Anskaffelser: Nordlandssykehuset HF โ€” Senter for utbygging (The Nordland Hospital โ€” Centre for Development)

2 arkiverte anskaffelser

Nordlandssykehuset HF โ€” Senter for utbygging (The Nordland Hospital โ€” Centre for Development) har historisk anskaffet bygge- og anleggsvirksomhet, deler av eller komplette byggekonstruksjoner samt anleggsarbeider og byggearbeid.

Nyeste anskaffelser av Nordlandssykehuset HF โ€” Senter for utbygging (The Nordland Hospital โ€” Centre for Development)

2015-10-29   The Nordland Hospital, Bodรธ, the Development Project Stage 3, K230 โ€” Construction works for buildings (Nordlandssykehuset HF โ€” Senter for utbygging (The Nordland Hospital โ€” Centre for Development))
Nordland Hospital currently has a construction development project in process. At present, Stage 2 is in processes with scheduled conclusion during summer 2016. Implementation of Stage 3 is now been authorised. This stage mainly comprises the reconstruction works as well as additions to the existing tower block, the AB wing (a total area of 24 000 m). Vis anskaffelsen ยป
2015-10-29   The Nordland Hospital Bodรธ, the Development project Stage 3, K330 โ€” Pipe systems (Nordlandssykehuset HF โ€” Senter for utbygging (The Nordland Hospital โ€” Centre for Development))
Nordland Hospital currently has a construction development project in process. At present stage 2 is in process with scheduled conclusion during summer 2016. Implementation of stage 3 is now been authorised. This stage mainly comprises the reconstruction works as well as additions to the existing tower block, the AB wing (a total area of 24 000 m). Vis anskaffelsen ยป