2016-02-09Stavanger Airport Sola, Insulation and roofing (B16) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building, which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 5 600 m divided between 3 floors of various sizes.
Vis anskaffelsen » Nevnte leverandører:Protan AS
2016-01-27Stavanger Airport Sola, Aluminium and glazing and revolving doors (A05) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building already initiated, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m divided in 3 floors of various sizes.
Vis anskaffelsen » Nevnte leverandører:A.S Rubicon
2015-12-23Stavanger Airport Sola, Electrical installations and distribution networks (E10) (OEC Gruppen AS)
Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m2 divided in three floors of various sizes.
This contract comprises a complete electrical Installation works, with both electric power and telecommunication systems in the arrival area, a new building and …
Vis anskaffelsen » Nevnte leverandører:Bravda Norge AS