2024-05-02Construction and assembly of two footbridges at the gateway in Bøyadalen (Statsforvaltaren i Vestland)
Jostedalsbreen National Park Board wishes to accommodate the construction and assembly of two footbridges at the gateway in Bøyadalen. The bridges shall be part of a small network of footpaths for tourists who will see to the Benda glacier. Brown shall be constructed in a combination of wood and corten steel. The assignment is well described in the tender documentation with accompanying documents.
Vis anskaffelsen »
2024-04-15Procurement of contingency bridge equipment (Statens vegvesen)
The contracting authority requests tenders for the delivery of contingency bridge equipment with associated assembly equipment and spare parts, as well as maintenance of the contingency bridge equipment during the equipment’s period of use. The contract also includes technical assistance for engineering design in the operational phase of 10 years from the first delivery.
Vis anskaffelsen »
2023-09-11The purchase of contingency bridge equipment (Statens vegvesen)
The contracting authority requests tenders for the delivery of contingency bridge equipment with associated assembly equipment and spare parts, as well as maintenance of the contingency bridge equipment during the equipment’s period of use. The contract also includes technical assistance for engineering design in the operational phase of 10 years from the first delivery.
Vis anskaffelsen »
2020-06-29Hydrodynamic Resources for Model Research (Statens vegvesen)
In connection with concept development and preliminary project of the floating bridge over Bjørnafjorden [the Bjørna Fjord] there is a need to implement hydrodynamic model research. The contracting authority needs special competence in hydrodynamic and model research in order to contribute to and made the specifications for hydrodynamic model research. SVV [the Norwegian Public Roads Administration] wants a resource person to assist us in this work.
Vis anskaffelsen »
2019-12-24Tactical Element Bridge (The Norwegian Defence Materiel Agency [Norwegian abbreviation NDMA])
The objective for this pre-qualification is to secure qualified candidates demonstrating the ability and skills to meet the tactical element bridge (TEB) requirements in a competition for a contract comprising the total scope for TEBs. Only candidates found qualified and selected under the criteria stated will receive an invitation to tender (ITT). The primary purpose of the candidate's design, development and production of a TEB system shall be for:
— single-span bridge,
— multi-span bridge,
— floating …
Vis anskaffelsen »
2019-12-23National road 555 The Sotra Connection OPS (Statens vegvesen)
The aim of the procurement is to construct a dual carriageway between Storavatnet in Bergen Municipality and Kolltveit in New Øygarden Municipality. The project is to be implemented with OPS as the execution model. The contest will be a negotiated procedure, where the 3 best qualified suppliers will be invited to submit a tender. The chosen tenderer will be completely responsible for the engineering design, construction, financing, operation and maintenance of the contract for 25 years. The contract …
Vis anskaffelsen » Nevnte leverandører:Sotra Link AS
2016-05-25Project E6 Tana Bridge (Statens vegvesen Region nord [The Norwegian Public Roads Administration, Northern Region])
Tana bridge is located on the E6 between East and West Finnmark as part of the national road network between Nordkjosbotn — Kirkenes.
Based on the adopted zoning plan, a new bridge shall be built over Tana river at the Tana bridge settlement. The new bridge shall replace the existing Tana bridge, a flexible and narrow suspension bridge of 220 m from 1948. The new bridge will be constructed 100 metres upstream of the old bridge.
A roundabout shall be built on each side of the bridge. Approximately 780 …
Vis anskaffelsen »
2014-01-21T3 Avinor Flesland 80402 Concrete Constructions - Concrete bridge (Avinor AS)
Overall and preliminary scope of benefits in the contract 80402:
In connection with construction of the new terminal at Flesland, a concrete bridge will be built for upper traffic plaza at the terminals east wall. The bridge will act as the access zone to the terminal and will be connected to the terminal by footbridges.
The upper traffic plaza will be undertaken as a 230m long driving bridge with off and on ramps at each end.
The bridge is designed with column pairs with 18m distance in the longitudinal …
Vis anskaffelsen » Nevnte leverandører:Peab Anlegg AS
2013-06-14E18 Bommestad - Sky: Construction of Farris bridge (Statens vegvesen Region sør (Norwegian Public Roads Administration))
Farris bridge is situated on the E18 as a part of the lot for the new E18 between Bommestad and Sky in Larvik municipality. The E18 shall be constructed as a 4 lane motorway with standard class S9 on the entire stretch. Farris bridge is an inclined suspension bridge with the main span as an integrated cross section of steel and concrete. The main span is 120 m long and consists of two parallel steel boxes connected with transverse bulkheads every 4 metres. Above the steel boxes there is a concrete cover …
Vis anskaffelsen » Nevnte leverandører:Bilfinger Construction GmbH