2012-04-25Inspection of surface finishing on steel - region South (Statens vegvesen Region sør)
The framework agreement includes inspection of surface finishing of steel for old bridge structures as well as inspections and follow up of ongoing works with surface finishing of steel.
Estimated extent of the contract is approx. 750 hours per annum. Call-off against the framework agreement is carried out through miniature contests in accordance with regulations given in the tender documents. Ordinary contract period is from the contract is signed spring 2012 until and including 31.12.2015.
The …
Vis anskaffelsen » Nevnte leverandører:Mesta Drift A/SSafe Control AS