Anskaffelser: Installasjon av turbiner
5 arkiverte anskaffelser
Installasjon av turbiner har blitt anskaffet av organisasjoner som BIR Avfallsenergi AS, Lofotkraft Produksjon AS og MOVAR IKS.
Historisk har leverandører innenfor dette området vært Adigo AS, FINCANTIERI S.p.A., Fortum Sverige AB, Rainpower Small Hydro, Rainpower Small Hydro AS og Teksal Hineco As.
- Installasjonstjenester (bortsett fra programvare) (9 nye anskaffelser)
Nyeste anskaffelser av installasjon av turbiner i Norge
2021-11-02
6 MW Steam turbine driven generator set (Tafjord Kraftvarme AS)
The objective of the procurement process is to replace the Employer's damaged steam turbine with a new steam turbine driven generator set. The new machinery with auxiliary systems shall be installed in the same location as the old machine. Steam production will remain unchanged from original design. New foundations will be made by the Employer according to contractor footprint, load, and other interface information. Click here: https://permalink.mercell.com/166448605.aspx. Vis anskaffelsen »
The objective of the procurement process is to replace the Employer's damaged steam turbine with a new steam turbine driven generator set. The new machinery with auxiliary systems shall be installed in the same location as the old machine. Steam production will remain unchanged from original design. New foundations will be made by the Employer according to contractor footprint, load, and other interface information. Click here: https://permalink.mercell.com/166448605.aspx. Vis anskaffelsen »
2019-03-28
The Procurement of Micro-Gas Turbines for Fuglevik Treatment Plant (MOVAR IKS)
Micro-gas turbines shall be installed and commissioned at Fuglevik Treatment plant. The micro-gas turbines shall use bio-gas produced at the Treatment plant as engine fuel. The contractor is responsible for including all the required equipment for an operational and well-functioning plant. Vis anskaffelsen »
Micro-gas turbines shall be installed and commissioned at Fuglevik Treatment plant. The micro-gas turbines shall use bio-gas produced at the Treatment plant as engine fuel. The contractor is responsible for including all the required equipment for an operational and well-functioning plant. Vis anskaffelsen »
2017-09-01
Service contract for steam turbines at an incineration plant in Rådalen (BIR Avfallsenergi AS)
8-year service contract for the 2 steam turbines at an incineration plant in Rådalen, Bergen. Vis anskaffelsen »
8-year service contract for the 2 steam turbines at an incineration plant in Rådalen, Bergen. Vis anskaffelsen »
2011-09-06
Skarg power plant: electro/mechanical package (Otra Kraft DA)
One singel contract covering: Vis anskaffelsen »
One singel contract covering: Vis anskaffelsen »
2011-03-08
New electromechancial equipment Solbjørn power station (Lofotkraft Produksjon AS)
Extent of the delivery: Turbine, turbine regulator and apparatus and control plan for Solbjørn power staton. The delivery shall be complete, ready assembled, tested and comissioned. The buyer is free to reject all of or parts of the tender. The delivery includes workshop inspections and inspection of sub suppliers, work wages, food and lodgings, social expenses, insurance, security, complete drawings, descriptions, operation and maintenance manuals, services in the guarantee period, administration and … Vis anskaffelsen »
Extent of the delivery: Turbine, turbine regulator and apparatus and control plan for Solbjørn power staton. The delivery shall be complete, ready assembled, tested and comissioned. The buyer is free to reject all of or parts of the tender. The delivery includes workshop inspections and inspection of sub suppliers, work wages, food and lodgings, social expenses, insurance, security, complete drawings, descriptions, operation and maintenance manuals, services in the guarantee period, administration and … Vis anskaffelsen »