Antall eller omfang
The project can be described with the following main quantities:— Foot and cycle path: 1 200 m,— Asphalt, tonnes/m2: 8 700 m2,— Electrical installation works, pylons: 44 units,— Contaminated masses to disposal site: 1 700 m3,— Concrete railing partly with fencing: 750 m,— Fence along the foot/cycle path: 400 m,— Kerbstones granite and concrete: 1 520 m,— Excavation masses in the route: 2 200 m3,— Trenches, pipe ducts: 2 000 m,— Trenches water and sewage, including manholes: 700 m,— Walls with foundation, concrete: 150 m,— Ashlar walls: 300 m2,— Relocation of railway tracks: 1 100 m,— Delivery of new sleepers: 750 sleepers,— Points (relocation): 4 units,— Track stoppers, buffers: 2 units.Culvert:— Blasting, loading and transporting: 1 600 tfm3,— Filling, loading and transporting: 1 200 tam3,— Excavation uncompact material, partly compact material: 2 800 m3,— Sheet pile, partly with pre-excavation: 900 m2,— Concrete: 2 350 m3,— Formwork: 2 000 m2,— Reinforcement: 470 tonnes,— Damp proofing: 1 300 m2,— Wearing course/membrane: 1 300 m2,— Railing: 500 m.