2024-04-16Procurement of architect and consultancy services for the project Helikopterbase Kirkenes, on behalf of Finnmark Hospital. (Sykehusbygg HF)
Sykehusbygg Health Trust invites tenderers, on behalf of the Finnmark Hospital, to a competition for architect and consultancy services for the preliminary project of a new helicopter base in connection with Kirkenes hospital. This procurement is for the preparation of a preliminary project and function descriptions/technical tender documentation for a contract for a new helicopter base with the accompanying facilities at Kirkenes Hospital. Tenderers shall deliver a complete consultant group with …
Vis anskaffelsen »
2022-03-31190357 - New Mo i Rana Airport - Partner barracks (Avinor AS)
See the tender documentation.
The contract´s scope
The contract applies for Avinor AS, org.no. 985 198 292.
The plan is to award the contract in Q2 2022. The necessary detailed engineering design services and preparatory work will be started immediately after the contract has been signed.
See Annex A for further details on the scope.
Vis anskaffelsen »
2021-01-08Kristiansund Airport Kvernberget — K-189806 — Re-asphalting (Avinor AS)
The project consists of re asphalting of parts of the runway, taxiway and the apron at Kristiansund Airport. The part of the runway that will be asphalted is 1 895 m long with a limit of 0.45 m, as well as the turning platform at the northern end of approx. 1 230 m. The runway was last asphalted in 1997. In addition, the shoulders will be re-asphalted with a width of 7.5 m on each side.
The assignment duration: April-June 2021.
Vis anskaffelsen » Nevnte leverandører:Veidekke Industri as
2020-09-26100814 Traffic Flow Platform North Evenes (The Norwegian Defence Estates Agency)
A traffic flow platform is to be established for planes in the north, 2021. The work is to be carried out as an execution contract in accordance with NS 8405. Start-up April, completion September. The Norwegian Defence Estates Agency has applied in advance and have had a reduced runway length approved for the period 22 April 2021-15 July 2021. Work in the period outside these dates requires coordination and adaptations with all plane movements.
The project will cover the following disciplines:
— …
Vis anskaffelsen »
2018-06-01Parallel Framework Agreements — Consultants Building and Construction — Professions: RIx, Ark, Areal (K-187259) (Avinor AS)
Avinor AS, hereafter called the Contracting Authority, invites tenderers to a competition for the procurement of parallel Framework Agreements for technical consultants for building and construction with the following groups:
1) Air side and outside: RIE, RIVA, RIA (RI Installations), RIM;
2) Building: RIB, RIBr, RIM, RIV, RIE, RID, RIA, RIBfy, RIEn;
3) Ark;
4) Areal.
The consultants can be engaged for assignments within; ideas, regulation, preliminary project, detailed engineering design, engineering …
Vis anskaffelsen »
2015-06-0915/07624 Framework agreement for maintenance services — Bergen airport Flesland (Avinor AS)
Avinor and Bergen airport Flesland intend to enter into framework agreement and a good co-operation with a robust tenderer who has a broad competence in different specialist fields in connection to the maintenance of asphalt, concrete, marking paint, green areas, etc.
See the qualification document and orientation about the procurement.
Vis anskaffelsen »
2015-03-03P-184105 Kristiansand airport — Reasphalting works on the runway — Electro works (Avinor AS)
Ssummer 2015, Avinor is planning to carry out reasphalting works on the runway The works in this contract includes the following main elements:
— disassembling and reassembling flush marking lights for the runway's centre line/target point, including core drilling/slot coupling for fittings/cables, delivery/installation of cables, spotlights, etc.;
— disassembling and reassembling some flush approach lights, flush runway end lights and flush runway edge lights;
— Establishment of temporary runway end …
Vis anskaffelsen » Nevnte leverandører:Intertec AS
2014-03-07T3 Avinor Flesland 80302 Internal works (Avinor AS)
The procurement comprises complete execution of internal building works on the New terminal at Bergen Airport Flesland. The contract will be carried out as a shared contract according to NS8405. The terminal is divided into seven levels with respectively four technical and three public levels. The gross area of the terminal is 63 000 m² and consists of central building, piers, passenger bridges as well as bridge connections to the current terminal. The terminals main function is the public areas, …
Vis anskaffelsen » Nevnte leverandører:Hent As
2014-02-15T3 Avinor Flesland 80452 Airside Electrical (Avinor AS)
Enterprise 80452 Airside Electrical on the T3 project New Terminal Flesland is the electrical contract for establishing the new Airside to the new T3 Terminal.
