New double track Oslo - ski, contract JBT-91, ski st. side tracks

Jernbaneverket

See the tender documents for further information.
Start of works approx. January 2013.
All the work is expected to be completed by 17.8.2014. This includes clearing up and removing equipment.
The main aim of contract JBT-91 is to establish side tracks for train operators at ski station. The works involve technical railway works for the initiative "Establishment of side tracks" and consist of works from phase 00.40 to main phase 20.
Contract JBT-91 Superstructure, contact line, electricity installations, tele installations and signal installations consists of the following main measures:
— Establishment of four side tracks, with train heating installations and service facilities for train operators,
— Technical building south (TBS) with 22 kV switchgear with feed from local distribution network, transformers and switchgear for 1 000 V train heating installations (2 x 2,3 MVA). 400 V supply (500 kVA) for heating points, tele installations and general electrical installations,
— Changed track route for the eastern line,
— Connections to new operation phases in accordance with phase plans. Phases 00.40 to 20.00 and total break.
The signal installations consist of the following main measures:
— Modifications and connections in internal signalling plant (NSI-63),
— Connections to new operation phases in accordance with phase plans. Phases 00.40 to 20.00 and total break.
The trains shall run as normal during the whole of the site works. The work will be carried out close to operating trains and contractors must adjust their safety routines for this. The trains are planned to stop running in several weekends. These are contractual and cannot be moved. The progress (the contractor) must focus on reaching the planned train stops and carrying out the planned assignments when the trains are stopped. It is assumed that the contractor has references from equivalent projects and to a large degree uses employees with relevant experience.
Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=243604.

Frist

Fristen for mottak av tilbud var 2011-12-19. Anskaffelsen ble publisert 2011-11-14.

Leverandører

Følgende leverandører er nevnt i tildelingsbeslutninger eller andre anskaffelsesdokumenter:

Hvem? Hva? Hvor?
Anskaffelseshistorikk
Dato Dokument
2011-11-14 Kunngjøring av konkurranse
2013-01-09 Kunngjøring om tildeling av kontrakt
Kunngjøring av konkurranse (2011-11-14)
Gjenstand
Anskaffelsens omfang
Tittel: railway construction works
Antall eller omfang: See the tender documents.
Metadata for kunngjøring
Originalspråk: engelsk 🗣️
Dokumenttype: Kunngjøring av konkurranse
Kontraktens art: Bygge- og anleggsarbeid
Forskrift: Det europeiske økonomiske samarbeidsområdet (EØS), med deltakelse av GPA-land
Felles innkjøpsordliste (CPV)
Kode: Byggearbeid i forbindelse med jernbaner 📦

Prosedyre
Prosedyretype: Konkurranse med forhandling
Tilbudstype: Innlevering for alle delkontrakter
Tildelingskriterier
Det mest økonomisk fordelaktige tilbudet

Oppdragsgiver
Identitet
Land: Norge 🇳🇴
Type tildelende myndighet: Offentligrettslig organ
Navn på tildelende myndighet: Jernbaneverket
Postadresse: Stenersgt 1D
Postnummer: 0103
Poststed: Oslo
Kontakt
Internettadresse: http://www.jernbaneverket.no/ 🌏
E-post: xkruhan@jbv.no 📧
Telefon: +47 05280 📞

Referanse
Datoer
Sendt dato: 2011-11-14 📅
Innleveringsfrist: 2011-12-19 📅
Publiseringsdato: 2011-11-16 📅
Identifikatorer
Kunngjøringsnummer: 2011/S 220-358385
OJ-S-utgave: 220
Tilleggsinformasjon
(NT Ref:243615).

Gjenstand
Anskaffelsens omfang
Kort beskrivelse:
See the tender documents for further information.
Start of works approx. January 2013.
All the work is expected to be completed by 17.8.2014. This includes clearing up and removing equipment.
The main aim of contract JBT-91 is to establish side tracks for train operators at ski station. The works involve technical railway works for the initiative "Establishment of side tracks" and consist of works from phase 00.40 to main phase 20.
Contract JBT-91 Superstructure, contact line, electricity installations, tele installations and signal installations consists of the following main measures:
— Establishment of four side tracks, with train heating installations and service facilities for train operators,
— Technical building south (TBS) with 22 kV switchgear with feed from local distribution network, transformers and switchgear for 1 000 V train heating installations (2 x 2,3 MVA). 400 V supply (500 kVA) for heating points, tele installations and general electrical installations,
Vis mer
— Changed track route for the eastern line,
— Connections to new operation phases in accordance with phase plans. Phases 00.40 to 20.00 and total break.
The signal installations consist of the following main measures:
— Modifications and connections in internal signalling plant (NSI-63),
The trains shall run as normal during the whole of the site works. The work will be carried out close to operating trains and contractors must adjust their safety routines for this. The trains are planned to stop running in several weekends. These are contractual and cannot be moved. The progress (the contractor) must focus on reaching the planned train stops and carrying out the planned assignments when the trains are stopped. It is assumed that the contractor has references from equivalent projects and to a large degree uses employees with relevant experience.
Vis mer
Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=243604.
Utførelsessted
Hovedsted eller utførelsessted: Ski station, Norway.

