2023-05-15Contract M3: Sludge treatment - biogas (MOVAR IKS)
MOVAR shall expand Fuglevik treatment plant (RA) to include sewage water that is now being treated at Kambo treatment plant subject to closure. MOVAR has also been given a new discharge permit, from and including 2026, requirements are made in relation to reduction of phosphor, nitrogen and organic matter. See further information on the project 'Nye Fuglevik Renseanlegg'. This procurement is for turnkey contract M3 - sludge treatment - biogas. The project is to be executed as a turnkey contract model …
Vis anskaffelsen »
2022-12-14Contract M1: Pretreatment and other machine installations (MOVAR IKS)
MOVAR shall expand Fuglevik wastewater treatment plant (WWTP) due to population growth and closure of Kambo WWTP. The wastewater now treated at Kambo WWTP will be transferred to Fuglevik WWTP in the future. The expanded plant’s discharge permit is renewed, and from 2027 the plant must remove both phosphorus, organic matter (BOD/COD) and nitrogen, See further information on the project 'Nye Fuglevik Renseanlegg'. This tender is for Contract M1: Pretreatment, miscellaneous machinery and piping The contract …
Vis anskaffelsen »
2022-11-17Contract M2: Water treatment-separation and bio level (MOVAR IKS)
MOVAR shall expand Fuglevik treatment plant (RA) to include sewage water that is now being treated at Kambo treatment plant subject to closure. MOVAR has also been given a new discharge permit where, from and including 2026, requirements are made in relation to reduction of phosphor, nitrogen and organic matter.
The invitation to tender concerns Contract M2 – Water treatment - Separation and bio level, which includes all treatment processes from sand and fat traps to discharge.
Contract M2 shall be …
Vis anskaffelsen » Nevnte leverandører:Krüger Kaldnes As
2019-10-01Contract for Independent Investigation of an Incident at Kleppe Vannverk — Pre-qualification (Askøy kommune)
Askøy municipality, c/o the Municipal Council shall enter into a contract with a provider for the execution of an independent investigation of the incident where the municipality’s inhabitants were exposed to water-borne contagion through drinking water from Kleppe Vannverk (Kleppe water supply station) in June 2019.
Click here: https://permalink.mercell.com/114355282.aspx
Vis anskaffelsen » Nevnte leverandører:Sintef AS
2017-12-13UV generators for Oset emergency preparedness facility (Oslo Kommune, Vann- og avløpsetaten)
Oslo city does not have sufficient reserve water supplies, it is therefore necessary to build a new facility that shall cover the need for Oslo’s population if Oset water treatment facility (VBA) is not able to produce drinking water of sufficient quality and sufficient quantity.
VAV [the Water and Sewage Authority] shall establish a new UV facility will be carried out with multiple procurements. The establishment of the UV facility will be carried out with multiple procurements. This procurement …
Vis anskaffelsen »
2017-11-14A new water purifying for haemodialyses, Bergen Hospital Trust (Sykehusinnkjøp HF)
The contract shall include the delivery and installation of 1 water purifying plant for haemodialyses, in connection with a dialysis satellite at the new local medical centre in Fjell municipality. Bergen Hospital Trust shall operate the system.
An equivalent system shall be procured and installed in Nordhordaland in 2 years. This means that the contract includes an option for the delivery of 1 additional water treatment system.
Vis anskaffelsen » Nevnte leverandører:B Braun Medical AS
2013-07-10Framework agreement, consultants for several subject areas related to expansion (Rauma kommune)
A. Land planning - zoning plan.
B. Landscape architect.
C. Geotechnics and engineering geology.
D. Project coordinator (construction management).
E. Architect.
F. Municipal engineering (Roads, Water, Sewage).
G. Surveying
NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=300462
Vis anskaffelsen »
2013-05-21Open tender competition for cleaning detergents and equipment (Trondheim Kommune)
The awarding authorioty would like to enter into a framework agreement(s) for cleaning detergents and equipment and for resources for running a swimming pool for the period 1.10.2013–30.9.2015 with an option for a 1+1 year extension.
The awarding authority purchases products covered in this tender for approx. 4 000 000 NOK per annum excluding VAT. The amount is an estimate and is not binding for the municipality. When choosing the supplier(s) it is a prerequisite that the supplier(s) have the capacity to …
Vis anskaffelsen » Nevnte leverandører:BWT Birger Christensen ASStaples Norway As
2013-02-13Competition for the purchase of an audit of the conditions of the sedimentary basins in Norway (Statens vegvesen Vegdirektoratet)
The Awarding Authority would like quotes for the delivery of consultancy services in connection with the mapping of 'A revision of the conditions of the sedimentary basins in Norway', this includes required fieldwork, analysis and reporting.
Only suppliers and subcontractors (including suppliers and subcontractors within the same corporation) that have not assisted the Awarding Authority with the construction of 1 or more of the basins that are listed in Annex 2, will be allowed to submit a bid for the …
Vis anskaffelsen » Nevnte leverandører:Cowi AS
2013-02-12Sør Odal water treatment plant replacement of membranes (Sør Odal kommune)
Concerns the delivery, assembly, testing, reviewing and commissioning of new membranes for rig no. 3 + an option for new membranes for rig no. 2 at the water treatment plant in Sør Odal municipality.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=282628.
Vis anskaffelsen »
2013-02-04Review of the condition of sedimentation basins in Norway (Statens vegvesen Vegdirektoratet)
The awarding authority would like tenders for consultancy services for mapping ”a review of the condition of sedimentation basins in Norway”, this includes the necessary field work, analyses and reporting. The aim of the assignment is to map how cleaning systems function hydraulically, i.e. that the road water reaches the cleaning systems and that foreign water (ground water/terrain water) does not come into the cleaning system and disturb the cleaning processes. The final report shall also include …
Vis anskaffelsen »
2012-10-10K-181919 Purification of PFOS-containing water (Oslo Lufthavn AS)
The contract for the delivery and operation of treatment plant for PFOS-containing ground water.
In a local ground water area at Oslo Airport Gardermoen some very high levels of perfluorooctane sulphonate (PFOS) have been measured, this is above a level that is acceptable. This is due to a release of PFOS-containing fire fighting foams in 2010. PFOS is a pollutant that does not break down in nature and must be removed.
The PFOS-based ground water will be captured by two pump wells and pumped to the …
Vis anskaffelsen »