The contract comprises runway lights and signs, general electrical for airside, as well as technical aircraft control in connection to the new taxiways and apron areas. For further information see the attached qualification documentation.
Vis anskaffelsen »
2013-12-17T3 Avinor Flesland 80452 Electrical on the airside (Avinor AS)
The 80452 construction of Electrical on the airside within the project T3 for the new terminal at Flesland airport is an electrical contract for the establishment of the new airside associated with the new Terminal T3.
The contract includes runway lights and signs, general electrical airside and the technical aircraft operations related to the new taxiways and apron areas. For further information refer to the qualification documents, which are attached to the original notice published on: …
Vis anskaffelsen »
2013-12-10450894 – Bodø, improvement of runway surface (Forsvarsbygg)
The project includes works with adding new friction cover of epoxy on the main runway at the Bodø main air station. The associated works include among other things preparatory work of repairing damage to the
concrete covering before the runway surface is added, and the after works.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at: http://www.doffin.no/Search/Search_Switch.aspx?ID=312485
Vis anskaffelsen »
2013-11-26Kristiansand Airport Kjevik. New international termainal. General contract GE-01 (Avinor AS)
The international traffic at Kristiansand Airport Kjevik is increasing and the public areas will have reached a minimum standard in 2014. In addition the areas for passengers from countries outside the Schengen agreement have been extended as temporary solutions. The need for an expansion is approx 4 000 m The new international terminal is planned as an extension towards the north from the existing terminal and as an independent unit. Some of the temporary areas in the current international terminal …
Vis anskaffelsen » Nevnte leverandører:Kruse Smith Entreprenør As
2013-09-06Management and operation of the Norwegian Armed Forces fuel facilities (Forsvarets logistikkorganisasjon (FLO))
The Norwegian Armed Forces expects the consumption of services of the management and operation of the Norwegian Armed Forces fuel facilities to be at approx. 40 million Norwegian krone per year, plus the overtime per year, a total of about 45 million per year.
The services shall be delivered to the following locations:
— Bardufoss- The estimated annual through-put of F-35/F-34: 6000-10000m3/annually,
— Andøya - Estimated annual through-put of F-35/F-34: 5000-7000m3/annually,
— Bodø Main Air Base - …
Vis anskaffelsen »
2013-07-17P-182575 Harstad/Narvik airport, Evenes - S&L/ Environment Project - Electrical Works (Avinor AS)
The establishment of a completely new lighting system for runways (the edges of the runway, thresholds, the end of the runways, the centerline / viewpoints) and taxiways (the taxiway centreline lights).
New wiring for the illuminated signs on the RWY / TWY, wig-wag, papi and the approach lights also includes the moving of the individual units. Some completions related to the completion of the apron edge lights.
The assembly (core drilling and slotting the runway surface) for the most of the new lighting …
Vis anskaffelsen »
2013-07-17P-182574 Harstad/Narvik airport, Evenes – S&L/Environment Project – Plant works (Avinor AS)
The rectification and expansion of the leveled security area with the transition wires (75 m/300 m) for the runway.
Lowering/removal of terrain with the flight bar part of the security area (75 m-150 m from the runway) and the approach plane.
Removal/buckling objects within the runway safety area.
Expansion of the width of taxiway B.
