Nyeste anskaffelser av arbeid i forbindelse med lufthavner i Norge
2024-04-16Procurement of architect and consultancy services for the project Helikopterbase Kirkenes, on behalf of Finnmark Hospital. (Sykehusbygg HF)
Sykehusbygg Health Trust invites tenderers, on behalf of the Finnmark Hospital, to a competition for architect and consultancy services for the preliminary project of a new helicopter base in connection with Kirkenes hospital. This procurement is for the preparation of a preliminary project and function descriptions/technical tender documentation for a contract for a new helicopter base with the accompanying facilities at Kirkenes Hospital. Tenderers shall deliver a complete consultant group with …
Vis anskaffelsen »
2022-04-28Framework agreement for marking airport runways at Bardufoss, Andenes, Rygge and Ørland (option marking of other runways) (Forsvarsbygg)
The Norwegian Defence Estates Agency is responsible for 12 airports and several helicopter landing grounds for the Norwegian Armed Forces on behalf of the Ministry of Justice and Public Security A part of the assignment is to supervise and control the aircraft operating areas, including control and implementation of the runway marking.
This framework agreement applies to marking of runways at airports in Bardufoss, Andenes, Rygge and Ørland. The framework agreement also includes an option for marking at …
Vis anskaffelsen »
2022-03-31190357 - New Mo i Rana Airport - Partner barracks (Avinor AS)
See the tender documentation.
The contract´s scope
The contract applies for Avinor AS, org.no. 985 198 292.
The plan is to award the contract in Q2 2022. The necessary detailed engineering design services and preparatory work will be started immediately after the contract has been signed.
See Annex A for further details on the scope.
Vis anskaffelsen »
2022-02-21190356 - New Mo i Rana Airport - Site Roads (Avinor AS)
See the tender documentation.
The contract´s scope
The contract applies for Avinor AS, org.no. 985 198 292.
The plan is to award the contract in Q2 2022. The necessary detailed engineering design services and preparatory work will be started immediately after the contract has been signed.
See Annex A for further details on the scope.
Vis anskaffelsen »
2022-02-08Oslo Airport Gardermoen – K-190375 Commercial Areas Central Area 2023 (KAS 2023) - General Contract (Avinor AS)
The aim of the project is to make an open square with commercial activities, an information point, and adjusted layout for Duty Free shops, a new entrance area for international, with new customs and a book shop in the central area at Oslo Airport Gardermoen. This involves demolition work for building elements in the centre of level F, which will make room for the new development. Contract duration: 1 year. Contract signing: May 2022.
Vis anskaffelsen »
2021-05-06C01351 — Qualification — ‘Bird Bath’ - Evenes (The Norwegian Defence Estates Agency)
A rinsing system for planes, ‘bird bath’, will be established on of the runways at Evenes Air Base. The function of the system is to wash away corrosive salts from planes after flying at low elevation above salt-water. Primarily this will apply to P-8A but the facility will also be able to be used for other types of planes. Planes will be able to taxi through the bird bath right after landing. Clean water will be used and the system will be designed so that used water is collected, purified and used …
Vis anskaffelsen »
2021-01-08Kristiansund Airport Kvernberget — K-189806 — Re-asphalting (Avinor AS)
The project consists of re asphalting of parts of the runway, taxiway and the apron at Kristiansund Airport. The part of the runway that will be asphalted is 1 895 m long with a limit of 0.45 m, as well as the turning platform at the northern end of approx. 1 230 m. The runway was last asphalted in 1997. In addition, the shoulders will be re-asphalted with a width of 7.5 m on each side.
The assignment duration: April-June 2021.
Vis anskaffelsen » Nevnte leverandører:Veidekke Industri as
2020-09-26100814 Traffic Flow Platform North Evenes (The Norwegian Defence Estates Agency)
A traffic flow platform is to be established for planes in the north, 2021. The work is to be carried out as an execution contract in accordance with NS 8405. Start-up April, completion September. The Norwegian Defence Estates Agency has applied in advance and have had a reduced runway length approved for the period 22 April 2021-15 July 2021. Work in the period outside these dates requires coordination and adaptations with all plane movements.
