Antall eller omfang
Description Quantity UnitBlasting 113,000 Pfm3Rock for filling in the line 18,600 Pfm3Mass exchange of material 33,700 Pfm3Base course, Ag 21 815 m2Binding layer, Ab 22,060 m2Road surface area, Ska/Agb 32,065 m2Railings, bridge 740 mRailings, steel 1,050 mRailings, concrete 1,110 mDry walls 1,400 m2Environmental tunnel 6,350 m3Bridges 3,200 m3Noise barrier, wood 140 mNoise dampers 480 mLight poles, open road 177 unitsLight fittings in environmental tunnel 152 units.