Establishment of conduits for the new lighting systems (runway lights on the runway and taxiways), new windsock systems, new power supply runway light terminals, …
Vis anskaffelsen »
2013-06-17Management and operation of the Norwegian Armed Forces fuel facilities (Forsvarets logistikkorganisasjon (FLO))
The Norwegian Armed Forces expects the consumption of services of the management and operation of the Norwegian Armed Forces fuel facilities to be at approx. 40 million Norwegian krone per year, plus the overtime per year, a total of about 45 million per year.
The services shall be delivered to the following locations:
- Bardufoss- The estimated annual through-put of F-35/F-34: 6000-10000m3/annually
- Andøya - Estimated annual through-put of F-35/F-34: 5000-7000m3/annually
- Bodø Main Air Base - …
Vis anskaffelsen »
2013-06-06T3 Avinor Flesland 80301 Sealed building (Avinor AS)
80301 – Sealed building.
The expected and provisional extent of work and services for contract 80301.
80301 will take over a ready levelled construction hollow after the matter removal contract (80401).
80301 then is responsible for erecting a sealed building that comprises the framework (ground, foundations and supporting system) as well as facade works for the new terminal Flesland. The contract also comprises technical infrastructure that shall be laid in the ground under the building as well as …
Vis anskaffelsen »
2013-04-02Framework agreement for making grooves on runways (Avinor AS)
Avinor has a need for a framework agreement with a contractor that can make grooves at airports. The framework agreement shall also be used by the Norwegian defence at their air stations in Norway (Rygge, Andøya and Bardufoss). Making grooves means cutting drainage tracks in runways. The runway surface can be asphalt or concrete.
From 1.7.2009 the regulations require that runways shall have grooves if the texture is less than 1.0 mm. The measure can also be used on other runways where the texture is > …
Vis anskaffelsen »
2012-12-052012034007. Framework agreement Urea (Forsvarets logistikkorganisasjon (FLO))
Framework agreement for the delivery of technically conditioned Urea for de-icing runways.
Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=275189.
Vis anskaffelsen » Nevnte leverandører:984015666
2012-08-22P-181058 Stavanger Airport, Sola - S&L stage c - electro installation works (Avinor AS)
Establishment of new light system for new taxiway and elongation of new main runway.
Dismantling and re-installation of existing lights for THR 36/RWE 18/PAPI 36.
Establishment of new RWE lights (flush) for lane 36 in a new position with cabling.
Establishment of new approach light row for lane 36 (600 m, cabling, pylons and lights) (sections of the system is option).
Establishment of new regulators for high intensity approach lights for lanes 11/29/36.
Establishment of new circuit with braiding for high …
Vis anskaffelsen » Nevnte leverandører:Intertec Airport Division
2012-08-22P-181789 Haugesund Airport, Karmøy - S&L - electro installation works (Avinor AS)
New cabling as well as upgrading of the runway lights system for marking lights at the runway’s centre line and aiming points. Improve defects related to flight operative lights on threshold, end of runway, PAPI, approach lights, runway turnaround, etc.
New floodlight system for aprons (1-11) and new de-icing system.
Establishment of new obstruction lights on terrain obstruction.
Illuminated signs at taxiway A/B as well as new de-icing platform/new taxiway.
Establishment of new anemometer and wind sock …
Vis anskaffelsen » Nevnte leverandører:Intertec Airport Division
2012-08-14P-181788 Haugesund aiport, Karmøy - S&L - Site works (Avinor AS)
Improve and extend the levelled secure area with transition slopes (75/300m) for the runway.
Lower/remove terrain in the parts of the secure area that can be flown over.
Remove/make objects breakable within the runway’s secure area.
Construct new aeroplane de-icing installations, with a platform and taxiway.
Establish aeroplane operative lighting installations for the new aeroplane de-icing installations and marking lights for the centre line/target point for the runway.
Establish surface water …
Vis anskaffelsen » Nevnte leverandører:Vassbakk&Stol As
2012-08-14P-181057 Stavanger airport, Sola - S&L phase c - Site works (Avinor AS)
Extend runway 18/36 by approx. 150m southwards.