The project will cover the following disciplines:
— …
Vis anskaffelsen »
2018-06-01Parallel Framework Agreements — Consultants Building and Construction — Professions: RIx, Ark, Areal (K-187259) (Avinor AS)
Avinor AS, hereafter called the Contracting Authority, invites tenderers to a competition for the procurement of parallel Framework Agreements for technical consultants for building and construction with the following groups:
1) Air side and outside: RIE, RIVA, RIA (RI Installations), RIM;
2) Building: RIB, RIBr, RIM, RIV, RIE, RID, RIA, RIBfy, RIEn;
3) Ark;
4) Areal.
The consultants can be engaged for assignments within; ideas, regulation, preliminary project, detailed engineering design, engineering …
Vis anskaffelsen »
2018-04-28Nawsarh Rygge — Turnkey contract (Forsvarsbygg)
The Ministry of Justice and Public Security has given the Norwegian Defence Estates Agency the task of facilitating facilities for new rescue helicopters.
The rescue service has bases at Sola, Florø, Ørland, Bodø, Banak and Rygge.
Rygge is the fourth base in the programme.
Vis anskaffelsen »
2017-04-26Non-Schengen Terminal (185252) (Avinor AS)
Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport.
The area is situated east of the eastern pier, at a security checked area of the airport.
The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation during the expansion.
The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a footprint of approx. 5 000 m² and the area of the new building is approx. 26 000 m² including 8 new …
Vis anskaffelsen »
2016-12-16P-185988 — Stavanger Airport, Sola — New asphalt runway 11/29 — Site and asphalt work etc (Avinor AS)
Avinor shall lay new asphalt runway 11/29 at Stavanger Airport in spring 2017. In addition to laying new asphalt, a comprehensive replacement of matter shall be undertaken to improve the wearing ability and the establishment of a concrete cover on parts of the upgraded area. The contract also includes simple electrical work etc. See the tender documentation for further information.
Vis anskaffelsen » Nevnte leverandører:Stangeland Maskin AS
2016-10-19Technical plane service — Hatches and frames Expansion Non-Schengen East (P/T-185326) (Avinor AS)
Avinor AS, Oslo Airport (OSL) is planning the expansion of the Non-Schengen traffic areas, which includes a terminal and air side.
The contract is for the delivery of prefabricated hatches, including frames for fixing onto manholes cast on site, for technical plane service. Each aeroplane apron place shall be established with manholes with hatches for fuel, air, water and fuel. The builder will install the hatches himself.
Vis anskaffelsen »
2016-08-25Site work air side BA/VA (185325) (Avinor AS)
Avinor AS, Oslo Airport (OSL) is planning the expansion of the Non-Schengen traffic areas, which includes a terminal and air side. The contract includes the necessary building and site work for the alteration and establishment of new apron areas as well as other infrastructure and basements and shafts for the building. The contract also includes the expansion and extension of taxiways, culverts and the expansion of an existing surface water pump station.
Vis anskaffelsen »
2015-06-0915/07624 Framework agreement for maintenance services — Bergen airport Flesland (Avinor AS)
Avinor and Bergen airport Flesland intend to enter into framework agreement and a good co-operation with a robust tenderer who has a broad competence in different specialist fields in connection to the maintenance of asphalt, concrete, marking paint, green areas, etc.
See the qualification document and orientation about the procurement.
Vis anskaffelsen »
2015-04-03Pre-qualification: Project 150024, Runway extension and Construction, Ørland, v2 (Forsvarsbygg (The Norwegian Defence Estates Agency))
Project 150024 Runway extension comprises and extension of the existing runway and parallel runway, replacement of lighting systems on the main runway, moving of navigational system and brake cable system, establishing of response and operations roads, extending of the existing noise berm, establishment of surface water network and supplying of electrical power.
The contract will mainly consist of:
— ground-works;
— laying of asphalt runway surface, parallel runway and spaces;
— concrete work runway …
Vis anskaffelsen » Nevnte leverandører:Tore Løkke AS
2015-03-23Pre-qualification: Project 150024, Runway extension and Construction, Ørland (Forsvarsbygg (The Norwegian Defence Estates Agency))
The Norwegian Defence Estates Agency invites tenderers to give tender offers in a contest for negotiation with pre-qualification in connection to the implementation of works for extension of the runway at Ørland.
