2014-07-1320-2030 Bøkfjord bridge (Statens vegvesen Region nord)
The E105, which runs from Hesseng in Kirkenes to Storskogelva (the border station with Russia), will be upgraded with a new road, tunnel and bridge. A new bridge will be built at Elvenes over the Pasvik River, where this enters the Bøk fjord. The new bridge will be built approx. 200 m downstream of the existing bridge.
The bridge consists of approach spans (viaducts) in concrete with a 120-meter steel network arch bridge as the main span. Total length of the new bridge is 284 (26 + 120 + 138). The bridge …
Vis anskaffelsen »
2013-05-03Contract E05 Superstructure 2013 Bjørnfjell passing loop (Jernbaneverket)
In order to increase the capacity on the Ofoten Line, the railway station shall be expanded to a station with 3 long tracks, approx. 1 100 metres, adapted for simultaneous arrivals which can manage minimum 750 metres long trains.
From track 1 just west of the sub passage station on km 40, 13 - 40, 28, with entrance from east, a new sidetrack shall be developed. Establishment of a wide cutting with an eastbound operating road along the south side of the tracks. The existing platform shall be demolished …
Vis anskaffelsen » Nevnte leverandører:Taraldsvik Maskin As