County Road 773 Steinfjell tunnel was constructed in the 1970's and it currently has an annual traffic count of 200-250 vehicles. The Steinfjell tunnel is in Namsskogan municipality and is approx. 2 100 m. The access to the tunnel is 15 km from the E6 at Brekkvasselv and 22 km from Røyrvik/Limingen. The upgrade of the tunnel mainly includes complete low voltage electro installations and lighting, geological stabilising measures and water and frost protection. In addition the tunnel shall be classified as T5.5, single road with passing places. 5 new passing places shall be blasted and 2 new technical rooms including passing places.
Frist
Fristen for mottak av tilbud var 2015-04-29.
Anskaffelsen ble publisert 2015-03-10.
Leverandører
Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:
Kunngjøring av konkurranse (2015-03-10) Gjenstand Anskaffelsens omfang
Tittel: Road tunnel construction work
Antall eller omfang:
The project can be characterised with the following main amounts:Disassembly and removal of existing electro installations: Approx. 2 100 mRock bolts: Approx. 1 500Shotcrete: Approx. 850 m³Assembly of new water and frost protection: Approx. 16 000 m²Blasting for passing places and technical niches: Approx. 5 600 m³Technical building — complete containers including low voltage installations — distribution and control boards:2Concrete railings. Approx. 2 100 mSigns. Approx. 25Fittings, cable runs, cable installations and guiding lights: Approx. 2 100 mEmergency stations: 9Laying asphalt cover and new wearing course: Approx. 11 000 m².
The project can be characterised with the following main amounts:Disassembly and removal of existing electro installations: Approx. 2 100 mRock bolts: Approx. 1 500Shotcrete: Approx. 850 m³Assembly of new water and frost protection: Approx. 16 000 m²Blasting for passing places and technical niches: Approx. 5 600 m³Technical building — complete containers including low voltage installations — distribution and control boards:2Concrete railings. Approx. 2 100 mSigns. Approx. 25Fittings, cable runs, cable installations and guiding lights: Approx. 2 100 mEmergency stations: 9Laying asphalt cover and new wearing course: Approx. 11 000 m².
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsarbeid i forbindelse med Veitunnel📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Regional eller lokal myndighet
Navn på tildelende myndighet: Statens vegvesen Region midt
Postadresse: Fylkeshuset
Postnummer: 6404
Poststed: Molde
Kontakt
E-post: firmapost-midt@vegvesen.no📧
Telefon: +47 02030📞
A tender conference will be held 24.3.2015 at 12:00, meet at Stjørdal traffic station, Tuftenvegen 6, Stjørdal, Norway.
Gjenstand Anskaffelsens omfang
Kort beskrivelse:
County Road 773 Steinfjell tunnel was constructed in the 1970's and it currently has an annual traffic count of 200-250 vehicles.
The Steinfjell tunnel is in Namsskogan municipality and is approx. 2 100 m. The access to the tunnel is 15 km from the E6 at Brekkvasselv and 22 km from Røyrvik/Limingen. The upgrade of the tunnel mainly includes complete low voltage electro installations and lighting, geological stabilising measures and water and frost protection. In addition the tunnel shall be classified as T5.5, single road with passing places. 5 new passing places shall be blasted and 2 new technical rooms including passing places.
The Steinfjell tunnel is in Namsskogan municipality and is approx. 2 100 m. The access to the tunnel is 15 km from the E6 at Brekkvasselv and 22 km from Røyrvik/Limingen. The upgrade of the tunnel mainly includes complete low voltage electro installations and lighting, geological stabilising measures and water and frost protection. In addition the tunnel shall be classified as T5.5, single road with passing places. 5 new passing places shall be blasted and 2 new technical rooms including passing places.