The contest concerns a procurement above the EEA threshold determined in the Regulation on defence and security procurements (FOSA) § 2-2, and following the rules in this Regulations' part I and II.
Project 150024 Runway extension comprises and extension of the existing runway and parallel …
Vis anskaffelsen »
2015-03-03P-184104 Kristiansand airport — reasphalting the runway — asphalt works etc (Avinor AS)
Avinor plans to reasphalt the runway in summer 2015. The work consists of the following main elements:
— cutting/reasphalting the runway as well as the runway shoulder between taxiways A/B (approx. 100 000 m²);
— improving/strengthening the bearing capabilities of the runway where this is not good enough;
— marking the runway;
— improving manholes etc. for runway lights;
— temporary installations;
The contract mainly consists of asphalt works, as well as site and electro works that are affected by the …
Vis anskaffelsen » Nevnte leverandører:NCC Roads as
2015-03-03P-184105 Kristiansand airport — Reasphalting works on the runway — Electro works (Avinor AS)
Ssummer 2015, Avinor is planning to carry out reasphalting works on the runway The works in this contract includes the following main elements:
— disassembling and reassembling flush marking lights for the runway's centre line/target point, including core drilling/slot coupling for fittings/cables, delivery/installation of cables, spotlights, etc.;
— disassembling and reassembling some flush approach lights, flush runway end lights and flush runway edge lights;
— Establishment of temporary runway end …
Vis anskaffelsen » Nevnte leverandører:Intertec AS
2014-03-07T3 Avinor Flesland 80302 Internal works (Avinor AS)
The procurement comprises complete execution of internal building works on the New terminal at Bergen Airport Flesland. The contract will be carried out as a shared contract according to NS8405. The terminal is divided into seven levels with respectively four technical and three public levels. The gross area of the terminal is 63 000 m² and consists of central building, piers, passenger bridges as well as bridge connections to the current terminal. The terminals main function is the public areas, …
Vis anskaffelsen » Nevnte leverandører:Hent As
2014-02-15T3 Avinor Flesland 80452 Airside Electrical (Avinor AS)
Enterprise 80452 Airside Electrical on the T3 project New Terminal Flesland is the electrical contract for establishing the new Airside to the new T3 Terminal.
The contract comprises runway lights and signs, general electrical for airside, as well as technical aircraft control in connection to the new taxiways and apron areas. For further information see the attached qualification documentation.
Vis anskaffelsen »
2013-12-17T3 Avinor Flesland 80452 Electrical on the airside (Avinor AS)
The 80452 construction of Electrical on the airside within the project T3 for the new terminal at Flesland airport is an electrical contract for the establishment of the new airside associated with the new Terminal T3.
The contract includes runway lights and signs, general electrical airside and the technical aircraft operations related to the new taxiways and apron areas. For further information refer to the qualification documents, which are attached to the original notice published on: …
Vis anskaffelsen »
2013-12-10450894 – Bodø, improvement of runway surface (Forsvarsbygg)
The project includes works with adding new friction cover of epoxy on the main runway at the Bodø main air station. The associated works include among other things preparatory work of repairing damage to the
concrete covering before the runway surface is added, and the after works.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at: http://www.doffin.no/Search/Search_Switch.aspx?ID=312485
Vis anskaffelsen »
2013-11-26P-182945 Stavanger Airport, Sola — Reasphalting runways 2014 — Asphalt works (Avinor AS)
Avinor shall reasphalt the main runway (runway 18/36) with the shoulder as well as parts of runway 11/29 at Stavanger Aiport in summer 2014. Furthermore the contract will include remarking, disassembly/reassembly of affected lighting installations, the establishment of new runway edge light manholes (runway 18/36) and the necessary site works. The extent of the reasphalting of runways/shoulder is approx. 200 000 m for the main runway (runway 18/36) and approx. 35 000 m.
