Antall eller omfang
The work which is now to be carried out includes building of new road and tunnels in Snilldal, altogether 3 360 m, whereby 1 220 m is 2 x 3 lane tunnels (Fossan tunnel and Snilldals tunnel) and a 64 m bridge over Snilldals river as well as connections with the existing road at both ends.In addition, the work includes the completion of approximately 870 m of new road through the existing soil extraction site at Våddånesset as well as connections with existing roads.