2024-02-16   Project organisation for the modernisation project for the Gråkallbanen (Trøndelag Fylkeskommune)
Trøndelag county shall procure a combined project organisation for planning, coordinating and implementing the modernisation project for the Gråkall railway. The project organisation shall be responsible for both the procurement of new tram materials and the upgrading of infrastructure throughout the entire project course, this under options. The project organisation is expected to have competence that is broad enough for the execution of all phases, including preliminary engineering design, detailed … Vis anskaffelsen »
2016-12-19   UBF 34 Contact line/Track and UBF 35 High voltage, low voltage, tele (Jernbaneverket [The Norwegian National Rail Administration])
The project is a part of the new double track between Bergen station and Arna and it includes development of the station area in Bergen, from the station hall out to Fløen, as well as new signalling installations. The project also includes the establishment of appropriate track connections between workshop and sidings and the rest of the station's track areas. The actual station, including platforms and platform equipment, is not a part of this project. UBF 34 is a contract with elements from … Vis anskaffelsen »
2013-07-02   Points machine for points for tram rails - tram and town rails (Sporveien Oslo AS)
Point machine for points - tram rails for in the Oslo area. To be attached to the application: System drawings of points including point machines. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=298274. Vis anskaffelsen »
2013-06-27   Track geometry measurements Byspor and suburban tramways (Sporveien Oslo AS)
Track geometry measurements of the tramway network shall be performed at least once a year. Qualification requirements: The service provider of the track geometry measurements must be able to use the measuring equipment (must document this requirement) and shall present reference(s) from equivalent work. Measurements shall be carried out at night between approx. 01.00 and 05.00. Vis anskaffelsen »
2013-02-08   Bybanen i Bergen - C51 Track Construction (Bybanen Utbygging)
Due to a minor error in the prequalification document, this procurement is republished: This procurement covers the track constructions for phase 3 of Bybanen including rail tracks for the main line and tracks in the Depot. The total track length is 19.5 km, excluding turnouts. 6.8 km of double track (or 13.7 km of single track) is to be laid between Rådal and the Bergen airport Flesland and 5.8 km in the depot area. Delivery of Turnouts/ Switches & Crossings is not included in this competition and will … Vis anskaffelsen »
Nevnte leverandører: Rhomberg Bahntechnik Gmbh
2012-11-26   Bybanen i Bergen - C51 Track Construction (Bybanen Utbygging)
This procurement covers the track constructions for phase 3 of Bybanen including rail tracks for the main line and tracks in the Depot. The total track length is 19.5 km, excluding turnouts. 6.8 km of double track (or 13.7 km of single track) is t— be laid between Rådal and the Bergen airport Flesland and 5.8 km in the depot area. Delivery of Turnouts/ Switches & Crossings is not included in this competition and will be a separate competition/contract. The delivery will consist of a number of different … Vis anskaffelsen »
2012-03-16   Hire of track and signal installers (Kollektivtransportproduksjon AS)
Kollektivtransportproduksjon AS has a need to hire signal and track installers. The signal installers will be used in the signal and tele/automation department. The track installers will be used in the track department (underground and tram). Tenders can be given for lots. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=251452. Vis anskaffelsen »
2011-11-14   Turnouts in vignol rail, including sleepers, and turnouts for grooved rail. Spare parts (Kollektivtransportproduksjon AS)
Turnouts in vignol rail points including sleepers, as well as turnouts in grooved rail. In addition spare parts shall be procured for the existing turnouts. Therefore the coordinates of the sleeper placement as well as the placement of holes in the sleepers is the same as in the existing turnouts. Turnouts in vignol rail shall be delivered in the rail types 49E1 and 54E3. It shall also be possible to deliver with crossing with movable point. Turnouts for grooved rail shall be delivered in rail types 60R2 … Vis anskaffelsen »