Vis anskaffelsen »
2013-11-26Kristiansand Airport Kjevik. New international termainal. General contract GE-01 (Avinor AS)
The international traffic at Kristiansand Airport Kjevik is increasing and the public areas will have reached a minimum standard in 2014. In addition the areas for passengers from countries outside the Schengen agreement have been extended as temporary solutions. The need for an expansion is approx 4 000 m The new international terminal is planned as an extension towards the north from the existing terminal and as an independent unit. Some of the temporary areas in the current international terminal …
Vis anskaffelsen » Nevnte leverandører:Kruse Smith Entreprenør As
2013-10-10P-182818 Helicopter terminal - K360 Air treatment (Avinor AS)
Avinor AS shall upgrade its helicopter terminal at Stavanger Airport, Sola.
The current terminal building is from 1988/89 and major constructional and technical upgrades are needed. In addition Avinor AS would like more efficient terminal logisitics and better conditions for passengers and there is therefore a need for major alterations and a minor extension to the terminal.
4 contracts shall be procured for this:
— K201 Construction work
— K301 Plumbing installations
— K360 Air treatment
— K401 …
Vis anskaffelsen »
2013-10-10P-182818 Helicopter terminal - K301 Plumbing installations (Avinor AS)
Avinor AS shall upgrade its helicopter terminal at Stavanger Airport, Sola.
The current terminal building is from 1988/89 and major constructional and technical upgrades are needed. In addition Avinor AS would like more efficient terminal logisitics and better conditions for passengers and there is therefore a need for major alterations and a minor extension to the terminal.
Four contracts shall be procured for this:
— K201 Construction work
— K301 Plumbing installations
— K360 Air treatment
— K401 …
Vis anskaffelsen »
2013-09-06Management and operation of the Norwegian Armed Forces fuel facilities (Forsvarets logistikkorganisasjon (FLO))
The Norwegian Armed Forces expects the consumption of services of the management and operation of the Norwegian Armed Forces fuel facilities to be at approx. 40 million Norwegian krone per year, plus the overtime per year, a total of about 45 million per year.
The services shall be delivered to the following locations:
— Bardufoss- The estimated annual through-put of F-35/F-34: 6000-10000m3/annually,
— Andøya - Estimated annual through-put of F-35/F-34: 5000-7000m3/annually,
— Bodø Main Air Base - …
Vis anskaffelsen »
2013-07-17P-182575 Harstad/Narvik airport, Evenes - S&L/ Environment Project - Electrical Works (Avinor AS)
The establishment of a completely new lighting system for runways (the edges of the runway, thresholds, the end of the runways, the centerline / viewpoints) and taxiways (the taxiway centreline lights).
New wiring for the illuminated signs on the RWY / TWY, wig-wag, papi and the approach lights also includes the moving of the individual units. Some completions related to the completion of the apron edge lights.
The assembly (core drilling and slotting the runway surface) for the most of the new lighting …
Vis anskaffelsen »
2013-07-17P-182576 Harstad/Narvik Airport, Evenes - S&L/Environmental project/re-asphalting - Asphalt works (Avinor AS)
Re-asphalting of the runway with shoulders as well as asphalt spreading in connection with guideways which shall be established for removal/new establishment of light system. The contract also includes re-marking and temporary plants.
The extent of the re-asphalting of the runway/shoulders amounts to approx. 170 000 m2 (60 m width and approx. 2 600-2 800 m length). The re-asphalting of runway and shoulders shall initially be executed with milling, followed by asphalt spreading of a new surface so that …
Vis anskaffelsen »
2013-07-17P-182574 Harstad/Narvik airport, Evenes – S&L/Environment Project – Plant works (Avinor AS)
The rectification and expansion of the leveled security area with the transition wires (75 m/300 m) for the runway.
Lowering/removal of terrain with the flight bar part of the security area (75 m-150 m from the runway) and the approach plane.
Removal/buckling objects within the runway safety area.
Expansion of the width of taxiway B.
Establishment of conduits for the new lighting systems (runway lights on the runway and taxiways), new windsock systems, new power supply runway light terminals, …
Vis anskaffelsen »