2014-09-18   UFP-11 โ€” Bed and contact wire (Jernbaneverket)
Contractors shall be procured for the construction of the bed and contact wire installations for the development project Farriseidet-Porsgrunn. The contract is for 20.76 km double track and 1.75 km single track. Crushed gravel, sleepers and rails shall be laid, as well as the establishment of the accompanying contact wire installations, including auto transformers. Vis anskaffelsen ยป
Nevnte leverandรธrer: Infranord Norge As
2012-01-24   Contract works, the Lambertseter line, stage 3 (Brattlikollen - Karlsrud) (Kollektivtransportproduksjon AS)
The following works shall be executed (overview, only): โ€” Complete upgrading of the stations Brattlikollen and Karlsrud to Metro standard, โ€” Restoration of 4 concrete structures (2 bridges and 2 pedestrian culverts), โ€” Demolition, mass replacement, reconstruction of 1 200 metres of double track (8, 650-9, 850 km), โ€” The existing conductor rail system shall be disassembled and replaced by a new system made of aluminium, โ€” A new crossing track at Karlsrud shall be established, โ€” Major parts of the โ€ฆ Vis anskaffelsen ยป