2026-03-13   Consultant engineering services municipal engineering 2026-2030 (Regionalt innkjøp i Kongsvingerregionen)
The contracting authority intends to enter into framework agreements for municipal engineering disciplines. The work can apply to projects that the municipality has in-house and projects that the municipality has in interaction with other public or private actors. Tenders can be submitted for parts of the assignment, i.e. tenders for the following parts: Sub-tender 1 - Road, pipeline network and public room Lot 2 - Water Treatment Lot 3 - Sewage treatment. Vis anskaffelsen »
2025-06-30   Process in accordance with damsikkerhetsforskriften - Frøylandsdammen (Sandnes kommune)
The contracting authority needs to enter into a contract based on NS 8401 in order to carry out a process in accordance with the dam safety regulations for Frøylandsdammen. Sandnes municipality is the owner of Frøylandsdammen, located just south of hommersåk centre. The river from Frøylandsdammen flows through the centre of Hommersåk to the sea. Frøylandsdammen shall now undergo a re-assessment in accordance with the Damsikkerhetsforskriften §7-5 Reassessment. Before the pond reassessment can be carried … Vis anskaffelsen »
2024-05-28   Framework agreement for consultancy services and engineering design - combination techniques and landslides/danger to nature. (Sunnfjord kommune)
The aim of the notice is to enter into one or several framework agreements for technical consultancy services for two different service groups. It is the eininga Technical Operations that shall benefit from the agreement. The contracting authority will enter into a contract with up to 4 different tenderers in total. It is necessary to submit tenders for one or both of the service groups: 1. Consultancy and engineering design services for municipal engineering, including roads, water, sewage and parks. 2. … Vis anskaffelsen »
2023-05-27   Framework agreement for engineering design and consultancy services, dams and river systems (Trondheim Kommune)
Trondheim municipality, hereafter called the contracting authority, invites tenderers to participate in an open tender contest for contracts in the project ‘Framework Agreement for Engineering Design and Consultancy Services Dams and River Systems'. The contracting authority requests tenders from consultants with the professional, technical and financial basis required for the contract. Furthermore, experience from assignments with relevance to the subject areas mentioned in the tender documents is … Vis anskaffelsen »
Nevnte leverandører: Dr.Techn. Olav Olsen AS Multiconsult Norge AS (hovedenhet) Norconsult AS (Hovedenhet)
2022-12-29   Consultancy services for waterway facilities in Rælingen municipality (Rælingen kommune)
The project will primarily ensure that a number of waterway facilities for which the contracting authority is responsible fulfil the requirements of the dam safety regulations. The consultancy assignment includes a number of different assignments in order to implement the project – and concerns a turnkey delivery of technical consultancy for the project. Vis anskaffelsen »
2022-05-24   Consultancy services on dams (Frevar KF)
FREVAR KF operates Fredrikstad Municipality's waterworks, which produces drinking water for more than 80,000 persons and for industrial customers in Fredrikstad and Hvaler Municipalities, and is part of a reserve water collaboration with Sarpsborg and MOVAR. Click here https://permalink.mercell.com/179933291.aspx. Vis anskaffelsen »
Nevnte leverandører: Multiconsult Norge AS (hovedenhet)
2021-11-05   Framework agreement for Consultancy Services for the execution of hydrological analyses, watercourse hydraulic... (Norges vassdrags- og energidirektorat (NVE))
The agreement shall mainly include the execution of hydrologic and waterworks hydraulic analyses and engineering design of required flood and erosion protection measures. As the security projects are getting more and more complexed and interdisciplinary, the tenderer shall also offer services for associated professional disciplines. The agreement includes ongoing work for selected projects. For each sub-assignment, a call-out will be issued in which a more detailed agreement is made on content, project … Vis anskaffelsen »
Nevnte leverandører: Dr. Blasy - Dr. Øverland Beratende... Multiconsult Norge AS (hovedenhet) Norconsult AS (Hovedenhet)
2021-05-12   Framework Agreement for Building and Municipal Engineering Consultancy Services (Frogn Kommune)
Frogn Municipality would like to enter into framework agreements for consultancy services for the development of plans for land use, as well as the planning and implementation of development projects and major maintenance projects within property and municipal engineering. The aim of the procurement is to cover the municipality's need for various consultancy services within plans for land use and building and municipal engineering installations (roads, water and sewage). Therefore it is possible to … Vis anskaffelsen »
2021-05-06   Framework Agreement for Building and Municipal Engineering Consultancy Services (Frogn Kommune)
Frogn Municipality would like to enter into framework agreements for consultancy services for the development of plans for land use, as well as the planning and implementation of development projects and major maintenance projects within property and municipal engineering. The aim of the procurement is to cover the municipality's need for various consultancy services within plans for land use and building and municipal engineering installations (roads, water and sewage). Vis anskaffelsen »
2020-12-23   Framework Agreement for Watercourse Engineering Consultancy Services (Oslo kommune v/Vann- og avløpsetaten)
Oslo kommune, The Water and Sewage Authority (VAV) is responsible for the management of waterway facilities connected to the water supply. With so many watercourse facilities, there is continually a need for rehabilitation, re-evaluation, main inspection, flood calculations, dam breach wave calculations and assessments regarding classification. VAV tries to carry out one to two rehabilitation projects each year, and must have assistance from a consultant for engineering design and execution of these … Vis anskaffelsen »
