2026-01-23   Alterations to Stålverksvegen 1 – Turnkey contract (NS 8407) (Strand kommune)
Strand municipality shall alter parts of Stålverksvegen 1 from previous shop premises to modern office premises. The project is a part of the municipality ́s commitment to co-localisation and area efficiency (SAMLAR), which shall provide better resource utilisation, lower operational costs and a future orientated working environment. The work will be carried out as a turnkey contract in accordance with NS 8407. Vis anskaffelsen »
2025-09-16   Framework agreement for contractor services - Lillestrøm municipality with several (Lillestrøm Kommune)
Lillestrøm municipality with several shall procure a framework agreement for contractor services. Vis anskaffelsen »
2024-11-14   New Tromsøhall - partnering contract (Tromsø kommune)
Tromsø municipality is holding a competition for an interaction contract for the renovation of Tromsøhallen. See the tender documentation for more information. Vis anskaffelsen »
2020-11-09   Nannestad Municipality Building — Extension and Renovation (Øvre Romerike Innkjøpssamarbeid)
Nannestad Municipality Building — extension and renovation. Vis anskaffelsen »
Nevnte leverandører: Ruta Entreprenør AS
2019-07-09   New Vinne og Ness skole [school] in Verdal kommune [Verdal Municipality] (Verdal kommune)
Renovation, demolition and construction of a new building for Nye Vinne and Ness school. The total area is approx. 5 700 m. Vis anskaffelsen »
Nevnte leverandører: Byggmesteran AS
2019-04-25   19015 Kvadraturen School Centre Climate Project — General Contract (Vest-Agder fylkeskommune)
Work has been ongoing for several years to clarify measures so that Kvadraturen school centre has a satisfactory inside climate. The Norwegian Labour Inspection Authority inspected building B at the school on 11.2.2015. Several shortcomings in the building's climate installations were pointed out at the inspection. The school was given the task of mapping the situation, establishing a plan of measures for immediate improvements, and establishing plans for future permanent measures for improvements. On … Vis anskaffelsen »
2018-03-19   New Kryllingheimen — Turnkey contract (Krødsherad kommune)
The project includes renovation and a new building, which shall be carried out as a turnkey contract. Vis anskaffelsen »
2017-12-14   Framework agreement, Construction Contractor (Nøtterøy kommune)
Færder kommune c/o property management shall enter into a framework agreement on construction contractor services. Vis anskaffelsen »
Nevnte leverandører: Byggmester Harald W Andersen og sønn AS iBygg AS Realbygg Larvik AS Recover Nordic AS Sandås Bygg AS
2017-07-11   Alta lower secondary school, the east wing, renovation and addition (Alta kommune)
Alta lower secondary school, the east wing shall be subject to total renovation and additions with a staircase tower with a lift, goods reception and personnel rooms. Vis anskaffelsen »
2017-06-23   New Tou, 2. construction face, split enterprise (Stavanger kommune)
The project includes the expansion of ‘Maskinhallen’, a concert-scene that will increase its audience-capacity from 270 to 460 people by establishing a new stage in the ‘Dueslaget’. This area has not previously been in use, and requires extensive rehabilitation. Vis anskaffelsen »
Nevnte leverandører: Elektro Comfort as Firesafe AS Hako Total AS Heis1 AS Hove West AS Simex Rør AS Solland AS Thorstein Lund As Uanz Bygg AS Vest Betong AS
2016-06-07   Nordland Hospital Trust Bodo. The Development Project Phase 3, K 233, Carpenters and Joiners, external and internal works (Nordlandssykehuset HF — Senter for utbygging (Nordland Hospital Trust — Centre for Development))
Nordland Hospital currently has a construction development project in process. Phase 2 is currently under completion. This procurement includes structural works connected with ‘internal works’ for Phase 3 — Restructuring and renovation of the existing tower block. K233 — Carpenters and Joiners, external and internal works. Includes i.a. works with new insulated walls on existing facades including all sheet metal works. All internal walls, skirting boards and ceilings, both temporary and final as well as … Vis anskaffelsen »
Nevnte leverandører: Hent As
2016-06-07   The Nordland Hospital Bodø The development project Phase 3, K 232 — Framework (Nordlandssykehuset HF — Senter for utbygging (Nordland Hospital Trust — Centre for Development))
The Nordland Hospital currently has a construction development project in process. Phase 2 is now about to be concluded. This contract includes constructional works related to the contract ‘framework’ for Phase 3; Reconstruction and renovation of the existing high-rise block. The Contract K232 — Framework comprises roughly the following works: It includes i.a. structural works in connection with the addition, wings A and B, as well as a new helicopter platform on the roof. Foundation, concrete, masonry … Vis anskaffelsen »
Nevnte leverandører: Hent As
2015-10-29   The Nordland Hospital, Bodø, the Development Project Stage 3, K230 — Construction works for buildings (Nordlandssykehuset HF — Senter for utbygging (The Nordland Hospital — Centre for Development))
Nordland Hospital currently has a construction development project in process. At present, Stage 2 is in processes with scheduled conclusion during summer 2016. Implementation of Stage 3 is now been authorised. This stage mainly comprises the reconstruction works as well as additions to the existing tower block, the AB wing (a total area of 24 000 m). Vis anskaffelsen »
2014-04-03   Nordland Hospital Trust Bodo. Development project, Phase 3, K 230. Structural works (Nordlandssykehuset HF - Senter for utbygging)
Nordland Hospital currently has a construction development project under way. Phase 2 is currently being implemented, and the scheduled completion date of the new K-Bldgs is August 2014, while the renovation of the old H/N wing at the end of 2015/2016. This procurement includes construction work for Phase 3. Phase 3 will start in the autumn of 2014. This phase mainly includes complete renovation and construction of the existing high-rise building (AB wing). The renovation of the AB wing intended to start … Vis anskaffelsen »