Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms.
The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor outer wall is made of frameworks and window areas. The landside extension is erected as steel framework with timber frames. The construction work is being performed while the airport is in operation.
The scope of this contract comprises the complete work related to timber, ceilings, painting, flooring, fire packing/sealing, bricking and tiles. Contract award is planned to take place primo September 2014. Preliminary plan for site execution is from 1.10.2014 to 5.5.2015.
The contract shall include an optional additional delivery of until 100 % of the initial contract value covering the potential next extension of the central terminal area (USO T1). This extension is planned to be executed in sequential phases.
In summary, – this contract comprises the first phase extension (TUSO) + an option for reconstruction of the commercial area and preparatory work for the first next phase (USO T1).

Frist

Fristen for mottak av tilbud var 2014-06-03. Anskaffelsen ble publisert 2014-05-02.

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2014-05-02 Kunngjøring av konkurranse
Kunngjøring av konkurranse (2014-05-02)
Gjenstand
Anskaffelsens omfang
Tittel: Airport buildings construction work
Antall eller omfang:
The scope of this contract comprises the complete work related to timber, ceilings, painting, flooring, fire packing/sealing, bricking and tiles regarding following project:Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms.The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor outer wall is made of frameworks and window areas. The landside extension is erected as steel framework with timber frames.
Vis mer
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS)
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsarbeid i forbindelse med Lufthavnbygninger 📦

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Forsyningsenhet
Navn på tildelende myndighet: Actus Rådgivning AS
Postadresse: PB 254
Postnummer: 4097
Poststed: Sola
Kontakt
E-post: harald@a-r.no 📧

Referanse
Datoer
Sendt dato: 2014-05-02 📅
Innleveringsfrist: 2014-06-03 📅
Publiseringsdato: 2014-05-06 📅
Identifikatorer
Kunngjøringsnummer: 2014/S 087-153155
OJ-S-utgave: 87

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms.
Vis mer
The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor outer wall is made of frameworks and window areas. The landside extension is erected as steel framework with timber frames. The construction work is being performed while the airport is in operation.
Vis mer
The scope of this contract comprises the complete work related to timber, ceilings, painting, flooring, fire packing/sealing, bricking and tiles. Contract award is planned to take place primo September 2014. Preliminary plan for site execution is from 1.10.2014 to 5.5.2015.
Vis mer
The contract shall include an optional additional delivery of until 100 % of the initial contract value covering the potential next extension of the central terminal area (USO T1). This extension is planned to be executed in sequential phases.
In summary, – this contract comprises the first phase extension (TUSO) + an option for reconstruction of the commercial area and preparatory work for the first next phase (USO T1).
Antall eller omfang:
The scope of this contract comprises the complete work related to timber, ceilings, painting, flooring, fire packing/sealing, bricking and tiles regarding following project:
Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms.
Vis mer
The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor outer wall is made of frameworks and window areas. The landside extension is erected as steel framework with timber frames.
Vis mer
Beskrivelse av opsjoner:
The contract shall include an optional additional delivery of until 100 % of the initial contract value covering parts of the potential next extension of the central terminal area (USO T1). This extension is planned to be executed in sequential phases.
Vis mer
In summary, – this contract comprises the first phase extension (TUSO) + an option for reconstruction of the commercial area and preparatory work for the first next phase (USO T1).
Referansenummer: P-183401
Utførelsessted
Hovedsted eller utførelsessted: Stavanger Lufthavn Sola.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Økonomisk og finansiell stilling: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Teknisk og faglig kapasitet: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Kontraktutførelse
Innskudd og garantier som kreves: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Juridisk form som skal antas av gruppen av økonomiske operatører som kontrakten skal tildeles til: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.
Andre særlige vilkår: Ref. document “P-183401 – Invitasjon til prekvalifisering_TUSO V1.0“.

Prosedyre
Språk
Andre språk: Norwegian.

Oppdragsgiver
Identitet
Nasjonalt registreringsnummer: 993274992
Navn på tildelende myndighet: Avinor AS
Nasjonalt registreringsnummer: 985 198 292
Poststed: Gardermoen
Postnummer: 2061
Kontakt
Adresse til kjøperprofilen: https://kgv.doffin.no/ctm/Supplier/CompanyInformation/Index/2200 🌏
URL for dokumenter: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/116469 🌏
Kilde: OJS 2014/S 087-153155 (2014-05-02)