Establish a new taxiway for the new runway end (cf. the previous point).
Establish a levelled secure area for the new runway and taxiway (cf. the above point, 75m to the side and 300m after the end of the runway).
Establish breakable masts for wind meters/windsocks (including adjusted localisation).
Establish new electricity supply and signal cable installations to new approach lights for runway 11, GP 11 and HD installations at Solastrand.
Establish new …
Vis anskaffelsen » Nevnte leverandører:Stangeland Maskin AS
2012-03-15Place services Mehamn (Avinor AS)
Place and ground services for Mehamn airport. Includes, among other things:
— fire and rescue services,
— de-iceing,
— fuel service,
— etc. see the separate qualification documents.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=253111.
Vis anskaffelsen »
2011-11-30P-180878 Røros Airport. Security areas and lighting installations. Electro work (Avinor AS)
This notice is an invitation to prequalify for electrical work at Røros Airport. In connection with the requirements in BSL E 3-2 to new security areas, such areas shall be constructed at each end and along the sides of the runway. The work will consist of dismantling and reassembling the approach lighting system, work and supplies in connection with the relocation of lights at the end of the runway, establishment of new circuits and regulators, the establishment of a new main distribution, delivery, …
Vis anskaffelsen » Nevnte leverandører:Røros Elektrisitetsverk As
2011-10-21P-181040 Leknes airport, runway strips / RESA and lighting systems, construction works (Avinor AS)
The notice is an invitation to a pre-qualification for site works at Leknes airport. In accordance with the Norwegian regulations for aerodrome design (BSL E 3-2) new runway strips / runway end safety area (RESA) shall be established. The works will consist of the establishment of cuttings, fillings, removal of mass, the establishment of runway extensions at both ends, the establishment of an emergency road to the North, the establishment of fences, auxilary works for electro etc. See the attached tender …
Vis anskaffelsen » Nevnte leverandører:Alf Brekken & Sønner As
2011-10-21P-181041 Leknes airport, runway strips / RESA and lighting systems, electrical works (Avinor AS)
The notice is an invitation to a pre-qualification for site works at Leknes airport. In accordance with the Norwegian regulations for aerodrome design (BSL E 3-2) new runway strips / runway end safety area (RESA) shall be established. The works will consist of the establishment of approach lighting, establishing of new lighting systems, replacing the ring main for approach lighting to 3 kV standard, establishing a new backup power aggregate etc. See the attached tender documents for …
Vis anskaffelsen » Nevnte leverandører:Tom Staurbakk AS
2011-08-29Development plan with KU for new airport in the Hammerfest region (Hammerfest kommune)
A new airport shall be built at Grøtnes by Hammerfest. The assignment comprises the design of a development plan with related planning documents, as described in the tender documents. Grøtneset and the area in the sea South of Grøtnes represents the area of the airport itself. In connection with this, other businesses which may be relevant to operate around an airport, may also be established. Such businesses may be helicopter, bus, car and boat transport, commercial activities, hotels etc. Included in …
Vis anskaffelsen »
2011-08-26P-51629 Kristiansand Airport, Kjevik - S and L - EMAS (Avinor AS)
— Engineering design of EMAS solution for runways 04 and 22,
— Supply and assembly of EMAS.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=237605.
Vis anskaffelsen »
2011-07-06P-180783 Rørvik airport, runway strips / RESA and lighting systems, electrical works (Avinor AS)
The notice is an invitation to a prequalification for site works at Rørvik airport, Ryum. In accordance with the Norwegian regulations for aerodrome design (BSL E 3-2) new runway strips / runway end safety area (RESA) shall be established.
The works will consist of the establishment of approach lighting, establishing of new lighting systems, replacing the ring main for approach and runway lighting to 3 kV standard, establishing a new power inlet and a new power distribution unit, new backup power …
Vis anskaffelsen » Nevnte leverandører:NTE Elektro AS
2011-07-06P-180782 Rørvik airport, runway strips / RESA and lighting systems, construction works (Avinor AS)
The notice is an invitation to a prequalification for site works at Rørvik airport, Ryum. In accordance with the Norwegian regulations for aerodrome design (BSL E 3-2) new runway strips / runway end safety area (RESA) shall be established.
