design, production and installation of pavilions in the Terminal's departure area, in the central commercial area of the Airport. Contract 7213 mainly includes the following informative services: — Supplier engineering design with 3D systems based on the existing data model (Rhino 3D + Grasshopper + T-Splines), — Systems with adjoining elements and technical plants, — Manufacturing of pavilions with double curved light weight structures, — The six … Vis anskaffelsen »
Nevnte leverandører: Lindner AG
2014-05-30   T3 Avinor 80304 Air treatment and air cooling (SWECO Norge AS Bergen)
80304 Air treatment and air cooling. Vis anskaffelsen »
Nevnte leverandører: GK Norge AS
2014-05-27   Pipework (Actus Rådgivning AS)
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1 290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The construction work is being performed while the airport is in operation. The scope of this contract … Vis anskaffelsen »
2014-05-27   Electrical installations (Actus Rådgivning AS)
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The construction work is being performed while the airport is in operation. The scope of this contract … Vis anskaffelsen »
2014-05-05   Insulation and roofing (Actus Rådgivning AS)
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1 290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor … Vis anskaffelsen »
2014-05-02   Aluminum- and glass / window work (Actus Rådgivning AS)
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor … Vis anskaffelsen »
2014-05-02   Building construction work – Part 2 (Actus Rådgivning AS)
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor … Vis anskaffelsen »
2014-04-01   Prefabricated concrete elements and steelwork (Actus Rådgivning AS)
Stavanger Airport Sola, Norway shall extend the terminal building due to a reconstruction of a baggage handling system and of commercial areas, – international 3rd floor. The extension will be executed through several Client managed contracts. The contract: ‘Prefabricated concrete elements and steelwork’ will contain the delivery and erection of floor separations and ceilings in Hollow Concrete Elements 2100 square meters, floor screed (leveling compound) of 1 050 square meters, concrete façade elements, … Vis anskaffelsen »
2014-03-14   Passenger and goods traffic west (Oslo Lufthavn AS)
The contract contains renovation works in the existing terminal. This encompasses construction of a new commodity lift from level A (base level) to level F, construction of a new public staircase and elevator from level E to G, as well as a commodity transport corridor, which will be adapted to the transport corridor across the railroad culvert at level C with an access ramp to level D. In addition, a new transition corridor will be built at the west pier on level G. These works does to a large degree … Vis anskaffelsen »
2014-03-07   T3 Avinor Flesland 80302 Internal works (Avinor AS)
The procurement comprises complete execution of internal building works on the New terminal at Bergen Airport Flesland. The contract will be carried out as a shared contract according to NS8405. The terminal is divided into seven levels with respectively four technical and three public levels. The gross area of the terminal is 63 000 m² and consists of central building, piers, passenger bridges as well as bridge connections to the current terminal. The terminals main function is the public areas, … Vis anskaffelsen »
Nevnte leverandører: Hent As
2014-02-05   Passenger and goods traffic west (Oslo Lufthavn AS)
The contract contains renovation works in the existing terminal. This encompasses construction of a new commodity lift from level A (base level) to level F, construction of a new public staircase and elevator from level E to G, as well as a commodity transport corridor, which will be adapted to the transport corridor across the railroad culvert at level C with an access ramp to level D. In addition, a new transition corridor will be built at the west pier on level G. These works does to a large degree … Vis anskaffelsen »
2013-12-18   P-72254 Fire sealing (Oslo Lufthavn AS)
This contract includes: — Fire and soundproofing of the Western central Building (approx. 52,000 m²). — Fire and soundproofing of Pir north, including the northern Pir root (approx. 64,000 m²). — The supplier designing is required for the completion of the contract. — The interface with other contracts. — Rig for a separate contract. Refer also to appendix A 'Orientering om anskaffelsen' (Briefing on the procurement). Note: To register your interest in this notice and obtain any additional information … Vis anskaffelsen »
2013-11-21   P-72249 Pier North - Access system for operation (Oslo Lufthavn AS)
This contract is for, in key words, the following elements: — Contractor engineering design services — All the necessary work for complete access systems — Includes assembly against adjoining constructions — Rail systems + hanging scaffolding inside including fixing for access to facades — Mobile work platforms/lifting platforms inside including fixing for access to facades — Walkway system inside including fixing for access to facades — Grate inside including fixing for access to customs dividing wall — … Vis anskaffelsen »
2013-10-29   Bergen Airport Flesland - Nnew operations building (Avinor AS)
Avinor AS, clerk of works, shall construct a new operations building at Bergen lufthavn, Flesland. The construction site has been filled in and is ready for the construction to start. The planned building has a built-up floor area of approximately 2700 m2, and a total BRA of 3700 m2. The building shall comprise several main areas: security, dining room, education/training, workshops, car wash, garages and administration (on 2nd floor). The new building shall be constructed based on completed drawings of … Vis anskaffelsen »
2013-10-28   P-72239 Profile doors (Oslo Lufthavn AS)
The delivery and installation of interior profile doors. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=308990 Vis anskaffelsen »
2013-10-28   P-72231 Laminate doors (Oslo Lufthavn AS)