2020-02-19   Framework Agreement for Consultant Engineering Services (Time kommune)
The contracting authority would like to enter into a framework agreement for consultant engineering and architect services for small and large investment and maintenance projects in the municipality. Vis anskaffelsen »
Nevnte leverandører: Norconsult AS (Hovedenhet)
2017-10-26   Framework agreement for consultancy services within energy and water resources (Norges vassdrags- og energidirektorat (NVE))
The International Section (IN) in the Norwegian Water Resources and Energy Administration (NVE), hereafter also called the contracting authority, invites tenderers to participate in an open tender contest for framework agreements for consultancy services within energy and water resources management for the projects that IN manages. The type of assignments and the actual thematic areas are described in the tender documentation. Vis anskaffelsen »
2016-03-17   Framework agreement: Consultancy services for waterway facilities (Oslo kommune, Vann og Avløpsetaten (VAV) (Oslo municipality, the Agency for Water and Sewerage Works))
Oslo kommune, The Water and Sewage Authority (VAV) is responsible for the management of waterway facilities connected to the water supply. VAV is responsible for: — 32 dams in the water supply — 12 dams that have been in the water supply or have a cleansing effect in the waterway. — 29 recreational dams — 17 abutment dams/barrier dams — seven transfer tunnels — three bypass tunnels With so many waterway facilities, there is continually a need for rehabilitation, re-evaluations, major inspections, flood … Vis anskaffelsen »
2015-03-27   Detailed engineering design services for a fish barrier in Driva (Miljødirektoratet)
As a part of fighting Gyrodactylus salaris in the river Driva and the adjoining water systems in order to exterminate the salmon parasite, a fish barrier is planned in the river Driva at Snøvasmelan approx. 25 km east of Sunndalsøra along national road 70. An impact assessment of the project, a prepared technical plan, approved by NVE were carried out in an assignment from the County Governor in Møre og Romsdal The basis for the further detailed engineering design services is therefore ready. The project … Vis anskaffelsen »
2013-10-18   Framework agreement, consultancy services in water resource and energy (Norges vassdrags- og energidirektorat (NVE))
The Norwegian Water Resources and Energy Directorate's, henceforth referred to as the Awarding authority, International development aid is regulated through a joint venture agreement between the Awarding Authority and the Norwegian Agency for Development Cooperation. This agreement includes all of the Awarding Authority's activities as consultant for the Norwegian Agency for Development Cooperation, as well as other assignments related to institutional agreements with selected developing countries. In … Vis anskaffelsen »
Nevnte leverandører: Norconsult As
2013-10-03   210419 - Dam improvements Langevatn dam - Review and engineering design works (IVAR IKS (Forsyning))
Review of upgrading a dam to breach safety class 3 and 4 with alterantive solutions. Engineering design services for the chosen solution in accordance with the reviews for 1. Technical plan for approval at NVE. 2. Engineering design services for a description and work drawings for the execution. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=306842 Vis anskaffelsen »
2013-04-04   EØS 013-2013 Framework agreement, waterway engineering consultancy and engineering design services (Bergen kommune)
Bergen municipality, c/o the Water and Sewage department, henceforth referred to as the Awarding Authority, is i.a responsible for operation of waterway systems in Bergen municipality, which have been or are connected to the municipality's water supply system. The operational responsibility includes i.a. 61 dam structures placed under the Norwegian Water Resources and Energy Directorate's (NVE) control and regulations. The Awarding Authority therefore intends to enter into parallel framework agreements … Vis anskaffelsen »
2012-09-28   124/2012 Parallel framework agreements, consultancy, consulting engineers, landscape architects (Oslo Kommune, Vann- og avløpsetaten)
Framework agreements shall be entered into for engineering design within new-plants/renewals, no dig and electro/automation. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=269100. Vis anskaffelsen »
2011-10-06   Consultancy services for waterway sites 113-2011 (Oslo Kommune, Vann- og avløpsetaten)
VAV wishes to enter into a framework agreement with a consultant for consultancy services. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=240579. Vis anskaffelsen »
2011-07-12   Framework agreement-consultancy services dam security (Kristiansand Ingeniørvesen)
Framework agreement regarding flood calculations, DBBB, reconsiderations and possibly detailed engineering design for improvement of dams. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=235654. Vis anskaffelsen »
Nevnte leverandører: Multiconsult AS Sweco Norge As
2011-03-23   Engineering design group-establish. of environmental technical infrastructure for Grønmo waste site (Oslo kommune, Renovasjonsetaten)
In accordance with Oslo City Council decision no 444/04, the waste disposal site situated at Grønmo is decided discontinued and the County Governor required that the disposal of waste should determined from July 2009. In correspondence dated 17.12.200 and 6.5.2010 the County Governor in Oslo and Akershus have made requirements regarding termination and post-operation of the waste site. The waste site will be in a completion phase for the period from 16.7.2004 and until the County Governor’s approval of … Vis anskaffelsen »
Nevnte leverandører: Cowi AS