The works will consist of the establishment of cuttings, fillings, removal of mass, the establishment of runway extensions at both ends, pitching as erosion protection from the sea, the establishment of emergency roads, the establishment of fences, auxilary works for …
Vis anskaffelsen » Nevnte leverandører:Tore Løkke AS
2011-07-05P-52534 Røst Airport - S and L, stage b - electrical and electronics works (Avinor AS)
— Technical installations in a new controller room,
— Establishment of new approach light series (Cat.I) to runway 03 and re-configuration of approach lights (Cat.I) to runway 21,
— Establishment of new runway lights for the elongated runway facing south,
— Establishment of new visual glide path system,
— Supplement of runway light for the existing runway, taxiway and apron, as well as moving the existing lights for THR, RWE and interrupted landing for adaptation of new runway configuration,
— …
Vis anskaffelsen » Nevnte leverandører:Intertec Airport Department
2011-07-05P-52532 Røst airport - S and L, stage b - construction works (Avinor AS)
— establishment of a new airport fence with gates,
— expansion of levelled security area with overpass inclines (40/180m),
— removal of terrain barriers in the security area,
— lengthening of runway facing south (approx. 150 m) with tarmacked shoulder, as well as asphalt spreading of the operation areas around relevant new flight operational technical systems,
— establishment of emergency road facing south (600 m),
— auxiliary works for electro; cable alignments with conduit shafts, runway lights shafts, …
Vis anskaffelsen » Nevnte leverandører:Tore Løkke A/S
2011-06-20P-50523 Kristiansund airport, Kvernberget - S and L - Site works (Avinor AS)
— expansion of the security areas in the west in the form of levelling measures and some blasting,
— implement levelling measures and sowing along the runway,
— preparing for new LOC installations with the construction of the accompanying foundations, guidelines and instrument house,
— preparing and asphalting surfaces for the runway extension,
— establish new airport fences outside the extended security area,
— carry out necessary auxiliary works for the electro contract (ditches, manholes, foundations …
Vis anskaffelsen » Nevnte leverandører:K.A.Aurstad AS
2011-06-20P-50525 Kristiansund airport, Kvernberget - S and L - Electro works (Avinor AS)
Establish new approach light rows in accordance with the requirements for Cat I for 600 m for runway 25.
— moving and upgrading equipment/instrumentation/light installations so as to adapt for new runway lengths,
— upgrading the existing approach light row for runway 07 with light error monitoring,
— assembling runway temperature sensors,
— moving existing masts for wind socks and wind gauges,
— moving/upgrading the threshold and runway end lights for runway 25 and runway end lights for runway 07,
— …
Vis anskaffelsen » Nevnte leverandører:Yit As
2011-03-03P-51627 Kristiansand Airport, Kjevik – S and L – Electro works (Avinor AS)
— adaptation of the approach light systems,
— correction of lighting at the end fields,
— wiring and connecting centre line and aiming point lights,
— upgrading of power and signal cable systems at the flight side,
— it may also be relevant to include delivery of marking lights for the runway centre line and aiming point in the contract.
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at …
Vis anskaffelsen » Nevnte leverandører:Tom Staurbakk AS
2011-03-03P-51628 Kristiansand Airport, Kjevik – S and L – construction works (Avinor AS)
— Expansion of the safety areas with filling in sea,
— Dredging of new deep point in river/sea,
— Establishment of a soil extraction site in Stovåsen with accompanying temporary road for construction purposes to filling,
— Construction of new operation roads/inspection roads with accompanying moving of biotopes,
— Preparation for new LOC plants with construction of accompanying instrument huts,
— Preparation and asphalt spreading of the surfaces for the EMAS installation,
— Construction of hiking track …
Vis anskaffelsen » Nevnte leverandører:TT Anlegg As