2024-03-22   National road 9 Hoslemo-Gjeskelid (Statens vegvesen)
The project comprises the construction of just over 6 km of new National Road 9 on the stretch Hoslemo-Geiskelid in Bykle municipality. The new road route almost follows the current route, with some exceptions where the road line shall be straightened out. Several exits shall be relocated/reconstructed, including exits at Berdalsbru and Geiskelid, and some minor access roads shall be established in this connection. The new National Road 9 shall have a road width of 7.5 metres. The project is a part of a … Vis anskaffelsen »
2018-11-27   Heating, Water and Sewage and Green Areas, Kodlidalen F1 (Gjesdal kommune)
Gjesdal Municipality has decided to develop the regulated residential area Kodlidalen area F, plan 1122_201705. The area consists of roads, footpaths and paths, green areas and play areas, sanitation installations and plots. The plots are split between detached plots and concentrated dense development with elements of low-rise buildings for a total of up to 200 units. Vis anskaffelsen »
2018-07-31   Project Leirvika, establishment of industrial area (Hammerfest Terminalen AS)
The objective of the procurement is to establish an industrial area in Leirvika south of Hammerfest. The project primarily comprises blasting mountains and placing fill out in the ocean. The area shall be cleared for the construction of 2 quays. Vis anskaffelsen »
2015-02-05   Framework agreement, excavation, blasting and transport services (Ski Kommune)
With this Ski kommune, henceforth referred to as the contracting authority, requests tender for a framework agreement involving excavation, blasting and transport services. In connection with ongoing operations and maintenance of the contracting authority's buildings, outdoor areas, water and sewage systems, etc., there will be a requirement for excavation and landscape gardening works, with accompanying transport of machines, equipment and masses. The contracting authority has a requirement for … Vis anskaffelsen »
Nevnte leverandører: Alvim Entreprenør Herstad AS Svein Grøstad
2014-05-01   E01 – Preliminary works (Jernbaneverket)
Rombak station is the middle of 5 stations on the Ofot railway between Narvik and the Swedish border. The station is 20.8 km measured from the Fagernes terminal in Narvik and approx. 21.1 km from the Swedish border. Contract E01 is for parts of the ground work/substructure for an extension to Rombak passing loop on the stretch 20.460 km - 22.200 km. This includes an expansion of the rock cuttings along the western part of the station area including transport the mass. The contract includes using the mass … Vis anskaffelsen »