Juridisk, økonomisk, finansiell og teknisk informasjon
Vilkår for deltakelse
Egnethet til å utøve yrkesvirksomheten:
(1) Company registration certificate;
(2) Value added tax certificate (national requirement);
(3) Company tax certificate (national requirement);
(4) Self-declaration in compliance with appendix 2 (HSE) of the Norwegian procurement regulations (national requirement).
See the tender documents.
Økonomisk og finansiell stilling:
(1) The company’s most recent annual report including new information of relevance to the company’s accounting figures;
(2) Presentation of the company’s annual accounts, or extracts thereof;
(3) Statement of the company’s turnover, of relevance to this contract, for previous years.
See the tender documents.
Teknisk og faglig kapasitet:
(1) Overview of the company's total manpower;
(2) Manpower proposed for this contract (organisation chart) with names and CV's of the key personnel who will be responsible for its execution (for service and works contracts);
(3) A list of the principal deliveries effected, or main services provided, by the company, in the past 3 years, with the values, dates and recipients (for supply and service contracts);
(4) A statement of the company's health, environment and safety policy;
(5) A statement of the quality assurance/quality control system operated by the company;
(6) A certificate issued by an accredited certification authority attesting to the quality assurance, production or technical capacity of the company, or equivalent documentation (for service and works contracts);
(7) A description of the tools, plant or technical equipment available to the company for carrying out the contract (for works contracts).
See the tender documents.
Kontraktutførelse
Innskudd og garantier som kreves: See the tender documents.
Hovedfinansieringsvilkår og betalingsordninger og/eller henvisning til relevante bestemmelser som regulerer dem: See the tender documents.
Andre særlige vilkår:
The work will be carried out, amongst other things, in and next to tracks in operation and with trains running on them. Therefore there are special requirements for the contractor. See Jernbaneverket's homepage, "supplier information", for further details.
Vis mer

Prosedyre
Minste antall kandidater: 3
Største antall kandidater: 8
Dato for utsendelse av invitasjoner: 2012-02-01 📅
Språk
Andre språk: Norwegian.

Oppdragsgiver
Kontakt
Kontaktpunkt: Utbygging
Adresse til kjøperprofilen: http://www.doffin.no//search/Search_AuthProfile.aspx?ID=AA0051 🌏
E-post: larpet@jbv.no 📧

Referanse
Datoer
Startdato: 2013-01-02 📅
Sluttdato: 2014-08-17 📅

Utfyllende informasjon
Tjeneste hvor informasjon om klageprosedyren kan innhentes
Navn: Jernbaneverket Utbygging
Postadresse: Stenersgt. 1D
Poststed: Oslo
Postnummer: 0103
Telefon: +47 90043103 📞
Kilde: OJS 2011/S 220-358385 (2011-11-14)
Kunngjøring om tildeling av kontrakt (2013-01-09)
Gjenstand
Anskaffelsens omfang
Tittel: Railway construction works
Totalverdi for anskaffelsen: 99 043 750 💰
Metadata for kunngjøring
Dokumenttype: Kunngjøring om tildeling av kontrakt
Forskrift: Den europeiske union, med deltakelse av GPA-land

Prosedyre
Tilbudstype: Ikke aktuelt

Oppdragsgiver
Kontakt
Telefon: +47 05280000 📞

Referanse
Datoer
Sendt dato: 2013-01-09 📅
Publiseringsdato: 2013-01-12 📅
Identifikatorer
Kunngjøringsnummer: 2013/S 009-010686
Refererer til kunngjøring: 2011/S 220-358385
OJ-S-utgave: 9
Tilleggsinformasjon
(NT Ref:278410)

Gjenstand
Utførelsessted
Hovedsted eller utførelsessted: Ski Station, Norway.

Prosedyre
Tildelingskriterier
Kriterium: 1. Price (80)
2. Assignment organisation (10)
3. Assignment execution (10)

Tildeling av kontrakt
Dato for kontraktinngåelse: 2012-05-10 📅
Navn: Infranord Norge As
Postadresse: Storgata 32
Poststed: Oslo
Postnummer: 0183
Land: Norge 🇳🇴
Informasjon om tilbud
Antall mottatte tilbud: 5
Kilde: OJS 2013/S 009-010686 (2013-01-09)