Antall eller omfang:
The project can be characterised with the following main amounts:
Disassembly and removal of existing electro installations: Approx. 2 100 m
Rock bolts: Approx. 1 500
Shotcrete: Approx. 850 m³
Assembly of new water and frost protection: Approx. 16 000 m²
Blasting for passing places and technical niches: Approx. 5 600 m³
Technical building — complete containers including low voltage installations — distribution and control boards:
2
Concrete railings. Approx. 2 100 m
Signs. Approx. 25
Fittings, cable runs, cable installations and guiding lights: Approx. 2 100 m
Emergency stations: 9
Laying asphalt cover and new wearing course: Approx. 11 000 m².
Referansenummer: 2015/010625
Utførelsessted
Hovedsted eller utførelsessted: County Road 773 — Namsskogan municipality in Nord-Trøndelag.
Juridisk, økonomisk, finansiell og teknisk informasjon Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
HSE self-declaration:
A HSE self-declaration shall be enclosed with the tenders, cf. foa § 17-15 (1).
Tax certificates:
Tax and VAT certificates, not older than 6 months shall be enclosed with the tender. Cf. the Public Procurement Regulations § 17-14.
Working partnerships:
If the tenderer is a working partnership, a declaration of joint and several liability to the builder and third parties must be enclosed with the tender.
Økonomisk og finansiell stilling:
Equity. Solvency
Tenderers are required to have positive equity. If the tenderer is a working partnership, the requirement applies for each participant.
Documentation requirement:
Documentation of equity is to be submitted the tender. Cf. chapter E2, point 4.3.1, form E2-4.3.1.
Documentation of any significant changes to the tenderer's equity and solvency compared to the last accounts audit must accompany the tender.
Minste nivå(er) av standarder: Tenderers are required to have positive equity.
Teknisk og faglig kapasitet:
Experience
Tenderers who are newly established companies who cannot submit references, must be particularly careful to demonstrate that they have the ability to carry out the contract. The tenderer shall report their company formation and employee expertise. Planned organisation for the assignment and CV s for key personnel in the project organisation are extremely important. This also applies for companies that merge or are acquired by another company during the tendering process.
Tenderers who are newly established companies who cannot submit references, must be particularly careful to demonstrate that they have the ability to carry out the contract. The tenderer shall report their company formation and employee expertise. Planned organisation for the assignment and CV s for key personnel in the project organisation are extremely important. This also applies for companies that merge or are acquired by another company during the tendering process.
Experience from equivalent works. Reference projects
The tenderer shall have experience from work of the same nature and degree of difficulty.
Documentation requirement:
Information on such shall be attached with the tender. Cf. chapter E2, point 4.1.1, form E2-4.1.1.
Builder's experiences. Reference projects
NPRA and other builders' experiences with the service provider will be evaluated.
The tenderer is required to show references to relevant contracts that they themselves have carried out in a satisfactory manner.
Conditions which will be evaluated are related to, amongst other things:
— documentation of executed quality;
— fulfilment of contracts;
— compliance with provisions and procedures for HSE;
— compliance with provisions for wages and working conditions;
— compliance with deadlines;
— follow up during the warranty/claims period.
Information about contracts the tenderer has had in the last few years, with names of references at the contracting authority, shall accompany the tender. Cf. chapter E2, point 4.1.2, form E2-4.1.2.
Any assessment forms from previously completed contracts can also be included in the basis for the evaluation.
Other qualification requirements
Use of sub-contractors–Requirement for Declaration of Commitment
Where the service provider is dependent on a sub provider in order to be qualified, the service provider must document for the contracting authority that the service provider will have authority over the necessary resources. This can be documented by the contractor presenting a mutual statement of liability, or equivalent. Documentation is to be enclosed with the tender, cf. chapter E2 - point 4.5.
Where the service provider is dependent on a sub provider in order to be qualified, the service provider must document for the contracting authority that the service provider will have authority over the necessary resources. This can be documented by the contractor presenting a mutual statement of liability, or equivalent. Documentation is to be enclosed with the tender, cf. chapter E2 - point 4.5.
Accident frequency (H1-value)
If the tenderer is a working partnership (supplier group), the requirements apply for each of the participants. The H1-value is defined as the number of work accidents with absence in relation to the hours worked multiplied by 106. The average of the H1-value for the last 3 years should be lower than 15, cf. chapter E2, point 4.2.1, form E2-4.2.1.
