The project county road 60 Ugla-Skarstein includes the construction of Vangberg tunnel from Ugla to Vangberg and road in the open air towards Skarstein. Total approx. 5 300 m. Vangberg tunnel is 1 170 m and it shall be constructed in profile T 9.5.
Frist
Fristen for mottak av tilbud var 2016-02-09.
Anskaffelsen ble publisert 2015-12-09.
Kunngjøring av konkurranse (2015-12-09) Gjenstand Anskaffelsens omfang
Tittel: Construction work
Antall eller omfang:
“— Approx. 4 000 m road in the open air;— Approx. 1 200 m long tunnel, profile T 9.5;— 2 rock halls shall be blasted for a technical room and 2 niches;— 2...”
Antall eller omfang
— Approx. 4 000 m road in the open air;— Approx. 1 200 m long tunnel, profile T 9.5;— 2 rock halls shall be blasted for a technical room and 2 niches;— 2 portals, each 15 m;— 1 bridge with an approx. 8 metre span;— The cutting and tunnel entrance in the east is situated on steep side terrain. The road in the open air is partly situated on a new sea filling.
Vis mer Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Bygge- og anleggsvirksomhet📦
Prosedyre
Prosedyretype: Åpen anbudskonkurranse
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Laveste pris
Oppdragsgiver Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Nasjonalt eller føderalt byrå/kontor
Navn på tildelende myndighet: Statens Vegvesen Region vest (The Norwegian Public Roads Administration, Region West)
Postadresse: Askedalen 4
Postnummer: 6863
Poststed: Leikanger
Kontakt
E-post: firmapost-vest@vegvesen.no📧
Telefon: +47 02030📞
Faks: +47 57655986 📠