If the tenderer is a working partnership (supplier group), the requirements apply for each of the participants. The H1-value is defined as the number of work accidents with absence in relation to the hours worked multiplied by 106. The average of the H1-value for the last 3 years should be lower than 15, cf. chapter E2, point 4.2.1, form E2-4.2.1.
If the H1-value is higher than this, an account shall be given of the developing trend for the H1-value and possibly the F-value, which will express the severity of any high H1-value. Furthermore, a report on whether improvement measures are implemented, and if so, also documentation on the effectiveness of these, should accompany the tender.
If the H1-value is higher than this, an account shall be given of the developing trend for the H1-value and possibly the F-value, which will express the severity of any high H1-value. Furthermore, a report on whether improvement measures are implemented, and if so, also documentation on the effectiveness of these, should accompany the tender.
Education requirement electro installers.
The following documentation requirements for training apply to this contract:
In addition to the education requirement in C2 27.3, the following certification and training shall be documented for each worker in the contract:
The education of the individual electro installer shall be approved by DSB (The Directorate for Civil Protection and Emergency Planning) before mustering at the installation. Safety training, set by the DSB, in accordance with FSE: Regulations on Work and Operation of electrical installations.
The education of the individual electro installer shall be approved by DSB (The Directorate for Civil Protection and Emergency Planning) before mustering at the installation. Safety training, set by the DSB, in accordance with FSE: Regulations on Work and Operation of electrical installations.
The company shall always be correctly registered as regards the relevant disciplines in accordance with the ‘Regulations on electro companies and qualification requirements for work connected to electrical installations and electrical equipment — FOR-2013-06-19-739’ and correctly authorised in accordance with the ‘Regulations on authorisation for companies that carry out installation and maintenance of electronic communication networks — FOR-2011-12-07-1206 (the authorisation regulations).
The company shall always be correctly registered as regards the relevant disciplines in accordance with the ‘Regulations on electro companies and qualification requirements for work connected to electrical installations and electrical equipment — FOR-2013-06-19-739’ and correctly authorised in accordance with the ‘Regulations on authorisation for companies that carry out installation and maintenance of electronic communication networks — FOR-2011-12-07-1206 (the authorisation regulations).
Kontraktutførelse
Innskudd og garantier som kreves: See the tender documentation.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documentation.
Juridisk form som skal antas av gruppen av økonomiske operatører som kontrakten skal tildeles til: See the tender documentation.
Prosedyre
Tilbudets gyldighetsperiode: 2015-07-01 📅
Dato for åpning av tilbud: 2015-04-29 📅
Åpningssted (organisasjon): Statens vegvesen [The Norwegian Public Roads Administration]
Åpningssted (by): Steinkjer
Informasjon om autoriserte personer og åpningsprosedyre: The opening of the tenders is open to the public.
Språk
Andre språk: Norwegian.
Vilkår for åpning av tilbud
Adresse: Byavegen 48
Kunngjøring om tildeling av kontrakt (2015-08-04) Gjenstand Anskaffelsens omfang
Totalverdi for anskaffelsen: 56 319 914 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Prosedyre
Tilbudstype: Ikke aktuelt
Oppdragsgiver Identitet
Navn på tildelende myndighet: Statens vegvesen Region midt (The Norwegian Public Roads Administration, Region Mid-Norway)
Referanse Datoer
Sendt dato: 2015-08-04 📅
Publiseringsdato: 2015-08-07 📅
Identifikatorer
Kunngjøringsnummer: 2015/S 151-279437
Refererer til kunngjøring: 2015/S 51-089491
OJ-S-utgave: 151
Tildeling av kontrakt
Dato for kontraktinngåelse: 2015-06-05 📅
Navn: Hæhre Entreprenør AS
Postadresse: Tangen
Poststed: Vikersund
Postnummer: 3370
Land: Norge 🇳🇴 Informasjon om tilbud
Antall mottatte tilbud: 9